Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bay Bridge Protection Project

Closed
BPM054919State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Bay Bridge Protection Project, solicitation BPM054919, is a design-build contract issued by the Maryland Transportation Authority to install protection structures for the four towers supporting the main navigation spans of the Eastbound and Westbound Bay Bridges. This marine construction project involves the use of floating plants, barge-mounted cranes, and pile driving equipment to ensure the safety and durability of the bridge piers while minimizing impacts on maritime traffic entering and exiting the Port of Baltimore. The project has a goal duration of 915 calendar days or less and a not-to-exceed contract value of 175 million dollars. Procurement is conducted via Competitive Sealed Proposals, with award based on a trade-off analysis where technical and financial proposals are given equal relative importance. Key technical evaluation factors include the capability of the proposer, design approach, construction approach, and commitment to meeting Minority Business Enterprise (MBE) and Veteran Small Business Enterprise (VSBE) goals, which are set at 12 percent and 1 percent, respectively. The project is governed by the MDOT SHA 2025 Standard Specifications for Construction and Materials, and it requires a comprehensive Quality Management Plan. The procurement process involves a multi-stage submission including a prequalification volume, a technical proposal, and a sealed financial proposal. Key deadlines include prequalification submissions due October 23, 2026, and final technical and financial proposals due February 23, 2027. Notable contractual requirements include the provision of performance and payment bonds, adherence to prevailing wage instructions, and a prohibition on the use of helpers or trainees. While a Project Labor Agreement was previously mandatory, it is no longer required, though a voluntary option remains available.

General Info

Maryland Transportation Authority design-build bridge protection project, 175 million dollars, 915 calendar days.

Documents

17

Addendum No. 1 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 2 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 3 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 4 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 5 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 6 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Addendum No. 7 for Contract BB-3023-0000 Bay Bridge Protection Design-Build Project

PDF, High priority: read this firstamendment
High

Bay Bridge Protection Design-Build Project - Part III Prescriptive Technical Specifications

PDF, High priority: read this firstspecifications
High

Bay Bridge Protection Design-Build Project - Part IV Attachments

PDF, High priority: read this firstrfp
High

Bay Bridge Protection Design-Build Project RFP Part I

PDF, High priority: read this firstrfp
High

Bay Bridge Protection Design-Build Project - RFP Part II Performance Specifications

PDF, High priority: read this firstspecifications
High

BB-3023-0000 Bay Bridge Protection Design-Build Project Addendum No. 10

PDF, High priority: read this firstamendment
High

BB-3023-0000 Bay Bridge Protection Design-Build Project - Addendum No. 11

PDF, High priority: read this firstamendment
High

BB-3023-0000 Bay Bridge Protection Project MBE-VSBE-SBR Research Factors

DOCX, High priority: read this firstmbes-vsbes-sbr-research
High

Contract No. BB-3023-0000 Bay Bridge Protection Design-Build Project - Addendum No. 8

PDF, High priority: read this firstamendment
High

Contract No. BB-3023-0000 Bay Bridge Protection Design-Build Project - Addendum No. 9

PDF, High priority: read this firstamendment
High

BB 3023-0000 RFP Part V Reference Information

PDF, Low priorityreference-information
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 30, 2026 to Oct 23, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland Transportation Authority
Contacts1 person available
OfficeMD, USA
Office AddressMD, USA
Contacts
Jullian JOHNSProcurement Officer / Buyer

Full Description

Show more
MDTA has developed a plan to install protection to the piers closest to the main navigation spans that accommodate inbound and outbound vessel traffic. The initial Project scope includes the installation of structures to protect the four towers supporting the main spans of the Eastbound and Westbound Bay Bridges. The project development utilizes the design-build contracting method and the “Competitive Sealed Proposals” procurement method. The Project may result in having a scope in the final design containing a different type, size, and number of protection based on the proposals received.
Category: Marine construction services
Additional Instructions: The purpose of this new round is to upload Addendum No. 11
Procurement Goals: MBE: 12.00, VSBE: 1.0

More opportunities from Maryland Transportation Authority

Same awarding agency

NAICS: 541330
New
SLED
COMPREHENSIVE ITS, ELECTRICAL AND TRAFFIC ENGINEERING SERVICES
Solicitation # BPM058330
The Maryland Transportation Authority is soliciting professional engineering services for comprehensive Intelligent Transportation Systems (ITS), Electrical, and Traffic Engineering. The scope of work includes the design, retrofit, and upgrade of electrical distribution systems, power backup, grounding, and lighting, as well as integration and testing for ITS components such as fiber optic communications, advanced traffic management systems, dynamic message signs, CCTV, and EV charging infrastructure. All services must adhere to FHWA, MDTA, SHA, AASHTO, and NEC standards. The agency intends to award up to five contracts over a five-year term, with an aggregate total value not to exceed 25 million dollars. Technical proposals are evaluated based on oral presentations of sample assignments, work plans, key personnel, and example projects, with financial responsibility and subcontractor commitments serving as pass/fail criteria. Key personnel, excluding the Systems and Environmental Engineers, must be registered Professional Engineers in Maryland. The Systems Engineer must be a direct employee of the prime firm with at least ten years of experience and a relevant bachelor's degree. The procurement includes specific socioeconomic goals, requiring 23 percent Minority Business Enterprise (MBE) and 1 percent Veteran-owned Small Business Enterprise (VSBE) participation. Technical proposals must be submitted in hardcopy format by October 29, 2026.
Engineering Services

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS