Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

General Waste Discharge Requirements for Domestic Wastewater Treatment Systems with Flows Greater Than 0.1 Million Gallons Per Day

Forecast
LDGO_CEQA_20210820-NOE_FlatState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract sets forth waste discharge requirements for domestic wastewater treatment plants in California’s Central Valley, Region 5, that handle daily flows exceeding 100,000 gallons and discharge treated effluent onto land. The requirements are designed to ensure environmental protection and compliance with water quality standards, targeting larger facilities that pose greater potential risks due to their scale of operation. The regulation applies specifically to land-based discharges and imposes obligations related to monitoring, reporting, and operational practices to mitigate contamination of soil and groundwater resources. The order is issued by the Regional Water Quality Control Board, Region 5 – Fresno, under the authority of the State of California, and is forecasted to be published on June 19, 2026. Primary contact for inquiries is Alexander Mushegan, Supervising Water Resource Control Engineer, reachable via email or phone. The directive has no solicitation number, is not associated with a set-aside classification or NAICS code, and is not tied to a procurement or bidding process, as it functions as a regulatory requirement rather than a contract for goods or services. The official information and related documentation can be accessed through the provided web link to the CEQA Net project database.

General Info

Regulates land-based wastewater discharge from large Central Valley treatment plants to protect water and soil quality.

Agency

California → Regional Water Quality Control Board, Region 5 - Fresno

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Fresno
Office AddressN/A
Contacts
Alexander MusheganSupervising Water Resource Control Engineer

Full Description

Show more
This Order establishes waste discharge requirements for domestic wastewater treatment plants designed to treat wastewater flows greater than 100,000 gallons per day that discharge treated wastewater to land within the Central Valley (Region 5).

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS