Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of The Interior was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--FY26 PARADIGM DISKING

Closed
140L3726Q0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
East Fork Scott River Forest Health Implementation Project
Solicitation # 2025-47-065
The East Fork Scott River Forest Health Implementation Project, managed by the Shasta Valley Resource Conservation District in Siskiyou County, California, focuses on improving forest health, enhancing wildlife habitat, and reducing the risk of severe wildfires within the Beaver Valley Headwaters Preserve. The project involves hazardous fuels and vegetation treatments across up to 397 acres, including an initial 263 acres and a subsequent amendment adding 134 acres on lands managed by The Wildlands Conservancy. Key deliverables include 186 acres of ridgeline shaded fuel breaks, 124 acres of shaded fuel breaks along Highway 3, 38 acres of pile burning, and the removal of invasive Dyer's Wood along roads. Implementation methods consist of non-commercial manual thinning, pruning, mastication, chipping, hand piling, and pile burning. The project is conducted under the California Environmental Quality Act (CEQA) and has been granted a Negative Declaration, indicating no significant environmental impacts. Strict operational standards are in place, including the exclusion of heavy equipment from specific watercourse buffers and the prohibition of vehicle operations during saturated soil conditions. Special protections are mandated for cultural resources and the California Condor, with specific noise and habitat disturbance buffers around occupied nests. Project oversight includes inspections of refueling areas and adherence to a Categorical Waiver of Waste Discharge Requirements to ensure water quality and erosion control. Primary points of contact for the project include District Manager Rod Dowse, Forester Dan Blessing, and Project Coordinator Renee Main.
Shasta Valley Resource Conservation District

POSTED

about 20 hours ago

DEADLINE

N/A
NAICS: 115310
New
SLED
Fall 2026 Herbicide Release
Solicitation # RFP-2025-0147
Tuolumne County is soliciting proposals under RFP-2025-0147 for qualified contractors to perform chemical herbicide release on approximately 973 acres within the Rim Fire burn scar in the Stanislaus National Forest. The project aims to support the growth of seedlings planted in 2025 and 2026 by reducing competing vegetation. All work must be completed by October 31, 2026, or upon the first significant rain event or senescence of deciduous vegetation. The project is managed by the County with program administration and project oversight provided by the subcontracted Yosemite River's Alliance. Eligible contractors must possess a California Agriculture Pest Control Operator License with Category E Forest, a Pest Control Business License, and registration as a Farm Labor Contractor with the US Department of Labor. Requirements include at least three years of experience in forested environments, a clean bankruptcy record for the past five years, and the ability to provide a foreman fluent in English. The award will be based on best value, weighted 40 percent on reasonable cost and 30 percent on qualifications and experience. Operational standards mandate strict adherence to the Rim Fire Restoration and Reforestation Record of Decisions, including specific herbicide mixing ratios, nozzle pressure of 15 psi, and the use of factory-sealed containers no larger than 2.5 gallons. Contractors are responsible for all spill clean-up costs and must follow comprehensive fire prevention and spill reporting procedures. Performance is monitored through BMP implementation checklists and periodic inspections by the County or Forest Service. Proposals are due by September 23, 2026, and must be submitted in PDF format.
County Administration Office

POSTED

1 day ago

DEADLINE

in 12 days
NAICS: 115310
New
Federal
National Forests and Grasslands of Texas Davy Crockett RD Timber Mark and Cruise
Solicitation # 12363N26Q4237
Solicitation 12363N26Q4237 is a request for quotations from the USDA Forest Service for timber marking and cruising services within the Davy Crockett Ranger District of the National Forests and Grasslands of Texas. The scope of work covers approximately 547 acres across Compartments 18, 108, 109, and 110, involving boundary tree marking, plot cruising, and the marking of leave and cut trees. The project requires the use of government-provided tablets for mapping via the Two Trails program and adherence to FSH 2409 timber cruising standards. The performance period is scheduled from October 19, 2026, to December 18, 2026, with the place of performance centered in the Davy Crockett Ranger District and the district office located in Ratcliff, Texas. This acquisition is a total small business set-aside under NAICS code 115310, with a size standard of 11 million dollars. The government will award a firm-fixed-price contract based on best value, where non-price factors—specifically past performance and experience/qualifications—are deemed more important than price. Key evaluation criteria include the ability to distinguish timber types, basal area determination, and map interpretation. Offers are due by September 24, 2026, at 11:00 AM Central Time. Payment will be processed via Electronic Funds Transfer through the System for Award Management, contingent upon acceptable inspections and the submission of a standardized daily paint accountability log.
Stewardship Contracting Branch Usda-Fs

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 115310
New
Federal
F--Invasive plant management, Occoquan Bay NWR, VA
Solicitation # 140FS326Q0172
The U.S. Fish and Wildlife Service is requesting quotes for invasive plant management services at the Occoquan Bay National Wildlife Refuge in Woodbridge, Virginia. This 100 percent small business set-aside is conducted under FAR Parts 12 and 13 with a NAICS code of 115310. The project involves the herbicide treatment of approximately 10 acres, including two acres of Tree-of-Heaven colonies, a four-acre test area, and four acres of scattered invasive plants. The contractor must provide pesticide applicators certified in the state of Virginia and utilize specific methods such as hack-and-squirt for larger trees and foliar spray for smaller colonies. The performance period is scheduled from June 1, 2027, through October 31, 2027. Award will be based on the best value, with technical capability and past performance weighted more heavily than price. Offerors must submit a firm fixed price quote, a technical narrative, and a past performance questionnaire. Key personnel must demonstrate at least five years of relevant experience. Required deliverables include weekly status reports, a final document detailing treated acreage and herbicide efficacy, and GIS shapefiles of the treated areas. All contractors must maintain active registration in the System for Award Management and utilize the Invoice Processing Platform for payments. Quotes must be submitted to the Contract Specialist by September 14, 2026, at 2:00pm EDT.
Fws Sat Team 3

POSTED

1 day ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract seeks vegetation management services through disking operations to establish fuel breaks along existing roadways in south central Elmore County, Idaho, covering 188 acres for fiscal year 2026. The work requires linear disking on both sides of a 200-foot fuel break to achieve bare mineral soil with complete vegetation removal, using disk depths of at least six to eight inches. All range improvements, including fences and gates, must be restored to their original condition, and contractors must comply with OSHA safety standards and CFR1920-1000-1002 requirements for rollover protection. Equipment must be fitted with U.S. Forest Service-approved spark arresters, one shovel, and a 10-pound ABC fire extinguisher per tractor, and operations are subject to immediate stop-work orders under Red Flag Warnings or high fire danger conditions without penalty to the contractor’s schedule. The acquisition is a firm-fixed-price purchase order issued under FAR Part 12 as a total small business set-aside, with a NAICS code of 115310 and a size standard of $34.0 million, requiring all offerors to be actively registered in SAM. The period of performance runs from September 1 to September 30, 2026, with payment based on the number of acres satisfactorily completed at a specified unit price per acre, invoiced electronically through the Treasury’s IPP system, and supported by a contractor invoice attachment. Offerors must submit bids by June 15, 2026, at 9:00 a.m. MDT, and are required to complete specific sections of the solicitation form, sign and return one copy, and provide a detailed schedule demonstrating timely completion of the statement of work. A mandatory site visit is scheduled for June 2, 2026, and questions must be submitted by June 8, with responses posted by June 10. Evaluation will focus on technical capability to meet specifications and total price, with award going to the quotation deemed most advantageous to the government, potentially the lowest-priced offer if it provides best value. Final acceptance requires at least 95% compliance with specifications, verified through periodic inspections by the Contracting Officer’s Representative and/or Principal Investigator, with the contractor’s crew representative required to be present during all reviews. A minimum of one spot check per mile will be conducted via tape measure from the roadside for final inspection. Contractors must adhere to environmental

General Info

FY26 Paradigm Disking contract: small businesses manage 188 acres fuel breaks in Idaho, Sept 2026.

Agency

Department Of The Interior → National Interagency Fire CenterView Agency

Contract Value

$16,421.8

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

ID

Set-Aside

SBA

Awardee

WARDEN HAWKINSView Profile

Award Issued Date

Documents

(5)

RFQ 140L3726Q0047 FY26 Paradigm Disking Boise District

PDFrfq

Amendment 0002 to Solicitation 140L3726Q0047

PDFamendment

Map - Paradigm Disking

PDFother

Amendment 0001 to Solicitation 140L3726Q0047

PDFamendment

Solicitation 14013726Q0047 FY26 Paradigm Disking Idaho RFQ

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Interagency Fire Center
Contacts1 person available
OfficeBOISE, ID, 83705, USA
Organization / Agency
Department Of The Interior → National Interagency Fire Center
View Agency Profile
Office AddressBOISE, ID, 83705, USA

Full Description

Show more
FY26 PARADIGM DISKING

Vegetation management services to create fuel breaks along existing road systems.

More opportunities from Department Of The Interior → National Interagency Fire Center

Same awarding agency

NAICS: 238990
Federal
Y--ADOBE FIRE FENCE REPAIR
Solicitation # 140L3726Q0162
The National Interagency Fire Center, under the Department of the Interior, is soliciting a firm fixed price contract for the reconstruction of approximately 4.5 miles of 4-wire fence in Elko County, Nevada. This project is necessary to protect emergency stabilization and rehabilitation treatments and manage grazing following the 2026 Adobe Fire. The scope of work includes the removal and replacement of 23,776 feet of fencing, installation of steel pipe posts, and the use of specific materials such as SCH40 pipe and bar stock for brace rail attachments. The contractor is responsible for providing all labor, equipment, and materials, including the proper disposal of removed materials at approved landfills or recycling centers. The contract has a period of performance of 220 days from the notice to proceed. Award will be based on the lowest price among responsible quoters who meet all technical and regulatory requirements. Key compliance mandates include adherence to the Davis-Bacon Act for prevailing wages, the Buy American Act for domestic construction materials, and the submission of performance bonds totaling 100 percent of the original contract price. Contractors must provide weekly progress reports and coordinate regularly with the Bureau of Land Management for field inspections. Proposals are due by September 14, 2026, and must be submitted electronically to the contracting officer.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS