This Government Contract opportunity from Department Of Defense was posted on July 29, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY14 MCA PN 059779 Echo Pier Restoration, U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands

Awarded
W9128A-16-B-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Solicitation W9128A-16-B-0002, issued by the U.S. Army Corps of Engineers Honolulu District, is for the Echo Pier Restoration at the U.S. Army Kwajalein Atoll (USAKA) in the Republic of the Marshall Islands. This comprehensive construction project involves extensive marine and civil works, including the installation of new concrete encasements, storm walls, and pipe foundations, as well as the restoration of the onshore building featuring warehouse, office, and utility areas. The scope of work encompasses civil demolition, debris removal, concrete pavement jointing, and the implementation of cathodic protection. Electrical requirements include the installation of a temporary unit substation, medium voltage systems, and communication ductbanks. The project is governed by strict technical specifications and quality control standards, requiring the use of the Critical Path Method for scheduling and adherence to IBC 2012 and ACI 318 for structural tests and inspections. Detailed engineering plans prepared by AECOM outline multiple construction phases and options, supported by geotechnical boring logs and historical as-built records. The procurement process included several amendments to refine technical specifications, address requests for information, and extend submission deadlines, with final requirements covering everything from reinforcing steel standards to hazardous materials handling and site protection.

General Info

Contract Value

$61,728,987.11

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands, HI, MHL

Set-Aside

NONE

Award Issued Date

Documents

32

04_AsBuilts_1961-1977 - Pender Pluggage Pier Repairs

PDF, High priority: read this firstspecifications
High

16b2-Am-0003 Drawings 01 - Structural Tests and Inspections

PDF, High priority: read this first18 pages · specifications
High

16b2-Am-0003 Section 01 32 00 Project Schedule

PDF, High priority: read this first295 pages · specifications
High

16b2-Am-0004-Drawing-03

PDF, High priority: read this firstspecifications
High

A.2.11.3 ECHO PIER PLANS RTA 6 - New Con Encasement

PDF, High priority: read this first40 pages · specifications
High

Amendment 0002 - Echo Pier Restoration (W9128A-16-B-0002)

PDF, High priority: read this firstamendment
High

ECHO PIER PLANS - Civil Demolition Notes

PDF, High priority: read this firstspecifications
High

Echo Pier Plans - Concrete Pavement Jointing Plan

PDF, High priority: read this firstspecifications
High

ECHO Pier Plans - Onshore Temporary Unit Substation TE1 Layout

PDF, High priority: read this first32 pages · specifications
High

ECHO PIER PLANS RTA 5

PDF, High priority: read this firstspecifications
High

Echo Pier Restoration - Boring Logs B-6 and B-7

PDF, High priority: read this firstspecifications
High

Kwajaleine Missile Range As-Builts 1989-1995

PDF, High priority: read this firstspecifications
High

USAKA Echo Pier Specifications

PDF, High priority: read this first1384 pages · specifications
High

W9128A-09-D-0023-0012 AM-0003 Echo Pier Restoration Drawings

PDF, High priority: read this first27 pages · specifications
High

W9128A-09-D-0023-0012 AM-0004 Drawing S-011

PDF, High priority: read this first39 pages · specifications
High

W9128A-09-D-0023-0012 Echo Pier Restoration Drawings

PDF, High priority: read this first38 pages · specifications
High

W9128A-09-D-0023-0012 Echo Pier Restoration Electrical Plans

PDF, High priority: read this first34 pages · specifications
High

W9128A-09-D-0023-0012 Echo Pier Restoration Plans

PDF, High priority: read this first20 pages · specifications
High

W9128A-09-D-0023-0012 Echo Pier Restoration Plans

PDF, High priority: read this first103 pages · specifications
High

W9128A16 B0002 Amendment AM-0001

PDF, High priority: read this first45 pages · amendment
High

W9128A16B0002 Amendment AM-0003

PDF, High priority: read this first27 pages · amendment
High

W9128A16 B0002 Amendment AM-0004

PDF, High priority: read this first55 pages · amendment
High

W9128A-16-B-0002 Echo Pier Restoration

PDF, High priority: read this first117 pages · ifb
High

W912A-09-D-0023 Echo Pier Restoration - Section 01 90 00 Miscellaneous Provisions

PDF, High priority: read this first310 pages · specifications
High

55r (v10).pdf

PDF, Low priority1 page · other
Low

As-Built 1953-D.C. Svc (1953)

PDF, Low priorityspecifications
Low

District Pulse Works Office - As-Built Records

PDF, Low priorityother
Low

Facility 605 Replacement of Siding - As-Builts

PDF, Low priorityspecifications
Low

FY 86 BMAR PROJ TR86-6 Repair Echo Pier As-Builts

PDF, Low priorityspecifications
Low

Restoration of Cargo Pier - As-Builts (1979-1987)

PDF, Low priorityspecifications
Low

USAG-KA Food and Lodging Estimate Worksheet

XLSX, Low priority2 pages · other
Low

01_AsBuilts_1948-1956.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

NAICS code changed from 236220 to 237990. The notice description changed.

Deadline changed

Response deadline changed from Jul 1, 2016 to Apr 21, 2016.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 21, 2016 to May 5, 2016.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The response deadline was removed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline added: Jun 23, 2016.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Honolulu
Contacts2 people available
OfficeFORT SHAFTER, HI, 96858-5440, USA
Office AddressFORT SHAFTER, HI, 96858-5440, USA
Contacts
Dayna N. MatsumuraContract Specialist
Jennifer KoContracting Officer

Full Description

Show more
This announcement constitutes a Pre-Solicitation notice (synopsis) in accordance with FAR Subpart 5.2. The U.S. Army Corps of Engineers, Honolulu District hereby announces its intent to issue a solicitation entitled, "FY14 MCA PN 059779 Echo Pier Restoration, U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands" as described within this announcement. This project is a design-bid-build solicitation, utilizing Sealed Bidding procedures prescribed at FAR Part 14. The Government intends to issue a formal solicitation via an Invitation for Bid (IFB) in accordance with FAR Part 14, which will follow this announcement and will take place no sooner than 15 days from the publication of this announcement. Solicitation plans and specifications will be made available for viewing and/or downloading on the Federal Business Opportunities (FedBizOpps) website located at https://www.fbo.gov/ on or about February 18, 2016. It is the bidder's responsibility to check for any posted changes to the solicitation. The North American Industry Classification Code (NAICS) for this requirement is 236220 (Commercial and Institutional Building Construction). The small business size standard for this NAICS code is $36,500,000 average annual revenue. The Government intends to award a firm-fixed price construction contract as a result of this solicitation. Project Description: This design-bid-build project is to repair and modern an existing pier at Kwajalein Atoll, and construct two new general purpose storage facilities and installation of infrastructure and utility systems. This project is in a remote location with a highly corrosive, hot, humid, and salt laden environment. Pier work will include encapsulating a portion of the pier and filling the area, installing new piling, and installation of new decking. Work includes splash zone areas, repairs to existing berths, installation of new anchor rods, repair to pile caps, provide marine fenders, bollards and chocks, Antiterrorism/Force Protection measures, Energy Monitoring and Control Systems (EMCS) connections, and building information systems. Work also includes demolishing an existing general purpose storage facility. Supporting facilities includes utility systems supporting the pier (electric, potable water, non-potable water, fire water, sanitary sewer service, lighting, and communications) to include installation of new utility connections appropriate to each berthing location. The estimated performance of period is 800 calendar days. Project magnitude is $40,000,000 to $60,000,000. A pre-bid site investigation and pre-bid conference will be conducted by the Government at U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands on March 17, 2016 and March 18, 2016, respectively. The pre-bid conference will be held on March 17, 2016 at 2:00 p.m. at the Command Conference Room at Building 730. The pre-bid site investigation will be held on March 18, 2016 at 8:30 a.m. at the Echo Pier, Dock Security Checkpoint, Building 623. Individuals attending will need to leave Honolulu International Airport (HNL) on Wednesday, March 16, 2016 and depart on Kwajalein (KWA) on Friday, March 18, 2016. All planholders (prime contractors, subcontractors, and suppliers) are urged to attend. Due to limited logistical support, only one representative from each firm will be allowed to travel for the purposes of attending the pre-bid site investigation and conference. Representatives who plan to attend will need to contact Ms. Dayna Matsumura at contact@example.gov and Ms. Jennifer Ko at contact@example.gov and provide a completed 55r and Food and Lodging worksheet by February 28, 2016. Any subcontractors and suppliers attending the pre-bid site visit and conference will need to indicate who the prime contractor is on the form 55r. All planholders (prime contractors, subcontractors, and suppliers) who previously submitted a completed 55r and Food and Lodging worksheet, must resubmit a revised 55r and revised Food and Lodging worksheet by February 28, 2016. It is the bidder's responsibility to check for any posted changes to the solicitation. Solicitation documents will not be issued on compact disc (CD) unless the Government determines that it is necessary. Bidders must have and/or maintain an active registration with the System for Award Management (SAM) website to be eligible for a Government contract award. To register in SAM, go to https://www.sam.gov.

More opportunities from Department Of Defense → W2SN Endist Honolulu

Same awarding agency

NAICS: 236220
New
Federal
$495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U.S. Army Corps of Engineers, Honolulu District
Solicitation # W9128A26RA007
The U.S. Army Corps of Engineers, Honolulu District, is soliciting a 100% Small Business Set-Aside Multiple Award Task Order Contract (MATOC) for Design-Build and Design-Bid-Build construction services across the State of Hawaii. This Indefinite Delivery, Indefinite Quantity (IDIQ) vehicle has a total cumulative capacity not to exceed 495 million dollars, with individual firm-fixed-price task orders estimated to range from 2,000 dollars to 35 million dollars. The contract consists of a five-year base period with one six-month option to extend. The scope of work encompasses general construction, including electrical and instrumentation, structural efforts, demolition, site restoration, and safety remediation such as asbestos and lead-based paint abatement. The government intends to award five to seven contracts using a two-phase best value trade-off selection process. Phase 1 evaluates offerors based on past performance, organization and management, and a go/no-go bonding requirement. Phase 2 focuses on a seed project involving a construction narrative, drawings, a schedule, and price. Once the MATOC is established, task orders will be awarded based on criteria including price, schedule, technical solutions, and innovation. Performance requires adherence to Davis-Bacon Act labor standards, Buy American requirements, and strict quality control plans, with final acceptance contingent upon a multi-stage government inspection process. Proposals must be submitted via the Procurement Integrated Enterprise Environment (PIEE) in searchable PDF format.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 2 months
View Details
NAICS: 236220
Federal
FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
Solicitation # W9128A279A001
The U.S. Army Corps of Engineers is seeking a qualified partner for the design and construction of a Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center in Oahu, Hawaii. This project is intended to partially mitigate a parking shortfall of 2,161 spaces and will be executed using a Progressive Design-Build approach under Other Transaction Authority. The scope of work encompasses the full design and construction of the facility, including comprehensive site improvements such as grading, utilities, storm drainage, roadway connections, pedestrian sidewalks, landscaping, and exterior lighting. The resulting facility must be designed for a minimum lifespan of 40 years and adhere to DoD Unified Facilities Criteria regarding energy efficiency, building envelope, and integrated systems performance. The acquisition will utilize a streamlined two-step competitive selection process. In the first step, interested offerors will submit a Statement of Qualifications in the form of a White Paper, from which the government intends to down-select three of the best-qualified offerors. These selected firms will then be invited to provide Pitch Presentations as the final evaluation phase. The resulting agreement will be Firm-Fixed-Price, with costs for successive design and construction milestones agreed upon as the design progresses. The project is divided into two phases: the first focusing on design and pre-construction services, and the second covering final design and construction. An Industry Day is scheduled for November 17, 2026, with a target award date anticipated between April and May 2027.
Commercial and Institutional Building Construction

POSTED

14 days ago

DEADLINE

in 15 days
View Details
NAICS: 531120
Federal
Military Recruiting Lease for office space 5,300 to 5,800 SF required
Solicitation # DACA455270014200
The U.S. Army Corps of Engineers, Honolulu District, is soliciting proposals for a full-service, turnkey lease of 5,300 to 5,800 gross rentable square feet of office space for Armed Forces Recruiting purposes in Honolulu, Hawaii. The required space must be located within a delineated area bounded by River Street to the north, Ward Avenue to the south, Ala Moana Boulevard to the east, and South Vinyard Boulevard to the west. The lease term is four years and eleven months, with the government maintaining termination rights. Key facility requirements include 24-hour unrestricted access, comprehensive communications infrastructure, a secondary exterior exit, and lighted parking for approximately twelve government vehicles, with additional private vehicle parking available within a four-block radius. The award will be based on the best value, weighing price and technical factors, such as location and neighborhood quality, equally. All construction and safety enhancements must be treated as tenant improvements with no government reimbursement. The lessor is responsible for all operating costs, real estate taxes, and insurance, including a public liability limit of at least 1 million dollars. Compliance with ADA/ABAAS accessibility standards and specific seismic safety objectives is mandatory. Interested offerors must be registered in the System for Award Management and submit their electronic proposals to the designated point of contact by November 15, 2026.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

24 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS