High-Vacuum Chamber and System Integration

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Berkeley National Lab DOE Contractor involves the design, engineering, and fabrication of a high-vacuum environment and structural frame for Advanced Light Source projects. The scope of work includes manufacturing a vacuum chamber with a 1.0 meter throw distance and dimensions of 8 by 7 by 7.5 feet, utilizing high-vacuum grade stainless steel and adhering to HV/UHV engineering standards. Additionally, the contractor must engineer a power architecture compatible with 208V three-phase/100A constraints to deliver a fully vacuum-tight evaporation system chassis. The project is categorized under NAICS code 332710 and is located in zip code 94720. The solicitation was posted on September 17, 2026, with a response deadline of September 26, 2026.

General Info

Subcontract for designing and fabricating a high-vacuum environment and structural frame for BNL.

Agency

Department Of Energy → Berkeley National Labor - DOE ContractorView Agency

NAICS

332710 - Machine ShopsView NAICS

Place of Performance

CA, 94720, USA

Set-Aside

NONE

Documents

This scope was carved out of KT-2026-01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Custom High-Vacuum E-Beam Evaporation System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Berkeley National Labor - DOE Contractor
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Berkeley National Labor - DOE Contractor
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design, engineering, and fabrication of a high-vacuum environment and structural frame for prime contractors on LBNL Advanced Light Source projects. Manufactures a vacuum chamber supporting a 1.0 meter throw distance within 8'x7'x7.5' dimensions and engineers power architecture for 208V three-phase/100A constraints. Uses high-vacuum grade stainless steel and HV/UHV engineering standards. Delivers a vacuum-tight evaporation system chassis.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor

Same awarding agency

NAICS: 333242
New
Federal
Custom High-Vacuum E-Beam Evaporation System
Solicitation # KT-2026-01
The Lawrence Berkeley National Laboratory Advanced Light Source Division is conducting market research via a Request for Information to identify sources capable of providing a Custom High-Vacuum E-Beam Evaporation System, including installation. This system is intended to support beamline instrumentation and experiments by enabling precise, high-purity thin-film deposition for samples, optics, and detector components. The project is categorized under NAICS code 333242 and is managed by the Department of Energy through the Berkeley National Labor DOE Contractor. Technical requirements for the system include a nominal throw distance of approximately 1.0 meter, a dedicated substrate load-lock for items up to 200 mm x 40 mm x 50 mm to avoid venting the main chamber, and an integrated motorized tilt stage for in-situ angled deposition. The system must simultaneously accommodate two ion sources, specifically a gridded ion source and a gridless ion beam source. Physical constraints limit the system to 8 feet in length, 7 feet in width, and 7.5 feet in height, with electrical requirements not exceeding 208 V three phase and 100 A. This effort is currently for informational and planning purposes only and does not constitute a formal solicitation or a request for a quote. Interested respondents must submit relevant product literature, technical specifications, and the country of origin of manufacture to Karen Tays by September 25, 2026. No set-aside has been designated for this research, and the small business size standard is defined as 1,500 or fewer employees.
Semiconductor Machinery Manufacturing

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 334516
Federal
Beamline 4.3.1 Monochromator system
Solicitation # JG-0909-26
Lawrence Berkeley National Laboratory is issuing a Request for Information under solicitation JG-0909-26 to identify potential providers for a high-stability X-ray monochromator system for Beamline 4.3.1 at the Advanced Light Source. The system is intended to support a broad scientific program in small- and wide-angle X-ray scattering, with optimized performance required at 10 keV and 17 keV. Key technical requirements include a double-multilayer monochromator baseline with an energy bandwidth of approximately 1 percent, a Si(111) crystal monochromator for higher resolution over 10 to 17 keV, and the integration of cryo-cooling for the first multilayer to manage thermal distortions. The system must also comply with strict facility vacuum, space, and radiation safety standards. This is a presolicitation effort to gather data on technical feasibility, budgetary costs, and delivery schedules, with a project magnitude estimated between 500,000 and 600,000 dollars. Interested respondents must complete the RFI form sections 1 through 5 by October 16, 2026. The anticipated timeline includes a formal Request for Proposal in winter-spring 2027, with final system delivery expected by December 2028. Evaluation of responses will focus on achievable performance, system complexity, and the ability to conduct comprehensive Factory Acceptance Testing regarding optical, mechanical, and environmental stability prior to delivery and commissioning at the Berkeley, California facility.
Analytical Laboratory Instrument Manufacturing

POSTED

11 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS