Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Floating Work Plant and Marine Construction Support

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the provision and operation of floating work platforms and marine vessels to support construction activities on the river wall and middle lock structures, requiring specialized marine equipment and skilled operational personnel to ensure safe and efficient execution in a riverine environment. Performance is required at a location with ZIP code 15108, and the work is classified under NAICS code 237990 for other heavy and civil engineering construction. This is a subcontract solicitation with a total small business set-aside, meaning only small businesses certified under the SBA program are eligible to respond. The opportunity was posted on July 10, 2026, with proposals due by 3:00 PM Eastern Time on July 28, 2026, and is managed under the Department of Defense by the W072 Endist Pittsburgh office.

General Info

Small business subcontract for marine work on river wall at ZIP 15108, due July 28, 2026, DoD managed.

Agency

Department Of Defense → W072 Endist PittsburghView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

PA, 15108

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W072 Endist Pittsburgh
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide and operate floating work platforms and work boats to support construction on the river wall and middle lock structures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and maintenance initiative for aviation infrastructure at the Port of Seattle, focusing on critical airfield systems and safety enhancements. Key components include replacing aging airfield lighting circuits that exhibit low megger readings with new LED fixtures and signage to improve visibility, energy efficiency, and reliability. The project also involves the replacement of deteriorating pavement sections and vital underground utilities to ensure structural integrity and operational continuity. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and the implementation of regrading and storm drainage systems to eliminate ponding that attracts wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. This initiative is part of the AIRFIELD 2028 ALL PROJECTS bundled under NAICS code 237990 and is being managed by the Aviation Project Management Group. The procurement is forecasted with a posted date of July 18, 2026, and the primary point of contact is Yanet Maldonado of the Port of Seattle, reachable via phone and email. All work is expected to occur on-site at the airport, with no specified set-aside preferences or small business targeting outlined. The scope reflects a multi-faceted approach to enhancing safety, compliance, and long-term operational resilience across the airfield environment.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract involves a comprehensive modernization and safety upgrade of the airfield infrastructure at the Port of Seattle, focusing on critical systems that enhance operational reliability and compliance with aviation safety standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility, energy efficiency, and maintenance performance. The scope further encompasses the replacement of deteriorating airfield pavement and essential utilities to prevent failures and ensure uninterrupted airfield operations. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter bird activity, and the regrading of areas with ponding issues coupled with new storm drainage infrastructure to eliminate standing water that attracts wildlife. Additionally, the project includes replacing failing flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency services during critical incidents. The work is part of the larger AIRFIELD 2029 ALL PROJECTS initiative under NAICS code 237990, managed by the Aviation Project Management Group of the Port of Seattle. Solicitations for this forecasted procurement are open with Yanet Maldonado listed as the primary point of contact for inquiries. All work will be conducted at the Port of Seattle airfield facilities, with an anticipated timeline aligned with the 2029 planning horizon to coordinate with broader infrastructure upgrades.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract, titled 2027 Airfield Project - Contract 1, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a broad range of airfield infrastructure upgrades aimed at enhancing safety, efficiency, and compliance. Key components include the replacement of airfield lighting circuits with poor megger readings with modern LED fixtures and signs, improving visibility and reliability while reducing long-term maintenance. Simultaneously, failing pavement sections and critical utilities across the airfield will be removed and replaced to ensure structural integrity and operational continuity. Wildlife hazard mitigation is a major focus, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signs to deter birds, and comprehensive regrading and storm drainage installation to eliminate ponding areas that attract wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid emergency access and compliance with safety standards. All work is scheduled under a forecasted timeline with a posting date of July 18, 2026, and falls under the NAICS code 237990 for other heavy and civil engineering construction. Primary point of contact for inquiries is Jay Kim of the Port of Seattle, reachable via email or phone, with Mengqi Wu serving as the project manager. The contract is not currently soliciting bids but is posted as a forecast to notify potential bidders of upcoming opportunities. The place of performance is at the Port of Seattle’s airfield facilities, though specific city or state details are not provided in the data. Interested parties are directed to the provided UI link for further information and future solicitation details. The contract is structured without a set-aside designation, meaning open competition is anticipated.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance with aviation standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signage to improve visibility and reduce energy consumption. Simultaneously, failing pavement sections and critical utility systems will be removed and replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation efforts are underway to reduce bird and animal activity near runways and taxiways by removing turf edge dams, installing anti-perching devices on signs, and addressing ponding issues through regrading and the installation of new storm drainage infrastructure. Additionally, deteriorated flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response teams. The project is officially titled 2027 Airfield Project - Contract 2, forecasted for release on July 18, 2026, under NAICS code 237990 for other heavy and civil engineering construction. It is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Moraa Omwega and Project Manager David Neds available for inquiries. All work is expected to take place on-site at the Port of Seattle’s airfield facilities, with no set-aside type specified. The contract reflects a multi-faceted modernization initiative designed to improve safety, reduce maintenance costs, and support long-term airfield sustainability.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Community Park Signage and WayfindingThe contract involves the furnishing and installation of equipment, facilities, and services necessary to upgrade trail infrastructure within a community park, with strict emphasis on protecting Red Butte Creek throughout all activities. Scope of work includes re grading and resurfacing the existing trail, relocating or installing new irrigation heads, replacing timber steps, constructing timber retaining walls, installing concrete steps with metal railings, building crib walls and boulder retaining walls, and implementing rootwad and rock streambank slope protection to stabilize the natural environment. All work must adhere to the specifications outlined in the Contract Documents and prioritize environmental preservation. This solicitation, titled Community Park Signage and Wayfinding, is issued under numbers PRK20033 and PRK24004 by the State of Utah and was posted on July 17, 2026, with responses due by August 5, 2026. The project is located in Utah and does not specify a particular city or zip code. The solicitation is open for bids through the Utah BonfireHub platform and does not indicate any set aside type, NAICS code, or organizational classification. While the primary focus is on trail and erosion control improvements, the contract title suggests a secondary component related to signage and wayfinding, though no explicit details on signage are provided in the work description.
Utah

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
South Cobb Water Reclamation Facility Secondary Clarifier RehabilitationsThe South Cobb Water Reclamation Facility is undertaking the rehabilitation of four of its five secondary clarifiers, with Clarifier #3 having failed and requiring urgent repair. The work encompasses a full range of rehabilitation activities including thorough cleaning of all interior and exterior surfaces, reconstruction of the drive and mechanical systems for Clarifier #3, repairs to deteriorated concrete structures, and recoating of metal components with protective paint. Critical components such as the scum baffle, effluent weirs, scum beach supports, and both inner and outer feed wells will be replaced to restore operational integrity. All specified tasks are detailed in the accompanying construction documents to ensure compliance with technical and safety standards. The project is being managed by the Water System of Cobb County, Georgia, with performance taking place at the facility located in Marietta. Solicitation T3028 was posted on July 17, 2026, and responses are due by August 27, 2026, at 4:00 PM. The procurement is classified under a state and local government (SLED) agency type with no specific set-aside provisions. Interested parties should direct inquiries to Linda Weaver, Senior Administrative Assistant for the Water System, via email at linda.weaver@cobbcounty.gov or by phone at 770-419-6334. All work must be performed on-site at the facility in Marietta, Georgia, with no alternative performance locations permitted.
Water System

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
Federal
Dashields Locks and Dam Hydraulic System UpgradeThe Dashields Locks and Dam Hydraulic System Upgrade project requires the complete demolition and replacement of the existing hydraulic system at the Coraopolis, Pennsylvania facility along the Ohio River. This includes removing all old motors, pumps, reservoirs, piping, valves, manifolds, and hydraulic fluid, with embedded piping being drained, cut flush, and abandoned in place. The contractor must install three new hydraulic power units (HPUs) inside two newly constructed two-story buildings on the land and middle lock walls, and a fourth HPU on an elevated platform in the river wall, all designed and built per contract drawings and performance specifications. New stainless-steel piping and manifold-mounted components will connect these HPUs to the existing hydraulic cylinders—nine of which will be supplied by the contractor and five by the government. The project also mandates the installation of new electronic control panels at each HPU and an additional panel in the middle wall operations building, along with new control consoles located inside three existing and one newly built one-story control shelter. Electrical work involves removing outdated buckets, wiring, switches, and hardware, while new power and control cabling must be installed within existing motor control centers. Concrete demolition and installation are required for building foundations and routing utilities, and minimal steel grating will cover new utility trenches. A geotechnical and civil site analysis must verify structural integrity and drainage, and all new equipment must undergo testing and commissioning before handoff. Due to the site’s location on the Ohio River, construction must be performed using a floating work plant and work boats. All as-built drawings must be stamped by a registered professional engineer. The work must be completed within 730 days of the written Notice to Proceed, under a Firm-Fixed-Price contract awarded as a 100% Small Business Set-Aside under NAICS Code 237990, with a size standard of $45 million. Offerors must be registered in SAM.gov with active status and registered in PIEE with the Proposal Manager role to submit bids, with the RFP expected on or about June 18, 2026, and proposals due by July 28, 2026.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 10 days
View Details
NAICS: 238350
Federal
Industrial Flooring and Grating InstallationThe contract titled Industrial Flooring and Grating Installation requires the installation or replacement of industrial flooring and metal grating within machinery housing to ensure safe and reliable access for crew members during maintenance and operational activities. The work is scoped specifically to enhance workplace safety by providing durable, slip-resistant, and load-bearing surfaces in high-risk industrial environments, with a focus on areas critical to equipment access and personnel movement. This is a subcontract opportunity set aside entirely for small businesses under the SBA’s Total Small Business Set-Aside provision, aligned with NAICS code 238350 for specialty trade contractors engaged in floor and wall covering installation. The solicitation was posted on July 8, 2026, with responses due by 3:00 PM EDT on July 30, 2026, and the place of performance is designated as 15681, indicating the work will occur at a Department of Defense facility managed by W072 Endist Pittsburgh. The contract does not specify a point of contact or physical address details, and all work must comply with federal and defense standards for industrial safety and structural integrity. Interested small businesses must submit proposals by the deadline to be considered for award, with performance expectations centered around safety compliance, timely execution, and adherence to technical specifications for flooring and grating systems in demanding industrial settings.
Finish Carpentry Contractors

POSTED

10 days ago

DEADLINE

in 12 days
View Details