Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Maryland was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hydraulic Analysis and Protective System Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 11 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals under solicitation 26-051UM-RFP for a turnkey engineering design and implementation project to modernize the communication network for 55 wastewater lift stations. The project focuses on replacing or integrating Remote Terminal Unit (RTU) hardware and deploying a new cellular-based communication network to ensure seamless connectivity with the City's SCADA system. This initiative is partially funded by a FEMA grant via the Florida Division of Emergency Management, requiring all work to adhere to strict standards for system hardening, operational continuity, and disaster resilience. The project includes the delivery of pre-configured communication assemblies and requires installation by a licensed electrical contractor, with system startup performed by the supplier. The selection process utilizes a points-based evaluation focusing on the logical sequencing of the proposed project schedule, the credentials of the proposer, and a track record of at least three similar projects completed in Florida within the last ten years. Bidders must provide itemized pricing for site-specific materials and project-wide labor. Compliance requirements are extensive, including adherence to the Davis-Bacon Act, Equal Employment Opportunity regulations, the Americans with Disabilities Act, and specific FEMA sub-recipient agreement terms. Proposals are due by 2:00 pm local time on November 19, 2026, and must include a baseline project schedule, a human trafficking affidavit, and certifications regarding foreign country entities. Final acceptance of the work by the City is required before any applicable warranty periods commence.
Utilities Maintenance

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
SLED
Cellular Service Site Assessment and Feasibility Study
Solicitation # 2026-TA-0906
The Town of Nantucket, through its Town Administration, is soliciting proposals for a Cellular Service Site Assessment and Feasibility Study under solicitation number 2026-TA-0906. The project requires licensed professionals to evaluate the physical, structural, and regulatory suitability of the Town's water storage tanks for future telecommunications use. Key deliverables include a comprehensive final report and presentation, as well as a regulatory and permitting assessment identifying necessary approvals from the FCC, Massachusetts DEP, and the Nantucket Historic District Commission. The anticipated period of performance is twelve months, and the selected contractor must provide a detailed work plan and timeline. Proposals must be submitted electronically by November 4, 2026, divided into separate technical and price volumes. To be considered, firms must meet minimum qualifications, including at least three years of full-time experience in similar work and a proven ability to complete projects for comparable or larger municipalities. Evaluation is based on a minimum quality review followed by a comparative ranking of finalists based on project understanding and relevant experience. The Town will negotiate with the highest-ranked finalist whose price falls within the budgeted amount. The contract is governed by the laws of the Commonwealth of Massachusetts and requires the contractor to enter into the Town's standard 30B Form Service Agreement. Mandatory requirements include providing a Tax Compliance Certification, a Certificate of Non-Collusion, and evidence of financial stability. Comprehensive insurance coverage is required, including Commercial General Liability of $1 million per occurrence, a $3 million Umbrella/Excess Liability policy, and Workers' Compensation in accordance with Massachusetts General Laws. Payment terms are set at thirty days following the receipt of a satisfactory invoice.
Town Administration

POSTED

about 13 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This subcontract opportunity involves performing specialized engineering analysis and final design services for Maryland Transportation Authority pier protection projects. The selected subcontractor will work alongside prime contractors to conduct critical hydraulic analysis and scour evaluations to ensure the long-term reliability of bridge pier protection systems. Key responsibilities include the design of physical protective structures and corrosion protection systems utilizing advanced hydraulic and structural modeling software. All work must adhere to AASHTO Vessel Collision Design standards and culminate in the delivery of comprehensive final design plans and detailed analysis reports. To qualify for this engagement, the subcontractor must maintain professional liability insurance in the amount of $10 million. The solicitation is categorized under NAICS code 541330 and is managed by the Maryland Transportation Authority. Interested parties must submit their responses by the deadline of July 30, 2026. This contract is essential for maintaining the structural integrity and safety of maritime-adjacent transportation infrastructure through rigorous technical modeling and engineering precision.

General Info

Engineering analysis and design for Maryland Transportation Authority pier protection projects by July 2026.

Place of Performance

MD, USA

Set-Aside

NONE

Documents

This scope was carved out of BPM054919.

The full solicitation package (17 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bay Bridge Protection Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs specialized engineering analysis and final design for prime contractors on Maryland Transportation Authority (MDTA) pier protection projects. Conducts hydraulic analysis and scour evaluation to ensure reliability of protection systems and bridge piers. Designs physical protective structures and corrosion protection systems using hydraulic and structural modeling software. Requires $10M Professional Liability Insurance and AASHTO Vessel Collision Design standards. Delivers final design plans and analysis reports.

More opportunities from Maryland Transportation Authority

Same awarding agency

New
SLED
SV-00211711 Debt Collection Services for Out of State Tolls and Violations
Solicitation # BPM059513
The Maryland Transportation Authority (MDTA) is soliciting debt collection services for delinquent toll payments and other debts owed by owners of vehicles registered outside of Maryland, including those from other U.S. states, territories, Canada, and Mexico. The selected contractor will manage debt portfolios using multi-channel engagement platforms such as phone, mail, digital communications, and online portals. The contract is structured for an initial three-year term with a unilateral option for a two-year renewal. Award decisions will be based on the most advantageous proposal, with technical factors, specifically offeror experience and capabilities, receiving greater weight than financial factors. Contractual requirements include adherence to Maryland law, PCI DSS or SOC security standards, and the NIST cybersecurity framework. The contractor must remit collections to the MDTA via daily ACH deposits and provide monthly invoicing for commission fees, along with required reporting by the fifth business day of each month. Proposals must be submitted in two volumes, with the financial proposal requested only from qualified offerors after technical evaluations. Key administrative requirements include the provision of performance and payment bonds, compliance with Maryland Living Wage requirements, and the submission of a corporate diversity addendum.

POSTED

about 14 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
COMPREHENSIVE ITS, ELECTRICAL AND TRAFFIC ENGINEERING SERVICES
Solicitation # BPM058330
The Maryland Transportation Authority is soliciting professional engineering services for comprehensive Intelligent Transportation Systems (ITS), Electrical, and Traffic Engineering. The scope of work includes the design, retrofit, and upgrade of electrical distribution systems, power backup, grounding, and lighting, as well as integration and testing for ITS components such as fiber optic communications, advanced traffic management systems, dynamic message signs, CCTV, and EV charging infrastructure. All services must adhere to FHWA, MDTA, SHA, AASHTO, and NEC standards. The agency intends to award up to five contracts over a five-year term, with an aggregate total value not to exceed 25 million dollars. Technical proposals are evaluated based on oral presentations of sample assignments, work plans, key personnel, and example projects, with financial responsibility and subcontractor commitments serving as pass/fail criteria. Key personnel, excluding the Systems and Environmental Engineers, must be registered Professional Engineers in Maryland. The Systems Engineer must be a direct employee of the prime firm with at least ten years of experience and a relevant bachelor's degree. The procurement includes specific socioeconomic goals, requiring 23 percent Minority Business Enterprise (MBE) and 1 percent Veteran-owned Small Business Enterprise (VSBE) participation. Technical proposals must be submitted in hardcopy format by October 29, 2026.
Engineering Services

POSTED

5 days ago

DEADLINE

in 1 day
View Details
NAICS: 237310
SLED
Bay Bridge Protection Project
Solicitation # BPM054919
The Bay Bridge Protection Project, solicitation BPM054919, is a design-build contract issued by the Maryland Transportation Authority to install protection structures for the four towers supporting the main navigation spans of the Eastbound and Westbound Bay Bridges. This marine construction project involves the use of floating plants, barge-mounted cranes, and pile driving equipment to ensure the safety and durability of the bridge piers while minimizing impacts on maritime traffic entering and exiting the Port of Baltimore. The project has a goal duration of 915 calendar days or less and a not-to-exceed contract value of 175 million dollars. Procurement is conducted via Competitive Sealed Proposals, with award based on a trade-off analysis where technical and financial proposals are given equal relative importance. Key technical evaluation factors include the capability of the proposer, design approach, construction approach, and commitment to meeting Minority Business Enterprise (MBE) and Veteran Small Business Enterprise (VSBE) goals, which are set at 12 percent and 1 percent, respectively. The project is governed by the MDOT SHA 2025 Standard Specifications for Construction and Materials, and it requires a comprehensive Quality Management Plan. The procurement process involves a multi-stage submission including a prequalification volume, a technical proposal, and a sealed financial proposal. Key deadlines include prequalification submissions due October 23, 2026, and final technical and financial proposals due February 23, 2027. Notable contractual requirements include the provision of performance and payment bonds, adherence to prevailing wage instructions, and a prohibition on the use of helpers or trainees. While a Project Labor Agreement was previously mandatory, it is no longer required, though a voluntary option remains available.
Highway, Street, and Bridge Construction

POSTED

23 days ago

DEADLINE

in 4 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS