FRE 180 Landscape Mitigation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The FRE 180 Landscape Mitigation project, managed by Caltrans District 6 – Fresno/Bakersfield, is designed to fulfill biological and visual mitigation requirements for State Route 180 Two-Way Left-Turn Lane project 06-1A460 through the planting of 57 native oak trees—25 of which are Blue Oaks—and 60 additional trees within the riparian areas of the Mill Creek Watershed, all located within Caltrans right-of-way along postmiles 91.48 to 92.46 in Fresno County. The work is structured to satisfy the conditions of a 1600 permit and is categorically exempt under CEQA Class 4(b), which applies to minor vegetation alterations and new landscaping. A temporary irrigation system, designed and installed by the contractor, will be implemented to ensure the survival of the newly planted trees, with all excavation limited to a maximum depth of two feet to minimize soil disturbance and environmental impact. The project is posted as a forecast with no solicitation number, indicating it is in a planning stage, and no contract value, pricing, or payment details are provided. All work must adhere to environmental mitigation standards under the 1600 permit, and compliance oversight is managed by Caltrans, with Javier Almaguer as Environmental Office Chief and Chelsea Starr as Associate Environmental Planner serving as primary points of contact. No formal contract type, evaluation factors, clause text, or award methodology is specified, suggesting this may proceed under simplified acquisition procedures or state-level exemptions. The place of performance is clearly defined, but there are no identified delivery schedules, FOB terms, invoicing methods, accountability for inspection or acceptance, or detailed requirements for packaging, marking, or subcontracting. While a certified document of exemption is referenced as a required attachment, no representations, certifications, socioeconomic status disclosures, or key personnel clauses are included, and there are no provisions for security clearances, option periods, or organizational conflict of interest requirements. The project relies primarily on environmental compliance and physical execution rather than complex federal contracting mechanisms.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
