This Subcontract opportunity from Georgia was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HDPE Down Drain Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, to support the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The selected subcontractor will be responsible for providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project requires the integration of material characterization tests, including California Bearing Ratio, Plate Load, and Dynamic Cone Penetrometer tests, with critical operations phased to allow for continuous subgrade adjustments. The subcontractor must manage all material procurement, delivery, and the removal of construction waste and debris. Additionally, the contract encompasses professional engineering services for geotechnical design and inspection, as well as roadway materials testing. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

31 minutes ago

DEADLINE

in 2 months
NAICS: 237130
New
SLED
Copper Replacement Project
Solicitation # PE-66397-NONST-2027-000000019
The City of Sylvania is soliciting sealed bids for the Copper Replacement Project to enhance the reliability and resilience of its electrical distribution system in Georgia. The scope of work involves replacing approximately 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire and replacing roughly 95 failing electrical distribution poles. The selected contractor will be responsible for all labor, equipment, installation, removal, testing, and commissioning, including the upgrade of connectors, insulators, crossarms, and grounding components. The project requires strict coordination with the City to maintain service continuity during planned outages and necessitates final system testing to verify proper load distribution and functionality. Bids must be submitted by January 13, 2027, and will be evaluated based on total project cost, relevant electrical distribution experience, the ability to meet the schedule, references from at least three similar projects, and overall responsiveness. Required documentation includes proof of Georgia licensing, E-Verify compliance, and a non-collusion affidavit. Financial guarantees include a bid bond of at least 10% of the total bid, with 100% performance and payment bonds required upon award. Additionally, if the project is federally funded, the contractor must comply with the Davis-Bacon Act for prevailing wages and Build America, Buy America (BABA) sourcing requirements.
City of Sylvania

POSTED

about 5 hours ago

DEADLINE

in about 2 months
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
The City of Pasadena Water and Power Department is soliciting proposals under solicitation 2026-RFP-0272 for comprehensive wood pole inspection, treatment, repair, and UAV inspection services. The project covers approximately 11,000 wood poles within a 23-square-mile electric distribution system to ensure structural integrity and regulatory compliance with CPUC General Orders 95 and 165. The scope of work includes ground-based visual and intrusive inspections, the application of EPA-registered preservatives and fumigants, and the use of FAA-compliant drone services to capture high-resolution imagery of pole tops and overhead facilities. Hazardous conditions must be reported to the city within 24 hours. The resulting contract will have an initial term of four years with two optional one-year extensions. Award selection is based on a points-weighted system evaluating technical approach, qualifications, safety, and price, with a 5-point preference for local Pasadena businesses or certified small/micro-businesses. Proposers must submit a technical proposal not exceeding 50 pages and a separate price proposal via the city's eProcurement Portal by November 19, 2026. Mandatory requirements include compliance with California Prevailing Wage laws, submission of various city-specific forms such as Form AA-1 and a Declaration of Non-Collusion, and strict prohibitions against using city data to train AI or machine learning models.
Water & Power Department, Power Delivery

POSTED

about 20 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract mandates the installation of sixteen 18-inch high-density polyethylene down drains to facilitate stormwater conveyance from surface runoff systems to subsurface drainage infrastructure. The work is classified as a subcontract under NAICS code 237130, which pertains to water and wastewater pipeline construction, and is issued by the JDA of Jasper, Morgan, Newton & Walton Counties in Georgia. The solicitation was posted on June 23, 2026, with a response deadline of July 27, 2026, at 7:00 PM Eastern Time, and the place of performance is not explicitly defined but is understood to be within the jurisdiction of the involved counties. No set-aside provisions or specific point of contact details are provided, and bidders should reference the official UI link for further procedural guidance and submission requirements.

General Info

Install sixteen 18-inch HDPE down drains for stormwater conveyance in four Georgia counties by July 27, 2026.

Documents

This scope was carved out of J-26900.0015.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Moore Tract - ESPC & Grading

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ANE-1256-02 BNACTS - UIS COMM BDF RCAG Tower InstallationOpen now, due in 23 days
  • ANE-1251-01 BNACTS-UIS COMM- LNK RTR Tower InstallationOpen now, due in 23 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Jda of Jasper,morgan,newton & Walton Counties
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install sixteen 18-inch HDPE down drains for stormwater conveyance from surface to subsurface systems.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS