Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Forestry and Parks - Request for Quotes - Gregoire Lake Provincial Park Sanitary & Electrical Upgrades

Active
AB-2026-05782International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, issued by Alberta Forestry and Parks under RFQ 27PAR8074, seeks a contractor to perform minor sanitary and electrical upgrades at Gregoire Lake Provincial Park. The project involves several technical tasks, including the installation of concrete septic tank vault covers, the termination of tracer wires within protective conduits, and the application of spray-foam sealing for voids. Additionally, the scope requires the installation of pressure-treated 4x4 marker posts at specific locations such as stub-outs and valve sites, as well as the placement of cast iron cleanout frames with concrete collars around forcemain valves. All necessary materials, including concrete hatch covers and sanitary cleanout pads, have already been delivered and are available on-site at the park. The contract is managed by Project Manager Michael B. Edwards and is located in Alberta. Interested parties must submit their responses by the deadline of September 9, 2026, at 8:00 PM. The primary objective of these works is to enhance the park's infrastructure to support its various amenities, such as campsites, day-use areas, and utility systems, while ensuring that electrical and sanitary components are properly protected during routine maintenance.

General Info

Alberta Forestry and Parks seeks contractor for sanitary and electrical upgrades at Gregoire Lake.

Agency

Forestry and ParksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / Agency
Forestry and Parks
View Agency Profile
Office AddressN/A
Contacts
Michael B. EdwardsProject Manager

Full Description

Show more
PROJECT BACKGROUND: Gregoire Lake Provincial Park is located 19 km south of Fort McMurray on Highway 63 and 10 km east on Highway 881. This popular park consists of 140 campsites to the public that are nicely situated within mixed forest near Gregoire Lake that are suitable for tents or recreational vehicles. In addition, to the front country campsites there are several day use areas with a playground, shower building, toilet buildings, potable water and sanitary sewer systems. The scope of work involves installing concrete septic tank vault covers supplied by the Parks Division, including proper termination of tracer wire and spray‑foam sealing of voids. It also includes installing pressure‑treated 4x4 marker posts at stub-outs, cleanouts, and valve locations; placing cast iron cleanout frames with concrete collars around forcemain valves; and terminating tracer wires within protective conduit to prevent damage during routine park maintenance. The Concrete Hatch Covers, Cast Iron Cleanout Frames with Concrete Collars, and Sanitary Cleanout Pads have already been delivered and are currently onsite at Gregoire Lake Provincial Park. The goal of RFQ 27PAR8074 is to undertake minor works throughout the park. Alberta Parks is currently operating the park. Please refer to the RFQ for project objectives and scope of work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located along Country Village Road in Jurupa, California. Managed by Filanc on behalf of the Jurupa Community Services District, the project has an engineer's estimate of $36,000,000. The solicitation covers a wide array of specialized construction scopes, including pipe installation, valves, welding, disinfection, cathodic protection, jack and bore, asbestos pipe removal, paving, and electrical and instrumentation/controls. Additionally, the work encompasses supporting services such as videography, testing and inspections, settlement monitoring, surveying, traffic control, and stormwater pollution prevention (SWPPP). This procurement is subject to strict domestic sourcing requirements, specifically compliance with American Iron and Steel (AIS) and Buy American and Build America (BABA) standards. The solicitation is a Small Business set-aside and actively encourages participation from various socioeconomic categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, and Veteran-Owned or Service-Disabled Veteran-Owned Small Businesses. Interested parties must submit their quotes by the deadline of 2:00 PM on September 18, 2026. Plans and specifications are available upon request through the designated point of contact, Julia Masaitis, at bids@filanc.com.
Filanc

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Forestry and Parks

Same awarding agency

NAICS: 541330
International
Forestry and Parks - Request for Proposal - DESIGN, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES for Pigeon Lake Provincial Park (PLPP) Zeiner Campground – Check-in Booth Replacement
Solicitation # AB-2026-05628
The contract pertains to the design, engineering, and construction administration of a new modular check-in booth at Zeiner Campground within Pigeon Lake Provincial Park, replacing an existing temporary facility. The project requires the removal of the current structure and the installation of a fully functional, code-compliant, and accessible booth equipped with customer service windows, staff workspace, an exterior ice freezer, lockable storage, and a staff washroom. The design must adhere to the Crown Land Infrastructure Standard Development Guidelines and encompass integrated architectural, structural, mechanical, electrical, plumbing, and communications systems. Site improvements include grading, roadway modifications, vehicle queueing areas, a small staff parking zone, firewood storage compliant with CLISDG, upgraded signage following AFP standards, and enhanced accessibility features wherever feasible. The successful proponent will also manage regulatory approvals, permit applications, tender documentation, cost estimates, and full construction administration through to project close-out, including record drawing submission. The work is to be completed in phases from project initiation through construction, with commencement required by September 14, 2026, and final completion by February 29, 2028.
Engineering Services

POSTED

14 days ago

DEADLINE

in 7 days
View Details
NAICS: 722320
International
Forestry and Parks - Request for Proposal - Firebase Catering and Janitorial Consulting Services
Solicitation # AB-2026-05563
The Forestry and Parks Division of Alberta is seeking qualified consultants to provide catering and janitorial oversight services across 35 fire bases and incident camps located in 10 Forest Areas throughout the province. Seasonal fire personnel residing at these camps rely on contractor-provided meals and cleaning services, and the consultants hired under this contract are responsible for regularly assessing the quality, safety, and compliance of these services with Alberta Health standards. Assessments must be documented using a standardized template, and any significant findings require immediate notification to on-site officials and a detailed written report submitted within 24 hours. Consultants also serve as advisors to camp supervisors, contractors, and forestry staff, offering expert guidance to improve operational standards and ensure consistent service delivery. Successful proponents will be assigned to one of three designated geographic work areas for the duration of the contract, though occasional travel to camps outside their primary region may be required, with travel arrangements agreed upon in advance. The role demands a strong understanding of food safety protocols, sanitation regulations, and camp operations in remote, high-pressure environments. Up to four contracts may be awarded through this competitive solicitation process, with proposals due by August 28, 2026. Primary contact for inquiries is Mike Kingsbury, Wildfire Prevention Officer, reachable via email or phone provided in the solicitation.
Caterers

POSTED

18 days ago

DEADLINE

in 4 days
View Details
NAICS: 541330
International
Forestry and Parks - Request for Proposal - ENGINEERING, DESIGN AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES at Moose Mountain Parking Upgrades at Kananaskis Public Land Use Zone
Solicitation # AB-2026-05557
The Consultant will be responsible for reviewing and validating the Integrated Development Plan for parking area upgrades at three locations within the Kananaskis Public Land Use Zone — the Base of Moose Mountain Road, the 2 Kilometer Parking Area, and the Top of Moose Mountain Road — with total new disturbances of approximately 0.429 hectares across the sites. This includes conducting field validation of proposed improvements, refining designs based on ground conditions, constructability, environmental constraints, regulatory compliance, traffic flow, parking functionality, and operational needs, all while adhering to approved disturbance limits unless additional approval is obtained from Alberta Forestry and Parks. The Consultant must apply proven non-urban park design practices throughout all project phases, from assessment and conceptual design through detailed design, regulatory approvals, tender documentation, construction administration, and final project close-out. The work requires full engineering and design services to deliver safe, efficient, and environmentally responsible parking infrastructure upgrades, including improved traffic circulation, vehicle movement, and site access. The project must be initiated within five business days after contract execution and completed by February 28, 2028, with all design, approvals, and construction oversight delivered on schedule. The locations are precisely defined by geographic coordinates, and the Consultant must work closely with the Province to ensure alignment with all regulatory, environmental, and operational expectations. The project is managed by Alberta Forestry and Parks, with Monica Purewal serving as the primary point of contact, and the solicitation number AB-2026-05557 governs all aspects of engagement.
Engineering Services

POSTED

18 days ago

DEADLINE

in 10 days
View Details
NAICS: 237110
International
Forestry and Parks - Request for Proposal - ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES Potable Water and Wastewater Infrastructure Assessment and Refurbishment
Solicitation # AB-2026-05555
The contract entails comprehensive engineering and construction administration services for the assessment, planning, design, and implementation of potable water and wastewater infrastructure improvements at Beauvais Lake Provincial Park in Alberta. The proponent will manage all phases from initial evaluation through to project close-out, ensuring alignment with technical, financial, environmental, operational, and stakeholder needs. For wastewater, the focus is on consolidating existing systems into a regionalized approach wherever feasible, with clear justification required for any site-specific alternatives, including isolated facilities like the park office. The Consultant is expected to rely on prior assessments, records, and targeted site evaluations rather than conducting an extensive options analysis, streamlining the scope to practical and justifiable solutions. For potable water, the assessment will identify deficiencies and advance designs for authorized upgrades, with no intention to replace the recently installed distribution system unless necessary for connections, protection, or localized modifications. The project is scheduled to commence in September 2026 and conclude by October 2028, with proposals due by September 3, 2026, under solicitation number AB-2026-05555. The work is being procured by Alberta Forestry and Parks, with Aaron Faber serving as the primary point of contact. The place of performance is at NW29-5-1-W5M, and the services require integration of regulatory approvals, contractor procurement support, construction administration, and commissioning. The scope emphasizes efficiency, feasibility, and lifecycle cost considerations, particularly in wastewater infrastructure, while ensuring the potable water system enhancements support current operational requirements without unnecessary redundancy.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 10 days
View Details