Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sign Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
IFB-26-27-015-Brookview Road Transmission Pole Access Road
Solicitation # IFB-26-27-015
The City of Danville is soliciting bids from Virginia-licensed contractors for the construction of an access road off Brookview Road to provide access to electrical transmission poles. Located within a 100-foot wide city easement on parcel 00182, the scope of work includes mobilization, clearing, grubbing, grading, the installation of storm culverts and structures, curb and gutter construction, and paving. The project also requires the implementation of erosion and sediment control measures, a stormwater BMP, and the delivery of an as-built survey. All work must comply with federal, state, and local regulations, including permits from the DEQ and USACE, and contractors must maintain a minimum clearance of 20 feet from energized transmission lines. Bids are due by October 8, 2026, at 2:00 PM, and will be awarded to the lowest responsive and responsible bidder based on the total combined lump sum price, with consideration given to the proposed completion time. The project timeline specifies substantial completion within 60 calendar days and final completion within 75 calendar days from the Notice to Proceed. Required financial securities include a 5% bid bond and 100% performance and payment bonds, with the performance bond remaining in effect for one year after final acceptance. Additionally, a 5% retainage will be withheld from invoices until final completion. Liquidated damages for delays are set at $500 per day.
City of Danville

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 237130
New
SLED
Water Meter Gateway Tower
Solicitation # CIP PW 26-30
The City of Lathrop is soliciting bids for the Water Meter Gateway Tower project (CIP PW 26-30) located at 2908 Hemsworth Court, Lathrop, California. The project involves the construction of an 80-foot tall, self-supporting triangular lattice steel data transmission tower that is TIA-222-I compliant and capable of withstanding 110 mph wind gusts. The scope of work includes providing CA engineer-stamped plans, constructing a drilled concrete pier and pad, installing a city-furnished NEMA 3-rated equipment cabinet, and running electrical and communication conduits to a control hut. Additional site work includes asphalt removal and replacement and the installation of a traffic-rated concrete box. The facility is designed to support multiple gateway antennae for transmitting data from telemetrically-enabled water meters to City offices. The contract will be awarded to the lowest bidder based on the base bid price, with an engineer's estimate of 125,000 dollars. Work must commence within 10 working days of the Notice to Proceed and be completed within 40 working days. Bidders must provide a 10 percent bid bond, and the successful contractor must provide 100 percent performance and payment bonds, along with a 10 percent warranty bond. As a public works project, compliance with California Labor Code Section 1700 regarding prevailing wages is mandatory. Bids must be submitted in a sealed envelope to the City Clerk by October 20, 2026, and must include proof of current DIR registration. Progress payments will be processed monthly upon review by the project engineer.
City of Lathrop

POSTED

4 days ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
EIE490 Microreactor Synchronization, Eielson AFB, Alaska
Solicitation # W911KB279A007
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a Request for Information for the EIE490 Microreactor Synchronization project at Eielson Air Force Base, Alaska. This initiative involves the design and construction required to install a 45MWth/5 Mwe nuclear microreactor, specifically focusing on extending water, power, communications, and heating systems to support plant operations. A primary objective is the synchronization of the nuclear microreactor and the Combined Heat and Power Plant with the base electrical and steam heating distribution grids. The project is funded via MILCON with a target budget of approximately 135 million dollars. The project timeline indicates that planning and development began in December 2025, with a planned construction award in fiscal year 2028, substantial completion by October 2030, and fiscal closeout in fiscal year 2031. Key site challenges include a high water table and likely soil contamination, including PFAS. The government is currently evaluating the most effective contracting vehicle, considering options such as a standard FAR-based Firm-Fixed-Price contract or an Other Transaction Authority approach like Construction Manager at Risk. This RFI is voluntary and intended for market research under NAICS code 237130 to determine industry capabilities and the optimal project delivery method.
W2SN Endist Alaska

POSTED

4 days ago

DEADLINE

in 11 days
NAICS: 237130
New
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission is soliciting proposals for the installation of a new underground electrical service system at Jacques Cartier Park North in Gatineau, Quebec. The project aims to provide a permanent, higher-capacity power supply to support major events, such as Winterlude, while reducing reliance on diesel generators. The scope of work includes the removal of existing electrical infrastructure and the installation of a new 600V Hydro-Quebec service, a main distribution cabinet, low-voltage distribution for the park and Maison du Vélo, and the provision of power pedestals for temporary event connections. The project is divided into two phases: Phase 1 (Core Scope) focuses on infrastructure and civil works in the western portion of the park near Laurier Street, including chambers CT-1 and CT-2, while Phase 2 (Option Scope) extends to the south-east and north-east kiosks and associated pull manholes. The contract has a one-year term with an option to extend for an additional year. Bidders must be Canadian suppliers and hold specific Régie du bâtiment du Québec (RBQ) licenses, including subclasses 1.4, 1.5, 1.7, and 16, with the electrical subclass requiring a valid CMEQ license. Additionally, the contractor or their subcontractor must be recognized by Hydro-Quebec to perform underground civil and electrical distribution work. Key project requirements include the protection of significant trees, adherence to a spill prevention and response plan, and the reinstatement of the park to its original condition. Award decisions will be based on a two-tiered financial framework; if the combined price for both phases exceeds the budget, the NCC may award the contract for Phase 1 only to the top-ranked proponent. Performance and labour and material payment bonds are required at 50 percent of the project value.
National Capital Commission

POSTED

4 days ago

DEADLINE

in 2 days
NAICS: 237130
New
SLED
Overhead Contact System Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Overhead Contact System Rehabilitation Project Phase 4A – Tasman West/East, solicitation number C26152F, is issued by the Santa Clara Valley Transportation Authority for work in Santa Clara, California. The project involves the detailed engineering design, procurement, delivery, installation, and testing of an Overhead Contact System (OCS) within the Tasman West Corridor, specifically on Tasman Drive and East Java Drive. Key technical requirements include the installation of new 300 kcmil contact wire, registration insulators, in-span insulators, and surge arresters, extending from traction power substation feeder breakers to the light rail vehicle pantograph. The contractor must provide detailed construction staging schedules to maintain light rail service and perform a pre-construction survey of all OCS and structural components. Bidders must undergo a rigorous pre-qualification process involving a scored questionnaire, where a total score of 57 to 76 is required to pass. Evaluation factors include the firm's claims history and average gross revenue. Qualified contractors must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 aggregate, as well of workers' compensation insurance. Because work occurs in an active light rail environment and involves the agency's only LRV wash facility, strict adherence to safety procedures and close operational coordination are mandatory. All submissions must be made electronically via the VTA eProcurement portal by the response deadline of November 13, 2026.
Santa Clara Valley Transportation Authority

POSTED

4 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Manteca in California is seeking a subcontractor for the supply, delivery, and installation of traffic signs. The scope of work includes post mounting, foundation work, and necessary compliance verification to ensure all installations meet required standards. This project falls under NAICS code 237130 and will be performed within Manteca, California 95337. The solicitation was posted on June 19, 2026, and the deadline for responses is July 2, 2026, at 9:00 PM. Interested parties can find further details and submission guidelines through the provided BidAmerica portal.

General Info

City of Manteca seeks subcontractor for traffic sign supply and installation by July 2.

Documents

This scope was carved out of 20260618008.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

YOSEMITE AVE PAVEMENT IMPROVEMENT PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Manteca
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Manteca
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, delivery, and installation of traffic signs including post mounting, foundation work, and compliance verification.

More opportunities from California → City of Manteca

Same awarding agency

NAICS: 541330
New
SLED
Wastewater Quality Control Facility Dilution Study And Thermal Plan Exception Analysis Report
Solicitation # 20261001008
The City of Manteca is soliciting professional engineering services to conduct a Dilution Study and Thermal Plan Exception Analysis Report for its Wastewater Quality Control Facility in Manteca, California. The primary objectives of this project are to support the revision of water-quality based effluent limits for ammonia and dieldrin within the National Pollutant Discharge Elimination System and to evaluate compliance with the State’s Water Quality Control Plan for Control of Temperature. The selected consultant will develop the technical, regulatory, and biological justifications necessary to seek a Thermal Plan exception for discharges into the San Joaquin River and identify cost-effective compliance alternatives if an exception is denied. Key deliverables include the final analysis report, a technical memorandum summarizing findings, and a potential compliance strategy memorandum. The contract will be awarded as an Actual Cost with a Not to Exceed Amount agreement, with the City negotiating the final scope and fee with the top-ranked firm. Selection is based on a 100-point evaluation focusing equally on project management, project understanding, project approach, and experience. Proposers must provide a California-registered Professional Engineer to stamp all reports and maintain significant insurance coverages, including 2 million dollars for Commercial General Liability and Professional Liability. Additionally, the consultant must comply with California prevailing wage requirements and provide detailed financial disclosures, such as SEC Form 10-K or 10-Q, as part of the proposal package. Proposals are due by October 16, 2026, and must be limited to 15 pages, excluding appendices and cover letters.
Engineering Services

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 541330
New
SLED
Professional Engineering Services for WQCF Dilution Study & Thermal Plan Exception Analysis Report
Solicitation # RFP-2026-0002
The City of Manteca is soliciting proposals for professional engineering services to conduct a Dilution Study and Thermal Plan Exception Analysis Report for its Wastewater Quality Control Facility. The primary objectives of this project are to support the revision of water-quality based effluent limits within the National Pollutant Discharge Elimination System, determine revised ammonia and dieldrin effluent limits under the State Implementation Policy, and evaluate compliance with the State Water Quality Control Plan for Control of Temperature. The selected consultant will be responsible for data collection, modeling, and the preparation of a technical memorandum and final report, while identifying cost-efficient compliance alternatives if a thermal plan exception is not granted. Proposals are due by October 15, 2026, at 5:00 PM PST, with requests for clarification accepted until October 9, 2026. The City will award the contract based on a weighted evaluation of project management, project understanding, project approach, and experience, each accounting for 25 percent of the total score. The resulting agreement is expected to be an Actual Cost with a Not to Exceed Amount contract, with final scope and fees negotiated with the top-ranked firm. Requirements for the selected consultant include adherence to California Prevailing Wage laws, strict quality assurance and quality control procedures, and the provision of financial disclosures such as SEC Form 10-K or 10-Q.
Engineering Services

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS