Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 23, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Worth District Corps of Engineers Soliciting Comments on the Potential Use of Project Labor Agreements (PLAs) in Brownsville, TX

Closed
W9126G-21-R-0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 12 hours ago

DEADLINE

in about 16 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 13 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Brownsville, TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
Contacts2 people available
OfficeFORT WORTH, TX, 76102-6124, USA
Office AddressFORT WORTH, TX, 76102-6124, USA

Full Description

Show more
The Corps of Engineers Fort Worth District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $25 million) for the following project: Rio Grande Valley (RGV) 11, Design-Build Border Infrastructure Project 2 Miles of US-Mexico Border wall and fence in Brownsville, TX. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: a. Should PLAs be executed on selected large dollar contracts within the above referenced location by the Fort Worth District? What other factors should the Corps consider before deciding to include PLA provisions in a Fort Worth District contract? What type of project should or should not be considered for PLA? b. Is the use of PLAs effective in achieving economy and efficiency in Federal procurement? What is the estimated relative cost impact, or any other economies or efficiencies derived by the Federal Government, if using PLAs? Will a PLA impact the cost of submitting an offer? c. Is the use of PLAs effective in producing labor-management stability? Have labor disputes or other labor issues contributed to project delays in the local area? d. Is the use of PLAs conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? e. Projects will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on projects that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? f. Are there concerns by prime contractors on the availability of skilled construction labor? Information may reference current apprenticeship statistics and workforce age demographics. g. Completion of anticipated projects will require an extensive performance periods. Will a PLA impact the completion time? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? h. Where have PLAs been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of this project? i. Will the use of PLAs impact the ability of potential Offerors and subcontractors to meet small-business utilization goals? Please provide your comments via e-mail to benjamin.j.aldrich@usace.army.mil no later than 4 December, 2020 at 4:00 PM Eastern Time.

More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 236220
New
Federal
SPECIAL NOTICE: Akeroyd Blood Donor Center - Joint Base San Antonio - VIRTUAL INDUSTRY DAY
Solicitation # PANSWD-26-P-0000031412
The U.S. Army Corps of Engineers Fort Worth District, in support of the Defense Health Agency, is planning the construction of the Akeroyd Blood Donor Center at Joint Base San Antonio, Fort Sam Houston, Texas. This project will be executed as a Progressive Design-Build (PDB) effort under Other Transaction Authority (OTA) pursuant to 10 U.S.C. 2808a, meaning it is not subject to the Federal Acquisition Regulation. The scope involves the creation of a 15,750 gross square foot facility designed to support 60 to 80 daily blood donations, featuring specialized areas for reception, screening, donation, recovery, processing, testing, shipping, and administration. Key technical requirements include the installation of a 750-kW generator for critical systems and a design that maintains separate flows for visitors and staff. The project has a programmed amount of 39.5 million dollars, with a construction cost limitation of approximately 33.97 million dollars and a proposed performance period of 730 calendar days from the notice to proceed. The acquisition strategy utilizes a streamlined, two-step competitive selection process focused on a holistic, most qualified best-value assessment rather than the lowest price. First, interested firms must submit a qualifications-based white paper detailing corporate experience with similar integrated acquisition strategies, key personnel qualifications, and an understanding of the PDB process. Up to three finalists will then be invited to mandatory one-on-one pitch meetings to evaluate their collaborative capabilities, technical expertise, and agility in problem-solving. To be eligible, offerors must maintain active registration in SAM.gov, possess a Unique Entity Identifier, and provide confirmation of their status as a Non-Traditional Defense Contractor. The official solicitation is anticipated for release in December 2026, with a target contract award date in June 2027.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
Joe Pool Dam Slide Repairs
Solicitation # W9126G26BA010
Solicitation W9126G26BA010 is a competitive 100% Total Small Business Set-Aside for firm-fixed-price civil works construction services to repair four shallow slides (Slides 18, 20, 21, and 28) on the upstream and downstream dam embankment slopes at Joe Pool Lake in Grand Prairie and Dallas, Texas. The scope of work includes removing slide debris, excavating slide areas with bench-cutting and keyway installation, lime-treating and compacting soil to restore design contours, and performing final surface restoration using riprap on upstream slopes and topsoil with vegetation on downstream slopes. The project is structured with a base bid for Slide 21 and two options: Option 1 for Slides 18 and 28, and Option 2 for Slide 20. The contract will be awarded to the responsible bidder providing the lowest responsive Total Evaluated Price, which is the sum of the base CLIN and all option CLINs. Bidders must submit their offers electronically via the Procurement Integrated Enterprise Environment (PIEE) by October 27, 2026. Mandatory requirements include SAM registration, a bid guarantee, and the provision of performance and payment bonds. The contractor must comply with Davis-Bacon Act prevailing wage requirements, MIL-STD-129 marking standards, and NIST SP 800-171 cybersecurity assessments. Inspection and acceptance will occur at the work site, with payment processed electronically through Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS