Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HARBOR SUBSTATION LINE EXTENSION PROJECT PHASE II

Closed
20260619024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 23 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Harbor Substation Line Extension Project Phase II is a construction solicitation issued by the City of Anaheim Public Utilities Public Works Department. The project focuses on improving electric service reliability and capacity through the installation of new 12kV underground substructures and electrical equipment along Disney Way, Anaheim Boulevard, Haster Street, and within the Disneyland Resort. The scope includes installing fault indicators, specific switches and groundings on Disney property, and supplying materials such as vaults, conduit, and 600-volt conductors. The contractor is also responsible for installing City-provided automation equipment and performing Tan Delta testing for the electrical systems. The estimated construction cost is 11,100,000 dollars, with a project duration of 280 working days. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of lump sum items and unit prices. Bidders must submit proposals via the OpenGov portal by August 13, 2026, and provide a physical original bid bond to the City Clerk. Key requirements include adherence to the 2024 Standard Specifications for Public Works Construction, payment of prevailing wages as determined by the State of California or the Davis-Bacon Act, and the submission of certified payroll records by the 10th of each month. Quality assurance is managed by the City, with final acceptance contingent upon the successful completion of electrical testing and the establishment of any landscape improvements.

General Info

Install 12kV underground power lines and upgrade substations in Anaheim to enhance grid reliability and capacity.

Agency

California → City of Anaheim, Anaheim Public Utilities, Public Works DepartmentView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Anaheim, CA, 92805, USA

Set-Aside

NONE

Documents

(10)

Harbor Substation Line Extension Phase II Plans Addendum No. 2

PDFamendment

RCP 2025-23122 Harbor Substation Line Extension Project Phase II Specifications and Special Provisions Addendum No. 3

PDFspecifications

Harbor Substation Line Extension Project Phase II - Contract Documents Specifications and Special Provisions

PDFcontract-document

Harbor Substation Line Extension Phase II Plans

PDFspecifications

Addendum No. 1 for Harbor Substation Line Extension – Phase II

PDFamendment

Addendum No. 3 for Harbor Substation Line Extension – Phase II

PDFamendment

Followers List Vendor Contact Information

CSVother

Electrical_Construction_Standards_Book_-_Addendum_No.1_1782179302447.pdf

PDF

Electrical_Construction_Standards_Book.pdf

PDF

Addendum No. 2 - Harbor Substation Line Extension Phase II

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Anaheim, Anaheim Public Utilities, Public Works Department
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Anaheim, Anaheim Public Utilities, Public Works Department
View Agency Profile
Office AddressN/A
Contacts
John MartinConstruction Contract Administrator
Jason RillorazaAssociate Power Engineer

Full Description

Show more
Construction will consist of installing new 12kV underground substructures and electrical equipment along Disney Way, Anaheim Boulevard, Haster Street, and within the Disneyland Resort. The project is part of the Anaheim Public Utilities Capital Improvement Program to improve electric service reliability and capacity in these areas.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS