Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Hydraulic Dredging and Beach Fill Placement

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves hydraulic dredging and beach fill placement for US Army Corps of Engineers shoreline protection projects managed by the Department of Defense, specifically the W074 Endist Savannah. The scope of work requires the excavation of sand from borrow areas to a depth of 16 feet MLLW and the transport of material through submerged and floating pipelines to install fill along 13,500 feet of beach at Tybee Island. The contractor must utilize a cutterhead pipeline dredge equipped with GPS positioning to ensure precise delivery of the completed beach berm fill. All operations must strictly adhere to the 2020 SARBO and Clean Water Act standards. The solicitation was posted on November 10, 2026, with a response deadline of December 10, 2026, under NAICS code 237990.

General Info

Hydraulic dredging and beach fill placement for Tybee Island shoreline protection projects.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Tybee Island, GA, USA

Set-Aside

NONE

Documents

This scope was carved out of W912HN27BA001.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tybee Island Shoreline Protection Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs hydraulic dredging and beach fill placement for prime contractors on US Army Corps of Engineers shoreline protection projects. Excavates sand from borrow areas to -16 feet MLLW, transports material via submerged and floating pipelines, and installs fill along 13,500 feet of beach. Requires cutterhead pipeline dredge and GPS positioning. Adheres to 2020 SARBO and Clean Water Act standards. Delivers completed beach berm fill.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Isle of Wight County, Virginia, is soliciting bids for the Phase 1 construction of Henry H. Bradby Park, located on a 51.67-acre parcel in Smithfield. The project scope involves approximately 6.63 acres of land disturbance and includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management. Key deliverables include the construction of public amenities such as parking facilities, walking trails, a playground, a shelter, and recreational courts, as well as final landscaping and site furnishings. The contract is a firm-fixed-price award to the lowest responsive and responsible bidder, with a required substantial completion timeline of 300 days from the notice to proceed and final completion due 45 days thereafter. Because the project is funded through the National Park Service's Land and Water Conservation Fund, it is subject to strict federal oversight. This includes mandatory compliance with the Build America, Buy America Act for material sourcing, as well as adherence to federal civil rights laws and environmental windows for endangered species. Bidders must provide bid, performance, and payment bonds, with bid bonds required for projects exceeding 500,000 dollars. All work must comply with the 2018 Virginia Statewide Building Code and specific approvals from the Virginia Department of Transportation and the Department of Environmental Quality. Bids are due by November 16, 2026, and must be submitted via the designated procurement portal.
Parks & Recreation

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
IFB No 134548 Billeting Retaining Walls, Drainage and Soil Stabilization
Solicitation # 134548
The California Military Department is soliciting bids for IFB No. 134548 to install a temporary K-rail retaining wall, drainage, and soil stabilization system at Camp San Luis Obispo. The scope of work includes the installation of 480 total feet of retaining walls using 24 precast concrete units, the installation of six grated inlets and six 6-inch-diameter solid outlet pipe routes, and the application of soil stabilizer to create hardened sections between buildings and walls. The project requires a prime contractor holding a California CSLB Class A General Engineering or Class C-12 Earthwork and Paving license. All work must adhere to California public works labor requirements, San Luis Obispo County prevailing wages, and Cal OSHA safety standards. Bidders must attend a mandatory pre-bid job walk on November 17, 2026, and submit all questions by November 20, 2026. Bids are due by November 30, 2026, at 2:00 PM, with the bid opening following at 2:15 PM. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% preference for certified Small Business or Microbusiness enterprises and a 5% goal for Disabled Veteran Business Enterprise participation. Required documentation includes a bid bond, a completed rate sheet, and various certifications including non-collusion and civil rights compliance. Performance and payment bonds are required if the contract exceeds specific monetary thresholds.
California Military Department

POSTED

about 17 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Freedom Park Boardwalk Repairs - Boardwalks 1 & 2
Solicitation # 26-8700
Solicitation 26-8700 is an invitation to bid issued by the Collier County Procurement Services Division for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in East Naples, Florida. The project has an anticipated budget of 1,300,000 USD and involves replacing deteriorated decking with IPE wood or equivalent, replacing damaged structural supporting timber, fasteners, and hardware, and repairing or installing new pilings and support beams. Technical requirements include the use of 5500 psi Type IV Portland Cement for concrete repairs and adherence to FDOT and ASCE standards. Contractors must also comply with Florida Statute 255.20 by prioritizing lumber and timber produced within the state and must follow strict environmental health and safety requirements, including the use of floating turbidity barriers to protect the surrounding environment. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and selected alternates. Bidders are required to submit a 5% bid bond and, upon award, must provide performance and payment bonds for 100% of the contract amount. The project timeline mandates commencement within five calendar days of the start date, with a total completion window of 134 calendar days. A specific Owner's Allowance of 198,120 USD is allocated for unforeseen conditions. Submissions must be made electronically via the OpenGov portal by November 13, 2026, at 3:00 PM, and must include all required bid forms, certifications for E-Verify and immigration law compliance, and a detailed bid schedule.
Procurement

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
2026-012-247A Meramec Greenway: Unger County Park Tail Realignment
Solicitation # 247A
Great Rivers Greenway is soliciting electronic bids via Bid Express for the Meramec Greenway: Unger Park Realignment project in St. Louis County and Fenton, Missouri. The scope of work includes the realignment of the Meramec Greenway within Unger Park and a trail extension to the terminus at Soccer Park Road and Yarnell Road. Key project components include the construction of a new trailhead with a parking lot, modifications to the Unger Park Disc Golf Course, the creation of two lookouts above the Meramec River, and the installation of landscaping, site amenities, and wayfinding signage compliant with 2023 MUTCD and 2010 ADA standards. All work must be executed according to California Department of Transportation standards and regulations, with specific requirements for plant quality and earthwork density testing. Bids are due by December 15, 2026, and must include a complete Equipment Hourly Rates Schedule and a 5% bid security. The contract will be awarded to the apparent low bidder, provided they are deemed responsible and qualified, with the requirement to submit an AIA Form A305 qualification statement within two business days of a request. The successful contractor must comply with Missouri prevailing wage laws, provide performance and payment bonds via AIA Document A312, and adhere to a detailed work schedule with monthly electronic updates. Administrative requirements include a structured payment process where the Developer's Representative issues a Certificate for Payment within seven days of receiving an application. Additionally, contractors must comply with the Anti-discrimination Against Israel Act and USACE permit conditions.
Great Rivers Greenway

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
RFB No. 27-0017 Carver Lake Park - Phase 1
Solicitation # 27-0017
The Columbus Consolidated Government is soliciting bids for the Carver Lake Park Phase 1 project in Columbus, Georgia. The scope of work involves comprehensive site improvements, including demolition, clearing, grubbing, earthwork, and grading. Key deliverables include the construction of access drives, parking areas with permeable pavers, concrete sidewalks, curb and gutter, and a 10-foot-wide multi-use trail. The project also encompasses the development of playground and pavilion areas, improvements to the existing splash pad, fencing, site signage, landscaping, and associated storm drainage and utility improvements. The contract will be awarded to the responsive and responsible bidder submitting the lowest base bid. Qualified bidders must be licensed contractors in the State of Georgia, maintain a permanent place of business, and demonstrate sufficient financial resources and construction experience. The project requires substantial completion within 550 consecutive calendar days, with final payment readiness by 580 days. Successful bidders must provide performance and payment bonds totaling 100 percent of the contract amount. The project mandates strict adherence to various federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and the Anti-Kickback Act, while emphasizing a preference for qualified local labor and businesses.
Columbus Consolidated Government

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 237990
New
Federal
Tybee Island Shoreline Protection Project
Solicitation # W912HN27BA001
The Tybee Island Shoreline Protection Project, solicitation W912HN27BA001, is an unrestricted full and open competitive acquisition issued by the Department of Defense, W074 Endist Savannah. This project involves the placement of dredged material along approximately 13,500 feet of the Front Beach at Tybee Island, Georgia. The contract is structured as a single Firm Fixed Price award based on a sealed bidding process, with a construction magnitude estimated between $10,000,000 and $25,000,000. The scope includes a base bid for placing berm fill material along 7,000 feet of the construction baseline and four optional bid items for additional fill and beach tilling. Construction is restricted to the window between November 1, 2026, and April 30, 2027, with a total performance period of 90 calendar days from the Notice to Proceed. The project requires strict adherence to technical specifications, including the use of an automated Quality Control System and compliance with the Federal Clean Water Act and Georgia state water quality standards. Acceptance and final payment are determined by contractor-performed before and after surveys using specific NAD83 and MLLW coordinate systems. Bidders must provide a bid guarantee of 20 percent of the bid price or $3 million, whichever is less, and the successful awardee must furnish performance and payment bonds. Labor is subject to the Davis-Bacon Act under wage determination GA20260286 for Chatham County. Submissions must be made in Adobe PDF format via PIEE by December 10, 2026, and must include a completed Standard Form 1442 and detailed unit pricing.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 237990
New
Federal
13A Dredge Material Containment Area (DMCA) Dike Raising and Weir Improvements
Solicitation # W912HN27S5001
The U.S. Army Corps of Engineers, Savannah District, is conducting market research through a Sources Sought notice to identify capable parties for the 13A Dredge Material Containment Area (DMCA) Dike Raising and Weir Improvements project. Located in Jasper County, South Carolina, the project aims to increase the capacity of DMCA 13A to safely contain maintenance dredging materials from the Savannah River. The scope of work involves raising the perimeter back dike, the 13A/13B cross dike, the 13A/12A cross dike, and the front dike to specific crest elevations using fill material sourced from the interior of the containment area. Additionally, the project requires repairs and modifications to four of the six existing weir water control structures, including the replacement of corroded steel, installation of new bonneted knife gate valves, and the construction of new slab foundations and larger weir platforms. The required performance period is 540 days from the Notice to Proceed. Technical requirements include the use of GPS-enabled earthwork equipment and Low Ground Pressure (LGP) or aquatic equipment to operate on soft foundations and pumped materials. Contractors must demonstrate experience with weir demolition, HDPE piping installation, topographic surveying, and compliance with South Carolina sediment and erosion control regulations. This procurement is classified under NAICS code 237990 for Dredging and Surface Clean Up Activities, with a size standard of 37 million dollars and Product Service Code Z1KF. Interested firms must provide company details, business size certifications, and bonding capabilities to the government for evaluation.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS