Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Huntington Lake Dam No. 1 Low-Level Outlet Valves Replacement Project (Amendment No. 2 to Notification of Lake or Streambed Alteration, No. EPIMSFRE-31312-R4)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement Notification No. EPIMS-FRE-31312-R4 to authorize Southern California Edison Company to perform repairs and replacements on key components of the low-level outlet valve system at Big Creek Dam No. 1, located on the southwest side of Huntington Lake in Fresno County. This Amendment No. 2 specifically revises the location and configuration of Work Area 4’s temporary landing site to ensure safe and environmentally compliant access during project execution. The activity is conducted under Section 1602 of the Fish and Game Code and qualifies for a Class 1 categorical exemption under CEQA, as it involves minor alterations to existing infrastructure with no significant environmental impact. The project is administratively managed through the Department’s Region 4 office in Fresno, with oversight responsibilities shared between Southern California Edison as the executing entity and the Department’s environmental staff, including Benessa Galvan as the primary contact for environmental compliance. No detailed pricing, contract value, or federal acquisition regulation clauses are included in the documentation, as this is a state-level environmental authorization rather than a federally procured contract. Performance is confined to the dam site, with no specified delivery schedule, payment terms, or invoicing mechanisms documented. The responsible parties include Hazem Gabr as the project manager for Southern California Edison and Benessa Galvan as the senior environmental scientist for the Department, though official roles such as COR or PCO are not formally designated in the notice. No representations, certifications, socioeconomic status claims, or unique entity identifiers are provided, and the submission process remains undocumented beyond the contact points listed for coordination and compliance communication.

General Info

California Department of Fish and Wildlife authorizes Edison to repair Big Creek Dam outlet valve with modified access site, no environmental impact.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Amendment No. 2 to Notification of Lake or Streambed Alteration EPIMS-FRE-31312-R4

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Hazem GabrProject Manager
Benessa GalvanSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement Notification No. EPIMS-FRE-31312-R4, pursuant to Section 1602 of the Fish and Game Code, to Southern California Edison Company. The Agreement authorizes activities related to the repair and replacement of key components of the low-level outlet valve system at Big Creek Dam No. 1. This Amendment No. 2 changes the location and configuration of the Work Area 4 temporary landing site

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details