Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Guadalupe River Bank Stabilization Project: Malone Road and Blossom Hill Road

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Santa Clara Valley Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Malone Road and Blossom Hill Road, San Jose, CA, 95123

Set-Aside

NONE

Documents

(7)

Santa Clara Valley Water District Guadalupe River Bank Stabilization Project Draft MND June 2025

PDFmitigated-negative-declaration

SCH Summary Form for Guadalupe River Bank Stabilization Project

PDFenvironmental-summary

Caltrans Comment Letter on Guadalupe River Bank Stabilization Project MND

PDFcomment

Notice of Intent to Adopt Mitigated Negative Declaration for Guadalupe River Bank Stabilization Project

PDFspecial-notice

RWQCB Comments on Draft MND for Guadalupe River Bank Stabilization Project

PDFcomment

CDFW Comment on California Avenue Two-Lot Subdivision IS/MND

PDFcomment

Notice of Completion for Guadalupe River Bank Stabilization Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Water District
Office AddressN/A
Contacts
Lawrence TruongAssociate Environmental Planner
Keri HillSenior Project Manager

Interested Companies (1)

Show more
Consulting Firm
Lancaster, CA

Full Description

Show more
The Guadalupe River Bank Stabilization Project: Malone Road and Blossom Hill Road is intended to provide bank stabilization at two locations along the Guadalupe River upstream of Malone Road and Almaden Road and at Blossom Hill Road between Sanchez Drive and Blossom River Drive. Along these sections of the Guadalupe River, in-stream structures have significant erosion, and restoration of those embankments are needed to avoid risk of impacting neighboring properties. Project activities at the Guadalupe River and Malone Road Project site include tree removal, creating an active water bypass system throughout the length of the Project site, and installation of a concrete slope paving with compacted earth backfill utilizing concrete slope protection and footing with embedded rock riprap in the eroded cavity and along the concrete footing. Project activities at Guadalupe River and Blossom Hill Road Project site would include installation of an active dewatering system, debris removal, and replacing the failed gabion basket structure through the rock slope protection method. Construction activities are anticipated to occur between summer 2026 to fall 2026.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details