Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

I-5 Ramp Pavement Rehab on Southbound I-5 Aliso Creek Rest Area Onramp

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 11 in San Diego proposes pavement rehabilitation on the southbound I-5 Aliso Creek Rest Area Onramp at postmile R59.8, involving the removal of 0.2 feet of existing asphalt and replacement with 0.2 feet of Rubberized Hot Mix Asphalt (RHMA) to enhance traffic safety. All work is confined within the existing ramp pavement and Caltrans right-of-way, with no alterations to vegetation, slopes, or drainage systems. The scope includes grinding, tack coating, RHMA paving, fog sealing, dike installation, striping, pavement marker placement, and temporary traffic control implemented in accordance with the 2024 Caltrans Standard Plans and Specifications. Temporary staging for up to four days may occur within the rest area using Best Management Practices such as plastic tarps, with equipment placed only on designated paved surfaces. The project qualifies as a categorical exclusion under federal NEPA regulations (23 CFR 771.117(c) and (d)) and state CEQA Class 1 exemption, supported by an Environmental Commitments Record that ensures compliance with environmental protections. Inspection and acceptance will occur at the project site by Caltrans personnel, with quality standards mandated by Caltrans specifications. No formal contract value, pricing structure, or solicitation number is provided, indicating this is an anticipated project forecast rather than an active solicitation. Administrative and environmental oversight is managed by Caltrans District 11, with Emery McCaffery, Associate Environmental Planner, as the primary point of contact. The project adheres strictly to standard Caltrans procedures, with no additional special contractual requirements, security clearances, or socioeconomic provisions identified, reflecting its classification as a routine, low-impact infrastructure maintenance activity.

General Info

Caltrans to rehab I-5 Aliso Creek onramp with RHMA, no environmental impacts, routine maintenance under categorical exclusion.

Agency

California → Caltrans, District 11 - San Diego

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

3A945 Notice of Exemption for I-5 Ramp Pavement Rehab

PDFnotice-of-exemption

3A945 CEQA Exemption and NEPA Categorical Exclusion Determination Form

PDFcategorical-exclusion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 11 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 11 - San Diego
Office AddressN/A
Contacts
Emery McCafferyAssociate Environmental Planner

Full Description

Show more
Caltrans proposes ramp pavement rehabilitation by removing 0.2 feet of existing asphalt and replacing it with 0.2 feet of Rubberized Hot Mix Asphalt (RHMA) on the southbound I-5 Aliso Creek Rest Area Onramp at postmile R59.8 in San Diego County. Ramp pavement rehabilitation is necessary to improve traffic safety on this damaged onramp. All work will be performed within the existing ramp pavement and within Caltrans right-of-way. Temporary staging for a maximum of four days may occur in the rest area using Best Management Practices (BMPs) such as plastic tarps. There is a paved service area within the rest area where equipment may be staged if necessary. Work will include grinding of existing pavement, tack coating, paving with RHMA, fog seal, dike installation, striping, installation of pavement markers, and temporary traffic control according to 2024 Standard Plans and Standard Specifications. No alteration of vegetation, slope, or drainage systems is anticipated to occur because of the ramp pavement rehabilitation.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details