This Sources Sought opportunity from Department Of Veterans Affairs was posted on September 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005

Closed
36C25925Q0780Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541350
New
SLED
Campus Consulting – Inspector Of Record (IOR) Services
Solicitation # RFP2026-06AM
California State University, Chico is soliciting proposals under RFP2026-06AM for a non-exclusive Task Order Service Agreement to provide on-site Inspector of Record or Construction Inspector services for various campus projects. The selected service provider will be responsible for quality control and ensuring code compliance in accordance with the California Building Code. Qualified inspectors must hold certifications from ICBO/ICC, OSHPD, or DSA, or be a licensed architect or registered engineer in California. The contract features an initial term of two years with the option to renew for two additional two-year terms. Proposals are due by November 12, 2026, and must include a standard fee schedule, detailed experience and staffing information, project history regarding construction costs, and sample inspection documentation. Evaluation will emphasize experience with higher education institutions, specifically within the California State University system. Awarded providers must register with the Department of Industrial Relations and maintain comprehensive insurance coverage, including a 4 million dollar general aggregate and specific workers compensation limits. Payments will be processed monthly in arrears upon submission of invoices in the CSU format and written approval from the project administrator.
California State University, Chico

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 541350
New
SLED
Districtwide Construction Inspection Services
Solicitation # 2027-07
The Solana Beach School District is soliciting qualifications under RFQ 2027-07 to establish a master agreement for districtwide construction inspection services. The scope of work encompasses both general construction-related consultant services and specialized inspection and materials testing. The District intends to create pools of prequalified firms, short-listing up to five of the most qualified firms per specialty to be assigned work on an as-needed basis via written task orders. The initial term of the agreement is one year, with the possibility of four one-year extensions for a total maximum duration of five years. Selection is based on qualifications rather than the lowest price, utilizing a 100-point scoring scale that emphasizes the depth of the firm's experience and the qualifications of proposed professionals. Minimum requirements include at least ten years of experience with California public K-12 projects, current DIR registration, and specific DSA certifications for project inspectors or laboratory of record status for materials testing. Awarded firms must comply with California prevailing wage laws, non-discrimination policies, and the Drug-Free Workplace Act. Invoicing occurs monthly and requires detailed documentation of time spent and work accomplished. Responses are due by November 10, 2026, and must include four hard copies and one electronic PDF copy on a USB drive for each specialty applied for.
Solana Beach School District

POSTED

about 8 hours ago

DEADLINE

in 12 days
NAICS: 541350
New
SLED
Residential Energy Audit
Solicitation # NSD-RFQu-26-006
The City of Phoenix Neighborhood Services Department is soliciting offers for residential energy audit consulting services under solicitation NSD-RFQu-26-006. The resulting agreement will have a five-year term beginning December 1, 2026, or upon final recording by the City Clerk. The selected contractor will perform various technical assessments, including Manual J, Manual D, Manual S, Appliance, and CO2 audits. Deliverables include detailed electronic audit reports submitted via a secure portal, featuring property photographs and documentation of pre-existing and post-construction conditions. Performance timelines are strict, with standard audits required within two weeks of request and emergency audits scheduled within 24 hours and performed within three business days. Award decisions will be based on the most advantageous offer, with a heavy emphasis on the Statement of Qualification, which requires at least one year of relevant experience and detailed staffing and quality assurance narratives. Contractors must maintain valid professional licenses, adhere to City of Phoenix confidentiality and data protection standards, and ensure all personnel pass Police Department background checks. Compliance requirements include adhering to the Clean Air Act, Federal Water Pollution Control Act, and various nondiscrimination mandates such as Title VI of the Civil Rights Act. Additionally, contractors working outdoors must maintain a written heat safety plan in both English and Spanish. Invoicing is handled electronically in PDF format, with payments issued upon receipt of signed delivery or service tickets.
Neighborhood Services

POSTED

about 18 hours ago

DEADLINE

in 8 days
NAICS: 541350
New
Federal
H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, Base (4) Canandaigua VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Solicitation # 36C24227Q0041
The Department of Veterans Affairs is soliciting quotes for a Qualification of Elevator Inspectors (QEI)-Certified Inspector to serve as a third-party witness for annual and semi-annual safety inspections and testing at the Canandaigua and Bath VA Medical Centers in New York. This service-disabled veteran-owned small business set-aside under NAICS 541350 consists of a 12-month base period starting November 1, 2026, with four additional 12-month option years. The certified inspector is responsible for independent witnessing and reporting using VA Form 10-6167, while a separate maintenance contractor provides the labor and equipment to perform the physical tests. All work must comply with the most current ASME A17.1 and ANSI/ASME 17.2 codes. The scope of work includes semi-annual inspections, annual hydraulic pressure tests, and annual traction no-load tests during the base and final option years, with five-year traction full-load tests scheduled for Bath VAMC in option year one and Canandaigua VAMC in option year two. Services are typically performed in April and October. Award will be based on an evaluation of technical capability, past performance, and total price. Offerors must submit a technical capability statement of no more than 10 pages and adhere to New York State licensing and Service Contract Act wage determinations.
242-NETWORK Contract Office 02 (36C242)

POSTED

1 day ago

DEADLINE

in about 2 hours
NAICS: 541350
New
Federal
H259-- ELECTRICAL 5-YEAR ARC FLASH STUDY (VA-27-00002938)
Solicitation # 36C25227Q0050
The Department of Veterans Affairs is seeking a firm fixed price contract modification for a comprehensive Arc Flash Hazard Analysis at the Iron Mountain VAMC. The project requires a Registered Professional Electrical Engineer with at least five years of experience to oversee the study, which must comply with NFPA 70E, NFPA 70, and IEEE 1584 standards. The scope encompasses all significant electrical distribution locations from the utility supply down to 208V systems, including switchgear, motor control centers, and panelboards. The contractor will perform data gathering and field verification, a three-phase bolted fault short-circuit study, a protective device coordination study, and the calculation of incident energy and flash protection boundaries. Key deliverables include the installation of machine-printed arc flash warning labels, the adjustment of protective devices, and a final comprehensive report featuring time-current curves, fault current calculations, and updated electrical one-line diagrams in AutoCAD and PDF formats. The contractor must also conduct an exit briefing for facility staff to discuss hazard areas and NEC violations. All work must be completed within 180 days of the notice to proceed, with onsite activities performed during normal business hours. This procurement is intended as a sole source award to SDV Services Inc. under 41 U.S.C. 1901 simplified acquisition procedures to ensure consistency with ongoing electrical testing at the facility.
252-NETWORK Contract Office 12 (36C252)

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 541350
New
Federal
Aviation Operations Center (AOC)- Building Engineer Report (BER)
Solicitation # 15DDHQ27R00000001
Solicitation 15DDHQ27R00000001 is a request for proposals from the Department of Justice, Drug Enforcement Administration, to obtain a Building Engineer Report (BER) for the Aviation Operations Center (AOC) located at Alliance Airport in Fort Worth, Texas. This is a 100% small business set-aside procurement conducted under FAR Part 12 for commercial services, with the government intending to issue a single firm fixed price purchase order. The scope of work requires a comprehensive inspection of the building's interior, exterior, and grounds, covering structural elements, HVAC, plumbing, electrical, life safety, and force protection. Key deliverables include a summarized BER based on a Building Condition Assessment with cost estimates and photographs, a detailed scheduled operations and maintenance plan, and a list of potential energy conservation improvements. Proposals must be submitted electronically to Jose Marin by November 30, 2026, and must be divided into a technical volume and a business volume. The technical volume is limited to 20 pages and will be evaluated based on technical capability, key personnel qualifications, and past performance. These non-price factors are significantly more important than price, although price will be evaluated for reasonableness. Award will be based on the best value to the government. Contractors must comply with strict security requirements, including the submission of Facility Access Request forms, execution of non-disclosure agreements, and completion of mandatory cybersecurity and privacy training. Performance is structured across several tasks, with the final BER due two weeks after the review meeting.
Office Acquisition Management

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is soliciting informal bids under solicitation HSR26-26 Re-Bid #2 for a comprehensive on-site building inspection and repair recommendation project for its Fresno Office located at 11111 H Street, Fresno, CA 93721. The selected contractor will be responsible for evaluating all major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, security, the building envelope, and life-safety and structural components. Key deliverables include a comprehensive written inspection report with supporting photographs, an executive summary of critical risks, a prioritized list of corrective actions, and rough order-of-magnitude cost estimates for all recommended repairs. The project requires personnel knowledgeable in federal, state, and local building codes, as well as current safety and accessibility standards. The response deadline is November 6, 2026, and the solicitation is categorized under NAICS code 541350. Bidders must provide a valid Class A or Class B license from the California Contractors State License Board and submit several required documents, including a cost sheet, payee data record, and bidder certifications. Evaluation is based on cost reasonableness and past performance, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. The contract includes strict compliance requirements regarding the Authority's Conflict of Interest Code, the Americans with Disabilities Act, and a ten-year confidentiality survival period. Invoicing is permitted monthly in arrears, and the final report is due five business days after the Authority provides feedback on the initial draft.
California High-Speed Rail Authority

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 541350
New
SLED
Operation and Management of the Building Department
Solicitation # AD-26-01
The City of Pembroke Pines is soliciting proposals under RFP AD-26-01 for the operation and management of its Building Department. The project utilizes a City-Provided Leadership Model, where the City retains the Chief Building Official and Building Department Operations Manager, while the contractor provides all other necessary administrative, clerical, and technical staff, including Assistant Building Officials, Trade Chiefs, Plan Reviewers, and Inspectors. The selected firm will be responsible for issuing permits, performing inspections, and executing statutory duties in accordance with the Florida Building Code and Broward County Amendments. The contract is for an initial five-year term with one five-year renewal option. Proposals are due by 2:00 pm on November 10, 2026, and must be submitted electronically via the City's e-Procurement Portal. Pricing is based on a proposed percentage of gross revenue derived from building permit fees, with specific daily rates established for key roles such as Assistant Building Officials at 1,500 dollars and Trade Chiefs at 1,000 dollars. Award decisions will be based on the most responsive and advantageous proposal, with preference points available for local Pembroke Pines vendors, Broward County vendors, and Veteran-Owned Small Businesses. Contractors must ensure all personnel have at least three years of relevant experience and hold required state and county certifications. Strict vehicle marking standards are required, including uniform colors and specific City of Pembroke Pines identification. The contractor must also implement a comprehensive Quality Assurance program to track performance metrics such as turnaround times and error rates. Required submittals include a Letter of Intent and a sworn Affidavit of Accuracy.
City Manager's Office

POSTED

3 days ago

DEADLINE

in 12 days

General Info

NAICS

541350 - Building Inspection Services

Place of Performance

Department of Veterans Affairs Jack C. Montgomery VA Medical Center 1011 Honor Heights Drive, Muskogee, OK, 74401, USA

Set-Aside

SDVOSBC

Documents

1

Boiler Semi-Annual Inspection/Testing 36C25925Q0780

DOCX, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Orrellius WilliamsContract Specialist

Full Description

Show more
Boiler Safety Testing/Inspection Services Jack C. Montgomery VAMC Muskogee OK 74401 BRIEF SCOPE OF WORK (This is for information only) This RFI (Request for Information) is for information only. No award will be made from this RFI. The Department of Veterans Affairs has a requirement for a contractor to provide Boiler Safety Testing/Inspection/services and Feedwater Deaerator Tank inspection/services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Jack C. Montgomery VA Health Care System s COR. This contract will have a Base Period Period of Performance (POP) with four (4) Optional Periods of Performance (Options may or may not be exercised). Location of Performance: Jack C. Montgomery VA Medical Center 1011 Honor Heights Drive Muskogee OK 74401 INSPECTION SERVICES: General: Contractor shall perform combustion analysis and tuning, safety device testing, and boiler inspections on three (3) fire tube boilers as specified within all updated manufacturer specifications and requirements and provide inspections of two (2) feedwater deaerator tanks. Technicians shall have adequate experience, training, and applicable licensing, to perform required preventative maintenance. Contractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms of liability and follow all federal, state, local, and VA Regulations related to this requirement. Upon request, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards. Introduction: (VA) Jack C. Montgomery medical center has a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, sterilizing services, and laundry equipment. The VA has a requirement for: Annual internal and external inspections on three (3) (listed below) high pressure (over 15 psig) steam boilers A semi-annual requirement to perform burner and instrument inspecting, testing, calibrating burners and controls, and annual testing of all safety devices on the three (3) (listed below) high pressure (over 15 psig) steam boilers and two (2) (listed below) deaerator tanks An annual external inspection of two (2) (listed below) feedwater deaerator / condensate surge tanks. A 6 year inspection and magnetic particle testing of welds of pressure vessel interior of the feedwater deaerator tank (listed below). To be completed in base year of contract only. List of Equipment: Boiler #1 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-9 Boiler #2 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-10 Boiler #3 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-8 Feedwater Deaerator Tank: manufactured by: Wheeler Tank Mfg, Model number: 10ST5 (M), SN: 11572 Condensate Tank: manufactured by: Wheeler Tank Mfg, Model number 10ST, SN: 15564 Qualifications of Testing Personnel: Boiler Inspectors shall be a Qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of reference materials defined below. A Qualified Professional Inspector is defined as one who possess one or combination of below requirements: A boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB). A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state. A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee. A boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance. Combustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Proof of qualification shall be provided to the COR upon request. Qualifications include completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants. Reference Materials are comprised of the latest versions of the below, plus any other materials/manufacture reference materials needed to complete all contract requirements: ASME Boiler and Pressure Vessel Code ASME B31.1, Power Piping Code ASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers ANSI/NB-23, National Board Inspection Code NFPA 85, Boiler and Combustion Systems Hazards Code VHA Boiler Plant Safety Device Testing Manual, 5th Ed. Utilize National Board Forms NB-6 and NB-7 NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, The testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards. Inspection and Testing Requirements: At least two weeks notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The annual Internal/External Boiler inspections are to be performed in June, July and August. The semiannual tunings are to be performed in September and March. The annual safety device testing is to be performed in March. The contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service. Each burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary. VA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating. VA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing. The COR or his/her representative will observe the work. Combustion Analysis/Tuning and Safety Device Testing summary of requirements: The inspections, testing, and adjustments shall comply with: The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual. The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices. Burner performance requirements in this document. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract. Test the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. Immediately inform COR of any recommended repairs, modifications, or safety related problems. List of interlocks and safety devices to be inspected and tested on each Boiler/Burner/Condensate/DA tank/Plant safety: Low Water alarm on Condensate Tank (LWACT) High Water alarm on Condensate Tank (HWACT) Low Water alarm on DA Tank (LWADT) High Water alarm on DA Tank (HWADT) DA Tank Overflow Drain System (DAODS) DA Tank Safety Valve (DASV) Steam Safety Valve following PRV (SVFPRV)- Deaerator Liquid Relief Valve on Oil Pump Set (LRVOPS) Carbon Monoxide and Combustible Gas Alarms in the Boiler plant. The Following Items Are to Be performed on Each Boiler Liquid Relief Valve on Economizer (LRVE) Propane Pilot Backup System Low Water alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO) High Water alarm on Boiler (HWAB) Recycle and Non-recycle Steam pressure limit switches (RBSPLS & NRBSPLS) Steam safety valves on Boiler (SVB) Low Fuel Gas Pressure Cutoff Switch (LFGPCS) High Fuel Gas Pressure Cutoff Switch (HFGPCS) Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV)-Main Gas Line Automatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV) Proof of closure on Automatic Fuel Shutoff Valves (POCAFGSOV) Natural Gas Flame Scanner for main flame out (FSMFO) Natural Gas Flame Scanner for main flame out (FSMFO) Fuel Oil Flame Scanner Not Sensing Igniter Spark (FSNSIS) Igniter Timing (IT) Main Flame Ignition Timing (MFIT) Pre-Purge and Post-Purge Timing (PPT) Low Fire Proving Switch (LFPS) Forced Draft Damper Wide Open Pre-Purge Proving Switch (FDDWOPS) Combustion Air Pressure Switch (CAPS) Purge Airflow Proving Switch (PAPS) Forced Draft Motor Interlock Switches (FDMIS) Outlet Stack Damper Position Interlock Switch (OSDPI) Furnace Pressure Interlock (FPI) Low Pilot Gas Pressure Cutoff Switch (LPFGPCS) Flue Gas Recirculation Damper Interlock (FGRDI) Low Flue Gas Oxygen Level Interlock (LFGOLI) Low Fuel Oil Pressure Cutoff Switch (LFOPCS) High Fuel Oil Pressure Cutoff Switch (HFOPCS) Low Atomizing Media Pressure Switch (LAMPS) Automatic Fuel Oil Shutoff Valves (AFOSV) for Seat Leakage Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC_AFOSV) Oil Oil Burner Position Switch (OBPS) Emergency Stop/Panic Buttons (ESPB) Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm) Maximum NOx (Nitrous Oxide): _____ (Refer to original burner specification). Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations. Flames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls. Boiler Inspections summary of requirements: Annual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required every six years or more frequently if welding repairs have been performed. Contractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. The annual Internal/External Boiler inspections are to be performed in June, July and August. Feed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand. Coordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections. Boilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection. VAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection. The boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work. The inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 5th Edition. Summary of the minimum inspection requirements for boilers: Review the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. Inspect foundations for signs of stress such as cracking or movement. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Set combustions for boilers number one, two, and three, on natural gas and number two oil. Test all safety devices and perform annually required accumulation tests on boilers one, two and three. Verify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions. Inspect seating surfaces of man ways and hand holes. Check that boiler structure is plumb and level with no excessive deformations. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of burner assembly. Inspect furnace for evidence of flame impingement. Test operation of water level gage glass. Perform mechanical and electrical inspection of disassembled low water cutouts. After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually. Verify that steam pressure gage is properly calibrated. Test operation of high steam pressure cutouts on hot boilers by raising steam pressure. Inspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ). Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions. Inspect valves on boiler feed water, blow down, drain and steam systems. Perform service and Calibration of boiler instrumentation and controls. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions. Summary of the minimum inspection requirements for Feed water Deaerators: Review the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications. Assess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes. Test hazardous gas monitoring system. Inspect for evidence of leakage. Note feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy. Inspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases. Inspect support structures for proper integrity and allowance for thermal expansion. Internal Inspections Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking. Inspect spray nozzles and trays. IMPORTANT NOTE: This RFI (Request for Information) is for information only. No award will be made from this RFI. Please communicate via e-mail to contact@example.gov by COB (1530 PM CT) September11, 2025 as to your company s ability to perform service per this brief Scope of Work. If interested, please provide the following: 1. Please state your company s business size 2. Please provide DUNS number 3. If you have an FSS/GSA contract that includes this service 4. Provide FSS/GSA contract number if applicable

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 339112
New
Federal
6695--SURGERY GLOBUS INSTRUMENT SET
Solicitation # 36C25927Q0043
The Oklahoma City Veterans Affairs Health Care System requires one complete Globus Medical instrument set for use in neurology and orthopedic spine surgeries. This comprehensive solution must include all necessary components for functionality, such as cables, connectors, and mounts, and must adhere to stainless-steel standard operating procedures. The instruments must be reusable and specifically designed for spinal procedures in the operating room. The contractor must be an expert in the neuro and ortho spine field and is responsible for replacing any malfunctioning or broken items at no cost to the VA for the first 12 months following purchase, coordinating maintenance with the OKC VAHCS Biomedical Engineering Department. This procurement is identified as a sources sought notice under NAICS code 339112 and is set aside for Service-Disabled Veteran-Owned Small Businesses. Deliveries to the Oklahoma City facility are required Monday through Friday between 07:00 and 16:00. The instrument set consists of 35 specific line items, including various pedicle probes, rod templates, ratcheting handles, driver shafts, and taps. Interested vendors must provide a capability statement, business size information, country of origin, and estimated lead times. There are no security accreditation requirements as the contractor will have no access to patient records or restricted hospital areas, and no VA employee training is required.
Surgical and Medical Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 513210
New
Federal
R604--Mail Tracking Service
Solicitation # 36C25927Q0017
Solicitation 36C25927Q0017 is a firm-fixed price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide a web-based package and mail tracking system for the Department of Veterans Affairs. The primary site of performance is the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, specifically within the KS-100 SCMS Warehouse. The system must be capable of processing approximately 250,000 parcels and will initially support up to 12 users. The contractor is responsible for providing all necessary hardware, including one barcode printer, 12 scanners with integrated signature pads, and one mobile device, as well as all associated consumables and routine replacement parts. The software will operate as a standalone system not connected to the VA network, meaning it should be SaaS permitted and will not require integration with internal VA identity management or directory services. The contract consists of a base period from October 30, 2026, to October 29, 2027, with four subsequent one-year options extending the total potential duration to five years and six months. Quotes are due by 14:00 MT on October 30, 2026. Pricing must be comprehensive, including all initial hardware, installation, and implementation costs within the original quote, though the government accepts a higher base-year price to account for these non-recurring expenses. Technical support is required to align with warehouse operating hours of 6:30 a.m. to 2:30 p.m. Award will be based on a comparative analysis of technical capability, price, and past performance, with a strict requirement that offerors be VetCert verified to be eligible for award.
Software Publishers

POSTED

2 days ago

DEADLINE

in 1 day
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation, sidewalk leveling, curb repair, and the removal and replacement of concrete sections to address trip hazards and improve snow removal. The scope of work includes 52 specific repair items and requires strict adherence to VA standards, AIA Construction Guidelines, and Joint Commission Environment of Care Standards. Performance must begin within 10 calendar days of award and be completed within 90 calendar days. The government will award the contract based on best value, evaluating offerors on price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate (EMR) of 1.0 or less. Contractors must provide a Site Specific Safety Plan and ensure a competent person with a 30-hour OSHA card is on-site at all times. Proposals must be submitted via email to Elia L Ruiz Manzo by November 13, 2026, at 10:00 AM MT, and must include a signed SF-1442, a Limitations on Subcontracting certification, and past performance documentation.
Poured Concrete Foundation and Structure Contractors

POSTED

2 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS