Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flo971628B 26-07 (Floyd)

Closed
DASIowa-009-RFB-WRBWL_CY26-07State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The project, identified as Flo971628B and bid number 26-07 in Floyd County, Iowa, seeks a contractor to construct a breakpoint nutrient reduction wetland with estimated construction costs between $200,000 and $300,000. Work includes approximately 10,800 cubic yards of earthwork, installation of 1,202 square feet of steel sheet pile, 1,977 linear feet of drainage tile, 437 tons of riprap, 44.5 tons of granular foundation material, 87 cubic yards of concrete grout, 175 linear feet of straw wattle, 430 linear feet of silt fence for erosion control, and seeding of 7.1 acres. The project must be completed by June 15, 2027, with buffer seeding no later than June 30, 2027, and structure seeding no later than September 15, 2027, all within the approved seeding period. The bid submission deadline is 3:00 PM local time on Wednesday, August 26, 2026, through the Iowa Management of Procurement and Contracts System (IMPACS), with a public bid opening held at the same time via Microsoft Teams. Bids must include a 10 percent bid bond and be submitted on official forms, and bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing. A pre-bid conference is scheduled for August 11, 2026, at the City of Floyd City Park, attendance at which automatically enrolls bidders on the plan holders list. Contract documents, including detailed plans and specifications prepared by ISG Inc.’s Spencer Pech, P.E., are available online and must be strictly followed. The successful bidder must furnish a performance and payment bond equal to 100 percent of the contract value and, if a non-Iowa corporation, must provide proof of authorization to operate in Iowa. The Division reserves the right to reject any or all bids and waive minor irregularities. Evaluation is based solely on lowest responsible bidder using a Lowest Price Technically Acceptable method, with responsibility determined by compliance with registration, financial standing, and absence of prior defaults. All questions regarding plans and specifications must be submitted in writing by August 18, 2026, with copies sent to both the

General Info

Floyd County wetland project: $200K–$300K, earthwork, steel sheet pile, tile, riprap, seeding; bids due Aug 26, 2026 via IMPACS.

Agency

Place of Performance

Not specified

Set-Aside

NONE

Documents

11

009-RFB-WRBWL_CY26-07 Constructed Nutrient Reduction Wetland

PDF, High priority: read this firstrfb
High

Bid Bond Document for Nutrient Reduction Wetland Project Flo971628B

PDF, High priority: read this firstbid-bond
High

FLO971628B Final Technical Specifications for Wetland Floyd IA

PDF, High priority: read this firstspecifications
High

FLO971628B Nutrient Reduction Wetland Construction Plans

PDF, High priority: read this firstconstruction-plans
High

Flo971628B Nutrient Reduction Wetland Project - Construction and Admin Forms Appendix I

PDF, High priority: read this firstcontract-document
High

Flo971628B Nutrient Reduction Wetland Project Construction Contract Bid No. 26-07

PDF, High priority: read this firstifb
High

Flo971628B Nutrient Reduction Wetland Project Notice to Bidders

PDF, High priority: read this firstnotice-to-bidders
High

Flo971628B Nutrient Reduction Wetland Project Proposal Acknowledgement Affidavit

PDF, High priority: read this firstproposal-acknowledgement-affidavit
High

Flo971628B Schedule of Prices Worksheet

PDF, High priority: read this firstschedule-of-prices
High

Floyd County Wetland Geotechnical Engineering Report FLO971628B

PDF, High priority: read this firstgeotechnical-report
High

FL0971628B Final Hydrology & Hydraulics Report

PDF, Low priorityengineering-design-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa
Contacts1 person available
OfficeIA
Organization / AgencyIowa
Office AddressIA
Contacts

Full Description

Show more
Project ID: Flo971628B Bid Number: 26-07 Project Counties: Floyd Project Engineer: ISG, Spencer Pech, P.E. The attached project is currently advertised for bid. Interested bidders may find general information about this project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to the IDALS website, https://iowaagriculture.gov/dscwq/requests-proposals. Sealed bids will be received by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality (Division), via the Iowa Management of Procurement and Contracts System (IMPACS), until 3:00 PM local time, Wednesday, August 26, 2026. The bid opening, open to the public, will be held through IMPACS at 3:00 PM local time, on Wednesday, August 26, 2026, when bids will be read aloud. Interested parties may call in to hear the bid opening using the Microsoft Teams call-in number: +1 (555) 000-0000,,352050218#. Bids must be submitted on the appropriate bid forms provided and shall include a bid bond in the amount of ten percent (10%). Bidders must also be registered with the Iowa Department of Inspections, Appeals & Licensing. This project is for a breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure, riprap, concrete grout, seeding and erosion control. This project includes about 10,800 cubic yards of earthwork, installation 1,202 square feet of steel sheet pile, water control structure with inlet riser and drawdown pipe, 1,977 linear feet (LF) of tile installation, 437 tons of riprap, 44.5 tons of granular foundation material, 87 cubic yards of concrete grout, 175 LF of straw wattle and 430 LF of silt fence for erosion control and 7.1 acres of seeding. The estimated construction cost range for this project is $200,000 to $300,000. Construction will commence within 7 days of the preconstruction meeting, unless otherwise mutually agreed upon. Construction deadline: 06/15/2027 Seeding deadline-buffer: 06/30/2027 (Buffer Seeding must be done within seeding period) Seeding deadline-structure: 09/15/2027 (Structure Seeding must be done within seeding period) A pre-bid conference will be held at 10:00 AM, on August 11, 2026 at the City of Floyd City Park, 902 Pearl St, Floyd, IA 50435, telephone: +1 (555) 000-0000. Attendance at the pre-bid conference by prospective bidders is not mandatory but is encouraged. The Plans and Construction Specifications governing the construction of the proposed improvements have been prepared by Spencer Pech, P.E., ISG Inc, and are hereby made a part of this notice by reference and the proposed contract shall be executed in compliance therewith. Copies of the Contract Documents, including Plans, Construction Specifications, and Bid Package, are available through the website links: https://das.iowa.gov/vendors/bidding-opportunities#vendor-bid-opportunities · View Other Agency Hosted Solicitations (keyword: wetland or Contact: Tracy Blocker) In order to be included on the plan holders list, which is required to be able to receive meeting minutes, addenda and an updated plan holders list, interested parties must make a written or verbal request to the Division by telephone: +1 (555) 000-0000, or by e-mail: contact@example.gov. Bidders who attend and sign-in to the pre-bid conference will be added to the plan holders list. A printed copy of plans and construction specifications can be viewed by appointment by contacting Tracy Blocker, Division (contact@example.gov, or +1 (555) 000-0000. Printed copies of specifications and plans will be provided to the successful bidder. The successful bidder shall be required to furnish a Performance/Payment Bond in an amount equal to one hundred percent (100%) of the contract price. Questions concerning the Plans and Construction Specifications should be in writing and addressed to Spencer Pech, P.E., contact@example.gov, and must copy Tracy Blocker, Division, contact@example.gov. All other questions concerning other Contract Documents should be addressed to Tracy Blocker, Division, contact@example.gov or +1 (555) 000-0000. To be considered in a final addendum, written questions must be received by 3:00 PM on August 18, 2026. The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities. BIDDER LOGIN - https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities. If the successful bidder is a non-Iowa corporation, the bidder shall submit proof to the Division, prior to the execution of the contract, of authorization by the Secretary of State to do business in Iowa.

More opportunities from Iowa

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS