Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on November 27, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H--Three Year Electrical Inspection and Service

Awarded
36C25518Q9798Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation (MTC) is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off (PTO) system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The project is complete once the Facility Maintenance Department verifies proper clutch engagement and PTO operation under load. This is a small business set-aside opportunity under NAICS code 811310, open to various SBA-certified categories including VOSB, SDVOSB, WOSB, and HUBZone businesses. Proposals must be submitted via email to Angie Mahoney by November 3, 2026, and must include a lump sum bid sheet, a completed supplier packet with a W-9 and self-certification form, and proof of insurance. Award will be based on best value, considering the contractor's qualifications, experience, and the itemized cost breakdown. The contract is subject to Federal Acquisition Regulation (FAR) clauses regarding the Buy American Act, combating trafficking in persons, and Service Contract Labor Standards per Wage Determination No. 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
**Certified SB/DVBE Only** IFPQ Boiler Inspection, Maintenance, Repair, Testing, and Reporting in Los Angeles County
Solicitation # 07A6539
The California Department of Transportation (Caltrans) is soliciting price quotes for an Invitation for Price Quote (IFPQ 07A6539) to provide comprehensive boiler inspection, maintenance, repair, testing, and reporting services at the District 7 Office facility in Los Angeles, California. The scope of work includes annual and quarterly preventative maintenance for three Unilux water tube boilers and six boiler pumps, ensuring compliance with manufacturer standards, ASME Code, OSHA requirements, and South Coast Air Quality Management District standards. This is a set-aside solicitation exclusively for certified Small Business (SB), Microbusiness (MB), or Disabled Veteran Business Enterprise (DVBE) entities. The contract will be awarded to the responsible bidder offering the lowest price quote who meets all specifications. Key operational requirements include a 48-hour response time for routine service requests and a strict prohibition on subcontracting any portion of the work. The contractor must adhere to State General Prevailing Wage Rates for Los Angeles County and provide a payment bond for any service request exceeding 25,000 dollars. Required submission documents include a Price Quote Proposal, Bidder Certification Sheet, Non-Collusion Declaration, and certifications for California Civil Rights Laws and the Darfur Contracting Act. Invoicing is conducted monthly in arrears and must be accompanied by certified payroll records and DVBE utilization reports. The agreement is subject to a budget contingency clause, meaning it is enforceable only if sufficient funds are provided by the California State Legislature or the United States Government.
California Department of Transportation

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 14 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This contract establishes a three-year agreement for the professional testing and maintenance of electrical power distribution systems. The scope of work includes the comprehensive inspection, servicing, and reconditioning of medium and low voltage switchgear, circuit breakers, protective relays, primary disconnects, transformers, generators, cables, and busways. All activities must be performed under the supervision of a Registered Professional Engineer and executed by Field Service Engineers certified by NICET, NETA, or an equivalent body. To minimize operational impact, all power outages must be approved in writing two weeks in advance and are restricted to nights and weekends. The contractor is required to adhere to strict technical standards, including NEMA, NETA, ANSI, ASTM, ASA, and VA guidelines. Key deliverables include detailed documentation of all work and comprehensive test reports covering equipment descriptions and results. Furthermore, the contractor must maintain a rigorous calibration program for all test instruments, ensuring traceability to the National Institute of Standards and Technology. Specific technical requirements include insulation resistance testing, contact resistance measurements, and the verification of time-current characteristics for protective devices.

General Info

Contract Value

$54,000

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

KS, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
ContactsNo contacts available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA
ContactsNo contact information available

Full Description

Show more
DRAFT STATEMENT OF WORK PROFESSIONAL TESTING AND MAINTENANCE OF ELECTRICAL SYSTEMS AND EQUIPMENT 1. GENERAL: 1.1 The work under this contract shall be performed under supervision of a Registered Professional Engineer. The Registered Professional Engineer shall be on site initially to discuss with the Engineering Officer the procedures used to test, survey, report and service the equipment required to be serviced under this contract. The Registered Professional Engineer shall supervise the services personally, review the final report and discuss with the Engineering Officer the results of the services, any recommendations, future actions and professional opinions, which are contained in the report. 1.2 Field service work shall be performed directly by Field Service Engineers who have successfully demonstrated their knowledge and experience in the Field of Electrical Power Distribution Systems Testing. The Field Service Engineer shall be capable of the following: (1) testing, assessing, evaluating, servicing and reconditioning components, (2) assuring that the equipment on which work has been performed is safe, reliable and acceptable for its intended purpose, and (3) identifying defective equipment and potential safety problems, environmental hazards or code violations. 1.3 The Supervising Service Engineer must be accredited as a Certified Electrical Test Technologist by the NICET (National Institute for Certification of Engineering Technologists) or the NETA (National Electrical Testing Association) or similar certification and have a minimum of five (5) years of experience on similar major testing projects. 1.4 All other testing technicians assigned to the project must be certified by NICET, NETA, or must have an equivalent qualification certification. 1.5 Test assistants and apprentices may be assigned to the project as assistants to certified technicians at a ratio not to exceed two certified to one non-certified assistant or apprentice. 1.6 The names and certification numbers of the Registered Professional Engineer supervising the work and signing the test reports and the Supervising Field Service Engineer must be provided by the Contractor and verified by the Contracting Officer before contract award. After contract award, similar data for all certified technicians who will be assigned to work on the project must also be submitted and approved before starting work on the contract. 1.7 All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers' recommendations and applicable NEMA, NETA, ANSI, ASTM, ASA and VA Standards and as specified for each section in specifications. 1.8 All outages shall be scheduled and approved in writing at least two weeks in advance. Outages will be scheduled only at night and on weekends. 2. SCOPE 2.1 THREE YEAR ELECTRICAL SYSTEM MAINTENANCE AND TESTING. 2.2 Switchgear equipment. Medium Voltage Circuit Breakers and Protective Relays. 2.2.1 Record switchgear, breaker and device nameplate information and compare with the facility's one-line diagram, when available. Identify and record discrepancies. 2.2.2 Inspect all electrical equipment, including each breaker, and report damage or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate. 2.2.3 Check equipment for level, security to foundation and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate. 2.2.4 Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies. 2.2.5 Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies, and clean where appropriate. 2.2.6 Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect and adjust all contacts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary. 2.2.7 Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies. 2.2.8 Remove each relay from its case. Clean, inspect and tighten all connections. Apply three multiples of relay tap current to each relay to verify manufacturer's time current characteristics. Test each relay for instantaneous pickup. Report deficiencies and adjust where appropriate. 2.3 Primary Disconnects. 2.3.1 De-energize entire substation clean all insulating surface and clean and dress all contacts. 2.3.2 Activate each switch. Insure switch completely disengages and closes clean switch and lubricate as required. 2.3.3 Measure contact resistance in micro-ohms, Megger each phase-to-ground. Record any discrepancies. 2.3.4 Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary. 2.4 Transformers 2.4.1 Record transformer nameplate information and compare with the facility's one-line diagram, when available. Record discrepancies. 2.4.2 Inspect transformer and accessories and report damage, loose connections or material, shipping blocks, or contamination that must be corrected. Clean where appropriate. Inspect for leaks and tighten all untaped connections. Clean all insulating surfaces. 2.5 Low Volta= Circuit Breakers 2.5.1 Record switchgear, breaker and device nameplate information and compare with the facility's one line diagram, when available. Record discrepancies 2.5.2 Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate. 2.5.3 Check equipment for level, security to foundation, and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate. 2.5.4 Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies. 2.5.5 Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate. 2.5.6 Clean and inspect each breaker. Megger phase-to-phase and phase-to-ground and measure contact resistance in micro-ohms. Test each series over-current trip device' for pickup at 200% and 300' of its rating and for instantaneous pickup. Clean and dress all contact surfaces and lubricate as necessary. 2 . 6 Generators 2.6.1 Record nameplate data including manufacturer, age and capacity. List fuel type, KM load under load condition, number of hours of fuel tank capacity and number of hours of accumulated run time. 3. TEST EQUIPMENT 3.1 Suitability of Test Equipment 3.1.1 All test equipment shall be in good mechanical and electrical condition. 3.1.2 Split-core current transformers and clamp-on or tong type ammeters require careful consideration of the following in regard to accuracy: 3.1.2.1 Position of the conductor within the core. 3.1.2.2 Clean, tight fit of the core pole faces. 3.1.2.3 Presence of external fields. 3.1.2.4 Accuracy of the current transformer ratio in addition to the accuracy of the secondary meter. 3.1.3 Selection of metering equipment should be based on a knowledge of the waveform of the variable being measured. Modern digital multimeters may be average or rms. sensing and may include or exclude the do component. When the variable contains harmonics or do offset and in general, any deviation from a pure sine wave, average sensing, rms. scaled meters may be misleading. 3.1.4 Field test metering used to check power system meter calibration must have an accuracy higher than that of the instrument being checked. 3.1.5 Accuracy of metering in test equipment shall be appropriate for the test being performed but not in excess of 2% of the scale used. 3.1.6 Waveshape and frequency of test equipment output waveforms shall be appropriate for the test and tested equipment. 3.2 Test Instrument Calibration 3.2.1 The testing firm shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy. 3.2.2 The accuracy shall be directly traceable to the National Institute of Standards and Technology. 3.2.3 Instruments shall be calibrated in accordance with the following frequency schedule: 3.2.3.1 Field instruments: Analog-6 months maximum: Digital-12 months maximum. 3.2.3.2 Laboratory instruments: 12 months. 3.2.3.3 Leased specialty equipment: 12 months (Where accuracy is guaranteed by lessor). 3.2.4 Dated calibration labels shall be visible on all test equipment. - 3.2.5 Records, which show date and results of instruments calibrated or tested, must be kept up-to-date. 3.2.6 Up-to-date instrument calibration instructions and procedures shall be maintained for each test instrument. 3.2.7 Calibrating standard shall be of higher accuracy than that of the instrument tested. 3.3 Test Resort 3.3.1 The test report shall include the following: 3.3.1.1 Summary of project. 3.3.1.2 Description of equipment tested. 3.3.1.3 Description of test. 3.3.1.4 Test results. 3.3.2 Furnish a copy or copies of the complete report to the owner/user's representative as directed in the maintenance contract. 4. INSPECTION AND TEST PROCEDURES 4.1 Switchgear and Switchboard Assemblies 4.1.1 Visual and Mechanical Inspection 4.1.1.1 Inspect for physical, electrical and mechanical condition. 4.1.1.2 Compare equipment nameplate information with latest one line diagram when available and report discrepancies. 4.1.1.3 Check for proper anchorage, required area clearances, physical damage, and proper alignment. 4.1.1.4 Inspect all bus connections for high resistance. Use low resistance ohmmeter, or check tightness of bolted bus joints by calibrated torque wrench method. In lieu of above tonguing, perform infrared survey in accordance with Section 9. 4.1.1.5 Test all electrical and mechanical interlock systems for proper operation and sequencing. 4.1.1.5.1 Closure attempt shall be made on locked open devices. Opening attempt shall be made on locked closed devices. 4.1.1.5.2 Key exchange shall be made with devices operated in off-normal positions. 4.1.1.6 Clean switchgear. 4.1.1.7 Inspect accessible insulators for evidence of physical damage or contaminated surfaces. 4.1.1.8 Verify proper barrier and shutter installation and operation. 4.1.1.9 Lubrication. 4.1.1.9.1 Verify appropriate contact lubricant on moving current carrying parts. 4.1.1.9.2 Verify appropriate lubrication on moving and sliding surfaces. 4.1.1.10 Exercise all active components. 4.1.1.11 Inspect all mechanical indicating devices for proper operation. 4.1.2 Electrical Tests 4.1.2.1 Perform ground resistance tests in accordance with Section 4.8. 4.1.2.2 Perform insulation resistance tests on each bus section, phase-to-phase and phase-to-ground for one (1) minute. Test voltages shall be in accordance with Table 4.1.1. 4.1.2.3 Perform control wiring performance test. Use the elementary diagrams of the switchgear to identify each remote control and protective device. Conduct tests to verify satisfactory performance of each control feature. 4.1.2.4 Perform overpotential tests on each bus section, phase-to-phase and phase-to-ground. Test voltages shall be in accordance with Table 4.1.2. 4.1.2.5 Control Power Transformer - Dry Type 4.1.2.5.1 Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition. 4.1.2.5.2 Verify that primary and secondary fuse ratings or circuit breakers match drawings. 4.1.2.5.3 Perform insulation resistance test. Measurements shall be made from winding-to-winding and windings-to-ground. Test voltages and minimum resistances shall be in accordance with Table 4.2.1. Results to be temperature corrected in accordance with Table 4.2.2. 4.1.3 Test values 4.1.3.1 Bolt torque levels shall be in accordance with Table 8.1, unless otherwise specified by manufacturer. 4.1.3.2 Insulation resistance test shall be performed in accordance with Table 4.1.1. Values of insulation resistance less than his table or manufacturer's minimum should be investigated. 4.1.3.3 Overpotential test voltages shall be applied in accordance with Table 4.1.2-(Derived from ANSI/IEEE C37.20.2). Test results are evaluated on a go, no-go basis by slowly raising the test voltage to the required value. The final test voltage shall be applied for one (1) minutes. TABLE 4.1.1 Switchgear Insulation Resistance Test Voltage Voltage Rating Minimum dc Test Voltage Recommended Minimum Insulation Resistance In Megohms 0-250V 500V 50 251-600V 1000V 100 601-5000V 2500V 1000 5001-15000V 2500V 5000 15001-25000V 5000V 20000 TABLE 4.1.2 Field Overpotential Test Voltages* Maximum Type of Switchgear Rated TV Test Voltage kV ac de MC 4.76 14.3 20.3 (Metal Clad 8.25 27.0 37.5 Switchgear) 15.0 27.0 37.5 38.0 60.0 SC 15.5 37.5 + (Station-type Cubicle 38.0 60.0 + Switchgear) 72.5 120.0 + MEI 4.76 14.3 20.3 (Metal-Enclosed 8.25 19.5 27.8 Interrupter 15.0 27.0 37.5 Switchgear) 15.5 37.5 52.5 25.8 45.0 38.0 60.0 +Consult Manufacturer Derived from ANSI/IEEE 037.20.2, Paragraph 5.5 and C37.20.3, paragraph 5.5 4.2 Transformers 4.2.1 Transformers-Dry Type 4.2.1.1 Visual and Mechanical Inspection 4.2.1.1.1 Inspect for physical damage, cracked insulators, lightness of connections, defective wiring and general mechanical and electrical conditions. 4.2.1.1.2 Verify proper auxiliary device operation such as fans and indicators. 4.2.1.1.3 Check tightness of accessible bolted electrical joints in accordance with Table 7.1. 4.2.1.1.4 Perform specific inspections and mechanical tests as recommended by manufacturer. 4.2.1.1.5 Make a close examination for shipping brackets or fixtures that may not have been removed during original installation. Ensure resilient mounts are free. 4.2.1.1.6 Verify proper core grounding. 4.2.1.1.7 Verify proper equipment grounding. 4.2.1.1.8 Thoroughly clean unit prior to testing unless "as found" and "as left" tests are required. 4.2.1.2 Electrical Tests 4.2.1.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing a megohmmeter with test voltage output as shown in Table 4.2.3. 4.2.2.1 Visual and Mechanical Inspection. 4.2.1.2.1.1 Test duration shall be for 10 minutes with resistances tabulated at 30 seconds, 1 minute, and 10 minutes. Dielectric absorption ratio and polarization index will be calculated. 4.2.1.2.1.2 Perform tests and adjustments for fans, controls, and alarm functions. 4.2.1.2.1.3 Verify that tap-changer is set at specified ratio. 4.2.1.2.1.4 Verify proper secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading. 4.2.1.3 Test Values 4.2.1.3.1 Insulation resistance test values should not be less than values recommended in Table 4.2.3 Results shall be temperature corrected in accordance with Table 4.2.4. 4.2.1.3.2 The polarization index should be above 1.2 unless an extremely high value is obtained initially, which when doubled will not yield a meaningful value. 4.2.1.3.3 Turns ratio test results should not deviate more than one-half of the percent (0.5%) from either the adjacent coils or the calculated ratio. 4.2.1.3.4 CH and-CL power factor values will vary due to support insulators and bus work utilized on dry transformers. The following should be expected on CHL power factors. Power Transformers: 3% or less Distribution Transformers: 5% or less 4.2.1.3.5 Winding resistance test results should compare within one percent (1%) of adjacent windings. 4.2.1.3.6 Excitation current test data pattern: Two similar current readings for outside coils and a dissimilar current reading for the center coil of a three phase unit. 4.2.2 Transformers - Liquid Filled 4.2.2.1 Visual and Mechanical Inspection 4.2.2.1.1 Inspect for physical damage, cracked insulators, leaks, tightness of connections, and general mechanical and electrical conditions. 4.2.2.1.2 Verify proper auxiliary device operation. 4.2.2.1.3 Check tightness of accessible bolted electrical connections in accordance with Table 7.1. 4.2.2.1.4 Verify proper liquid level in all tanks and bushings. 4.2.2.1.5 Perform specific inspections and mechanical tests as recommended by manufacturer. 4.2.2.1.6 Verify proper equipment grounding. 4.2.2.2 Electrical Tests 4.2.2.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing a megohmmeter with test voltage output as shown in Table 4.2.3. 4.2.2.2.1.1 Test duration shall be for 10 minutes with resistance's tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. 4.2.2.2.2 Perform a turns ratio test between windings at designated tap position. The tap setting is to be determined by the owner/user's electrical engineer and set by the testing laboratory. 4.2.2.2.3 Perform insulation power factor tests or dissipation factor tests on all windings and bushings. Overall dielectric-loss and power factor (CHI, CL, TEL) shall be determined. Test voltages should be limited to the line to ground voltage rating of the transformer winding. 4.2.3 Test Values 4.2.3.1 Insulation resistance and absorption test. Test voltages to be in accordance with Table 4.2.3. Resistance values to be temperature corrected in accordance with Table 4.2.4. 4.2.3.2 The polarization index should be above 1.2 unless an extremely high value is obtained initially, which when doubled will not yield a meaningful value. 4.2.3.3 Tummy ratio test results shall not deviate more than one half percent (0.5%) from either the adjacent coils or the calculated ratio. 4.2.3.4 Maximum power factor of liquid filled transformers corrected to 20 degrees C shall be in accordance with Table 4.2.1. TABLE 4.2.1 Oil silicone Tetrachlor High Fire ethylene Point Hydro carbon Power Transformers 0.5% 0.5% 3.0% 0.5% Distribution Transformers 1.0% 0.5% 3.0% 1.0% 4.2.3.5 Bushing power factors and capacitances that vary from nameplate values by more than ten percent (10%) should be investigated. 4.2.3.6 Excitation current test data pattern: Two similar current readings for outside coils and a dissimilar current reading for the center coil of a three phase unit. 4.2.3.7 Dielectric fluid should comply with Table 4.2.2. 4.2.3.8 Winding resistance test results should compare within one percent (1%) of adjacent windings. TABLE 4.12 High Molecular Tetrchlor Oil Weight Silicone ethylene Hydrocarbon Dielectric Breakdown 24 kV 30 kV 30 kV 30 kV ASTM D-877 Minimum Minimum Minimum Minimum Dielectric Breakdown ASTM D-1816 @0.04" gap 34.5 kV and below 20 kV 26 kV Minimum Minimum above 34.5 kV 25 kV Neutralization 0.36 mgKOH/g 0.03 mgKOH/g .01 mgKOH/g .25 mgKOH/g #ASTM D-974 Maximum Maximum Maximum Maximum Interfacial 21 dynes/cm 33 dynes/cm Tension ASTM D-974 Minimum Minimum or D-2285 Color 3.0 3.0 N/A 0.05 ASTM Maximum Maximum D-1500 (D-2129) Visual Condition Compare to N/A Crystal Clear, Slight ASTM Previous Clear Pink Irre D-1524 Tests descent Power Factor 1.0% 0.1% 0.1% 2% ASTM D-924 Maximum Maximum Maximum Maximum Q25 degrees Water Con tent ASTM D-1533 35 PPM* 35 PPM 80 PPM25 PPM 15 kV & Maximum Maximum Maximum Maximum below above 15 kV-below 25 PPM* 115 kV Maximum 115 kV- 20 PPM* 230 kV Maximum above 15 PPM 230 kV Maximum *Or in accordance with manufacturer's requirements. Some manufacturer's recommend 15 PAM maximum for all transformers. Note: The values for oil are taken from ANSI C57.106 (IEEE Std. 64). The remaining values are acceptance test values and should be modified for service aged fluid as recommended by the manufacturer. 4.2.4 Small Transformers - Dry Type, Air Cooled (600 Volt and Below) (less than 100 kVA single-phase or 300 kVA three phase). 4.2.4.1 Inspect for physical damage, broken insulation, tightness of connections, defective wiring, and general condition. 4.2.4.2 Thoroughly clean unit prior to making any tests. 4.2.4.3 Perform insulation resistance test. Calculate dielectric absorption ratio and polarization index. Measurements shall be made from winding-to-winding and windings-to-ground. Test voltages and minimum resistance shall be in accordance with Table 4.2.3. Results to be temperature corrected in accordance with Table 4.2.4. TABLE 4.2.3 Transformer Insulation Resistance Test Voltage Recommended Minimum Minimum Insulation Transformer Coil de Resistance in Megohms Rating Type Test Voltage Liquid Filled Dry 0 - 600 Volts 1000 Volts 100 500 601 - 5000 Volts 2500 Volts 1000 5000 5001 - 15000 Volts 5000 Volts 5000 25000 TABLE 4.2.4 C Transformer Insulation Resistance Temperature Correction Factors to 20 degrees C TEMPERATURE F OIL TRANSFORMER DRY 0 32 .25 .40 5 41 .36 .45 10 50 .50 .50 15 59 .75 .75 20 68 1.00 1.00 25 77 1.40 1.30 30 86 1.98 1.60 35 95 2.80 2.05 40 104 3.95 2.50 45 113 5.60 3.25 50 122 7.85 4.00 55 131 11.20 5.20 60 140 15.85 6.40 65 149 22.40 8.70 70 158 31.75 10.00 75 167 44.70 13.00 80 176 63.50 16.00 4.3 Cables 4.3.1 Cables - Low Voltage - 600V Maximum 4.3.1.1 Visual and Mechanical Inspection 4.3.1.1.1 Inspect exposed sections of cables for physical damage. 4.3.1.1.2 Test cable mechanical connections to manufacturer's recommended values with a calibrated torque wrench. In lieu of above torquing, perform infrared survey in accordance with Section 6. 4.3.1.2 Electrical Tests 4.3.1.2.1 Perform insulation resistance test on each conductor with respect to ground and adjacent conductors. Applied potential to be 1000 volts do for 1 minute. 4.3.1.3 Test Values 4.3.1.3.1 Minimum insulation resistance values shall be not less than two megohms. 4.3.2 Cables - Medium Voltage - 69 kV Maximum 4.3.2.1 Visual and Mechanical Inspection 4.3.2.1.1 Inspect exposed sections for physical damage. 4.3.2.1.2 Inspect for shield grounding, cable support and termination. 4.3.2.1.3 Inspect fireproofing in common cable areas. 4.3.2.1.4 If cables are terminated through window type CT's, make an inspection to verify that neutrals and grounds are properly terminated for proper operation of protective devices. 4.3.2.2 Electrical Tests 4.3.2.2.1 Perform a shield continuity test on each power cable. Ohmic value hall be recorded. 4.3.2.2.2 Perform a do high potential test on all cables. Adhere to all precautions and limits as specified in the applicable NEMA/ICEA Standard for the specific cable. Perform tests in accordance with ANSI/IEEE Std. 400. Test procedure shall be as follows, and the results for each cable test shall be recorded as specified herein. Test voltages shall not exceed 60% of cable manufacturer's factory test value or the maximum test voltage in table 4.3.1. 4.3.2.2.2.1 Current sensing circuits in test equipment shall measure only the leakage current associated with the cable under test and shall not include internal leakage of the test equipment. 4.3.2.2.2.2 Record wet and dry bulb temperatures of relative humidify end temperature. 4.3.2.2.2.3 Test each section of cable individually. 4.3.2.2.2.4 Individually test each conductor with all other conductors grounded. Ground all shields. 4.3.2.2.2.5 Terminations shall be, property corona suppressed by guard ring, field reduction sphere, or other suitable methods. 4.3.2.2.2.6 Ensure that the maximum test voltage does not exceed the limits for terminators specified in IEEE Standard 48 or manufacturer's specifications. 4.3.2.2.2.7 Apply a do high potential test in at least five equal increment shall exceed the voltage rating of the cable. Record do leakage current at each step after a constant stabilization time consistent with system changing current. 4.3.2.2.2.8 Raise the conductor to the Specified maximum test voltage and hold for a minimum of five minutes. Record readings of leakage current at 30 seconds and one minute and at one minute intervals thereafter. 4.3.2.2.2.9 Reduce the conductor test potential to zero and measure residual voltage at discrete intervals. 4.3.2.2.2.10 Apply grounds for a time period adequate to drain all insulation stored charge. Proper notification must be made to all concerned parties if grounds are left in place. TABLE 4.3.1 Maximum Maintenance Test Voltages (kV,dc) 1968 and Later Cable Rated Insulation Cable Test Voltage Insulation Type Level Voltage kV.dc Elastomeric: Butyl and 100% 5kV 19 Oil Base 100% 15kV 41 100% 25kV 60 133% 5kV 19 133% 15kV 49 Elastomeric: EPR 100% kV 19 100% 5kV 41 100% 25kV 60 100% 35kV 75 133% 5kV 19 133% 15kV 49 133% 25kV 75 Polyethylene 100% 5kV 19 100% 15kV 41 100% 25kV 60 100% 35kV 75 133% 5kV 19 133% 15kV 49 133% 25kV 75 Derived from ANSI/IEEE std. 141-1986 Table 82 Note: Selection of test voltage for in-service cables depends on many factors. The owner should be consulted and/or informed of the intended test voltage prior to performing the test. The above tables are consistent with ILEA recommendations. AE1C C55 and C56, and ANSI/WEE Std. 400 specify higher voltages. It the cable fails during the test it will require repair or replacement prior to re-energizing. 4.3.2.3 Test Values 4.3.2.3.1 Shielding must exhibit continuity. Investigate resistance values in excess of 10 ohms per 1000 feet of cable. *4.3.2.3.2 A graphic plot may be made with leakage current (X axis) versus voltage (Y axis) at each increment. 4.3.2.3.2.1 The step voltage slope should be reasonably linear. 4.3.2.3.2.2 Absorption slope should be flat or negative. In no case should slope exhibit a positive characteristic. 4.3.2.3.2.3 compare test results to previously obtained results. 4.4 Metal Enclosed Busways 4.4.1 Visual and Mechanical Inspection 4.4.1.1 Inspect bus for physical damage. 4.4.1.2 Inspect for proper bracing, suspension alignment, and enclosure ground. 4.4.1.3 Check tightness of bolted joints by calibrated torque wrench method in accordance with manufacturer's published data or Table 7.1 In lieu of above torquing perform infrared survey in accordance with Section 6. 4.4.1.4 Check outdoor busway for removal of "weephole" plugs, if applicable, and the proper installation of joint shield. 4.4.2 Electrical Tests 4.4.2.1 Measure insulation resistance of each bus run phase-to-ground for one (1) minute. 4.4.3 Test Values 4.4.3.1 Bus bolt torque values shall be in accordance with manufacturer's recommendations or Table 8.1. 4.4.3.2 Insulation resistance test voltages and resistance values shall be in accordance with manufacturer's specifications or Table 7.2. 4.5 Air Switches - Medium Voltage - Metal Enclosed 4.5.1 Visual and Mechanical Inspection 4.5.1.1 Inspect for physical and mechanical condition. 4.5.1.2 Check for proper anchorage and required area clearances. 4.5.1.3 Verify that fuse sizes and types correspond to drawings. 4.5.1.4 Perform mechanical operator tests in accordance with manufacturer's instructions. 4.5.1.5 Check blade alignment and arc interrupter operation. 4.5.1.6 Verify that expulsion limiting devices are in place on all holders having expulsion type elements. 4.5.1.7 Check each fuse holder for adequate mechanical support for each fuse. 4.5.1.8 Inspect all bus connections for tightness of bolted bus joints by calibrated torque wrench method. Refer to manufacturer's instructions or Table 8.1 for proper torque levels. In lieu of above torque tests, perform infrared survey in accordance with Section 6. 4.5.1.9 Test all electrical and mechanical interlock systems for proper operation and sequencing. 4.5.1.10 Clean entire switch using approved methods and materials. 4.5.1.11 Verify proper phase barrier materials and installation. 4.5.1.12 Lubricate as required. 4.5.1.13 Check switch blade clearances with manufacturer's published data. 4.5.1.14 Inspect all indicating devices for proper operation. 4.5.2 Electrical Tests 4.5.2.1 Perform insulation resistance tests on each pole, phase-to-phase and phase-to-ground for one (1) minute. Test voltage and minimum resistances should be in accordance with Table 8.2. In lieu of this test, perform appropriate insulation tests in conjunction with medium voltage cable insulation tests and/or power transformer primary winding tests. 4.5.2.2 Perform contact resistance test across each switch blade and fuse holder. 4.5.3 Test Values 4.5.3.1 Bolt torque levels shall be in accordance with Table 8.1 unless otherwise specified by manufacturer. 4.5.3.2 Perform insulation resistance test in accordance with Table 4.1.1. Investigate values of insulation resistance less than this table or manufacturer's minimum. 4.5.3.3 Determine contact resistance in microhms. Investigate any value exceeding 100 microhms or any values which deviate from adjacent poles or similar switches by more than fifty percent (50%). 4.5.4 Air Switches-High and Medium Voltage-Open 4.5.4.1 Visual and Mechanical Inspection 4.5.4.1.1 Inspect for physical damage and compare nameplate data with plans and specifications. 4.5.4.1.2 Perform mechanical operator tests in accordance with manufacturer's instructions. 4.5.4.1.3 Check blade alignment and arc interrupter operation. 4.5.4.1.4 Check fuse link or element and holder for proper current rating. 4.5.4.2 Electrical Tests 4.5.4.2.1 Perform ac or do overpotential test on each pole-to-ground and pole-to-pole. 4.5.4.2.2 Perform contact resistance teat across each switch blade. 4.5.4.3 Test Values 4.5.4.3.1 Apply overpotential test voltages in accordance with Table 4.1.6. 4.5.4.3.2 Contact resistance shall be determined in microhms. Investigate any value exceeding 500 microhms or any values which deviate from adjacent poles or similar switches by more than fifty percent (50%). 4.6 Circuit Breakers 4.6.1 Circuit Breakers-Low Voltage 4.6.1.1 Circuit Breakers-Low Voltage-Insulated Case 4.6.1.1.1 Visual and Mechanical Inspection 4.6.1.1.1.1 Check circuit breaker for proper mounting. 4.6.1.1.1.2 Operate circuit breaker to ensure smooth operation. 4.6.1.1.1.3 Inspect case for cracks or other defects . 4.6.1.1.1.4 Check tightness of connections with calibrated torque wrench. Refer to manufacturer's instructions or Table 8.1 for proper torque levels. In lieu of this test, perform infrared survey in accordance with Section 6. 4.6.1.1.1.5 Check internals on unsealed units. 4.6.1.1.2 Electrical Tests 4.6.1.1.2.1 Perform a contact resistance test. 4.6.1.1.2.2 Perform an insulation resistance test at 1000 volts do from pole to-pole and from each pole-to ground with breaker closed and across open contacts of each phase. 4.6.1.1.2.3 Perform long time delay time current characteristic tests by passing three hundred percent (300%) rated current through each pole separately. Record trip time. Make external adjustments as required to meet time current curves. 4.6.1.1.2.4 Determine short time pickup and delay by primary current injection. 4.6.1.1.2.5 Determine ground fault pickup and time delay by primary current injection. 4.6.1.1.2.6 Determine instantaneous pickup current by primary injection using run-up or pulse method. 4.6.1.1.2.7 Perform adjustments for final settings in accordance with breaker setting sheet when applicable. 4.6.1.1.3 Test Values 4.6.1.1.3.1 Compare contact resistance or millivolt drop values to adjacent poles and similar breakers. Investigate deviations of more than fifty (50%). Investigate any value exceeding manufacturer's recommendations. 4.6.1.1.3.2 Insulation resistance shall not be less than 100 megohms. Investigate values less than 100 megohms. 4.6.1.1.3.3 Trip characteristic of breakers shall fall within manufacturer's published time-current characteristic tolerance band, including adjustment factors. 4.6.1.1.3.4 All trip times shall fall within Table 4.6.1.1. Circuit breaker" exceeding specified trip time at three hundred percent (300%) of...

More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

NAICS: 236220
New
Federal
Z2DA--657-27-103JB, FCA Replace Building 51 Roof, JB
Solicitation # 36C25527Q0044
The Department of Veterans Affairs, Network Contracting Office 15, is conducting market research through a Sources Sought Notice to determine the availability of qualified Service-Disabled Veteran-Owned Small Business (SDVOSB) firms for a construction project at the St. Louis Medical Center Jefferson Barracks. The project involves the replacement of the roof and associated components for Building 51, covering approximately 56,000 square feet. The scope includes installing a 70-mil thermoplastic polyolefin (TPO) roofing system, replacing four skylights, and updating the penthouse roof-access ladder to meet OSHA and VA safety standards. The estimated value of the resulting contract is between 2 million and 5 million dollars, with a required performance period of 222 calendar days from the Notice to Proceed. The project requires the contractor to manage work within an occupied 24/7 facility, necessitating a detailed phasing plan and strict adherence to infection control and HVAC-intake protection. Key technical requirements include providing a 20-year no-dollar-limit warranty, ensuring positive drainage to prevent standing water for more than 48 hours, and submitting as-built record drawings in searchable PDF and editable CAD formats. Interested firms must be registered in SAM.gov under NAICS code 236220 and provide a capability statement by November 9, 2026, including evidence of CVE certification, bonding capability, and a history of comparable work performed within the last five years.
Commercial and Institutional Building Construction

POSTED

about 19 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS