Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves a variance request to permit grading on slopes exceeding 30 percent to facilitate the construction of a 6,422-square-foot single-story single-family residence, an attached 1,131-square-foot garage, and three outdoor deck areas totaling 689 square feet at 1523 Badger Canyon Lane in Arroyo Grande, California. The proposed development will disturb approximately 0.92 acres of site area and require an estimated 1,060 cubic yards of cut and 1,600 cubic yards of fill, including utility trenching in steep areas. The project site is located within the Residential Suburban land use category and the San Luis Bay Inland Sub-Area, South, under the South County Planning Area. The variance is necessary only for portions of the driveway and utility connections, as the main structure itself does not require grading on slopes exceeding 30 percent. All work is governed by local ordinances, including San Luis Obispo County Land Use Ordinance Sections 22.51.120 and 22.52.150, and must comply with California Building Code, California Vehicle Code, and state environmental regulations. The application was submitted by Ryan Howes as the individual property owner and is administratively processed through the County of San Luis Obispo’s Department of Planning and Building, with no formal procurement contract structure established. The project is subject to a Mitigated Negative Declaration under the California Environmental Quality Act (CEQA), with a suite of binding environmental conditions of approval mandated for compliance. These include fugitive dust control using water trucks and covered haul vehicles, adherence to diesel idling limits of five minutes, protection of oak tree root zones via fencing around the canopy dripline, and preconstruction biological surveys to avoid disturbing nesting birds between February 1 and September 15. All construction personnel must complete a Worker Environmental Awareness Program, and qualified biological monitors must be onsite during active earthwork. Stormwater management requires zero discharge, spill response protocols, and implementation of best management practices for erosion control. Exterior lighting must be shielded and low-glare to meet visual impact standards, and all mitigation measures are enforced by the County as conditions precedent to construction. No federal contract clauses, line-item pricing, contracting officer representation, or procurement mechanisms apply; instead, the process is purely administrative and environmental, with approval contingent upon submission of documentation to the State Clearinghouse and final sign-off by the County. Financial transactions related to this

General Info

Variance requested for grading on steep slopes to build single-family home, garage, decks, with strict environmental protections.

Agency

California → San Luis Obispo County

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Arroyo Grande, CA, 93446

Set-Aside

NONE

Documents

(7)

Notice of Completion for Howes Variance Project N-DRC2025-00003

PDFnotice-of-completion

DTSC Comment on Howes Variance MND 2025081194

PDFcomment

Howes Variance N-DRC2025-00003 Environmental Initial Study

PDFinitial-study

Developer Statement for Howes Variance N-SUB2025-00003

PDFdeveloper-statement

Howes Variance Environmental Impact Summary

PDFenvironmental-summary

NOD N-DRC2025-00003 Howes Variance Mitigated Negative Declaration

PDFnotice-of-determination

Notice of Intent to Adopt Mitigated Negative Declaration for Howes Variance

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts

Full Description

Show more
The proposed project is a request by Ryan Howes for a Variance (N-DRC2025-00003) to allow grading on slopes exceeding 30% to facilitate the construction of a residential driveway intended to serve a 6,422-square-foot single-story single-family residence, a 1,131-square-foot attached garage, and three outdoor deck areas totaling 689 square feet. The proposed project will result in approximately 0.92 acres of site disturbance. While the proposed structure will not require grading on slopes exceeding 30%, there are multiple locations along the driveway where grading on such slopes will be necessary. Additionally, trenching for utility connections will also occur in areas with slopes exceeding 30%. The project includes site improvements over approximately 0.92 acres and would involve approximately 1,060 cubic yards of cut and 1,600 cubic yards of fill, including trenching for utilities. The project site is located at 1523 Badger Canyon Lane, at the intersection of Badger Canyon Lane and Fox Canyon Lane, in the unincorporated area of Arroyo Grande. The project site is within the Residential Suburban land use category and lies within the San Luis Bay Inland Sub-Area, South, of the South County Planning Area.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The scope of work includes extensive upgrades to the facility’s biogas and energy systems, such as replacing digester gas piping, safety equipment, and supports; installing new level measurement devices; retrofitting four digesters with recoated headspaces and structural concrete repairs; replacing two access roof hatches on each digester with associated concrete work; and installing five owner-furnished linear generators with full electrical integration. The project also entails the installation of biogas conditioning and renewable natural gas upgrading equipment with a dedicated pipeline to connect to the PG&E injection station, replacing the existing steam boiler and system with a hydronic heating water system, and replacing all waste gas flares with new enclosed models. Additionally, the full demolition of the Cogen facility and related appurtenances is required, along with broader civil, structural, mechanical, electrical, and demolition activities. Bidders must align with specified NAICS codes including 237310, 238110, 238120, 238190, 238320, 238220, and 238210, and must register through GSE Construction’s estimating email to gain secure access to all project documentation prior to submission. The solicitation closes on August 20, 2026, and participation is encouraged for Disadvantaged Business Enterprises certified under Department of Transportation guidelines, Minority Business Enterprises certified by NMSDC, and Woman Business Enterprises certified by WBENC.
GSE Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor and Construction Manager, encompasses a comprehensive range of construction and renovation activities essential to modernizing the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems. All work is to be performed on-site at the airport, and the estimated contract value ranges between $124.2 million and $143.7 million, with individual subsystem budgets ranging from $600,000 for runway marking to $50 million for demolition and abatement. The project is designated as a Small Disadvantaged Business (SDB) set-aside under NAICS code 238910 and operates under a Project Labor Agreement requiring union labor standards and adherence to Hensel Phelps’ standard subcontract forms, which must be used for all subcontracts. Bidders are required to submit proposals via email to SEA-SCEBids@henselphelps.com no later than August 11, 2026, using the official bid form provided in the Instructions To Bidders document, accompanied by performance bonds for subcontracts exceeding $100,000 and a waiver of subrogation for workers’ compensation claims. The solicitation emphasizes compliance with Hensel Phelps’ contract administration practices, including bonding requirements and subcontracting protocols, while the place of performance is strictly limited to the airport’s S Concourse area in Washington. The project does not specify evaluation criteria, payment details, or contract administration contacts beyond the primary point of contact, Bill Westfall.
Hensel Phelps

POSTED

about 3 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project entails building a new 0.50 MGD facility designed to produce approximately 500 acre-feet per year of purified water, featuring key components such as a 200,000-gallon equalization tank, membrane filtration and two-stage reverse osmosis systems, UV/advanced oxidation process, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping infrastructure, approximately 2,000 linear feet of HDPE conveyance pipelines, and groundwater recharge elements including one injection well and two monitoring wells. The scope also encompasses all necessary electrical, instrumentation, SCADA, and control systems required for facility operation. Bidders must operate under one of the specified NAICS codes including 237110, 238120, 237310, 238990, 561730, 238110, 238320, 332312, 238220, and 221310, and must respond to the solicitation by the deadline of August 11, 2026. All interested parties must request access to the full project documents via email to estimating@gseconstruction.com, after which a secure link will be provided for review. The solicitation is categorized as a small business opportunity under SBA guidelines, with set-asides reserved for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Disadvantaged Business Enterprise under Department of Transportation criteria, and Minority Business Enterprise certified by NMSDC. The agency responsible is GSE Construction Co., Inc., and the primary point of contact for inquiries is Michael Demissie, reachable via email at mdemissie@gseconstruction.com or phone at 925-447-0292. Juan Catano is also listed as a point of contact for additional support. The project is located at 966 Huber Street, Pismo Beach, CA 93433, and all bidders are expected to review the complete project documentation prior to submission. The solicitation was posted on August
GSE Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details