Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Huntington Lake Dam No. 1 Low-Level Outlet Valves Replacement Project (Amendment No. 2 to Notification of Lake or Streambed Alteration, No. EPIMSFRE-31312-R4)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Huntington Lake Dam No. 1 Low-Level Outlet Valves Replacement Project involves the repair and replacement of critical components within the low-level outlet valve system at Big Creek Dam No. 1. This specific action, identified as Amendment No. 2 to Notification of Lake or Streambed Alteration No. EPIMS-FRE-31312-R4, was issued by the California Department of Fish and Wildlife to the Southern California Edison Company pursuant to Section 1602 of the Fish and Game Code. The primary purpose of this amendment is to modify the location and configuration of the Work Area 4 temporary landing site. The project is categorized as a maintenance activity for an existing public utility facility with no expansion of use and is considered categorically exempt under California Code of Regulations, title 14, section 15301, Class 1, due to the lack of significant environmental impacts. The work is located in Fresno County, California, specifically on the southwest side of Huntington Lake at Big Creek Dam No. 1. The site is situated approximately three miles northeast of the town of Big Creek and 65 miles northeast of the City of Fresno, identified by geographic coordinates Latitude 37.234194, Longitude -119.212944. While the documentation serves as a regulatory Notice of Exemption rather than a procurement contract, it establishes the legal authorization for the specified site modifications. Detailed project management is overseen by the California Department of Fish and Wildlife, Region 4, with primary contact points including a Senior Environmental Scientist and a Project Manager.

General Info

Southern California Edison modifies a temporary landing site for dam valve replacement repairs.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Hazem GabrProject Manager
Benessa GalvanSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement Notification No. EPIMS-FRE-31312-R4, pursuant to Section 1602 of the Fish and Game Code, to Southern California Edison Company. The Agreement authorizes activities related to the repair and replacement of key components of the low-level outlet valve system at Big Creek Dam No. 1. This Amendment No. 2 changes the location and configuration of the Work Area 4 temporary landing site

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFP - Grappler Wharf Replacement
Solicitation # RFP - GWR10-26
The Alberni-Clayoquot Regional District (ACRD) has issued solicitation RFP-GWR10-26 for the Grappler Wharf Replacement project in Bamfield, British Columbia. The project involves replacing deteriorated floating dock infrastructure used for public access, public moorage, and Fire Service operations. The scope is divided into two primary parts: Component A, focusing on the Park Service Float Replacement, and Component B, covering the Bamfield Fire Rescue Float Replacement and Boathouse Extension. The contractor will be responsible for the removal and disposal of old materials and must maintain the existing footprint and operational function of the facility. Proposals are due by 2:00 pm Pacific Time on November 26, 2026, with an anticipated award date of December 09, 2026. The ACRD will evaluate submissions based on experience, qualifications, references, project understanding, approach, schedule, and social procurement practices. Award decisions will be based on the most advantageous proposal rather than the lowest cost. Successful proponents must provide a proposed construction schedule and milestone dates, as the district prefers completion at the earliest practical opportunity. Key administrative and regulatory requirements include maintaining 5 million dollars in general liability insurance and providing a WorkSafe BC Letter of Good Standing. The contractor must comply with the Navigable Waters Act and the provincial Wildlife Act, specifically regarding the timing of pile driving to protect breeding birds. Upon contract closure, the contractor is required to submit a GHG emission report and a quantifying spreadsheet template. Invoicing must be submitted separately for Component A and Component B. The designated point of contact for this procurement is Charity Hallberg Dodds.
Alberni-Clayoquot Regional District

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Orangegate Park Phase 1 Site Improvements
Solicitation # 2026-MPW-241
The Orangegate Park Phase 1 Site Improvements project, solicitation 2026-MPW-241, is a public works construction contract for the development of a new park in Tacoma, Washington. The scope of work includes the construction of a parking lot, restrooms, covered shelters, a playground, and trails, along with all necessary utilities, infrastructure, and storm drainage systems, including bioretention facilities and a detention pond. The project is estimated between 6 million and 6.7 million dollars, excluding sales tax. The successful contractor must complete all base and alternate bid work within 310 calendar days of the Notice to Proceed, with a final completion and acceptance deadline of 340 calendar days. Liquidated damages for delays are set at 1,700 dollars per day. The contractor is required to maintain close coordination with the Pierce County Parks Natural Lands Team and various authorities having jurisdiction to manage overlapping trail construction and ensure public safety. Because the site is in a community-used area, the contractor must implement effective measures to secure work areas while keeping as much of the park open to the public as possible. Contractual requirements include a 5 percent bid bond, 100 percent performance and payment bonds, and strict adherence to prevailing wage laws, ADA accessibility guidelines, and the Build America, Buy America Act. Award will be granted to the lowest responsive and responsible bidder, with a reciprocal preference applied to nonresident contractors per state law.
Parks and Recreation

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS