I-680 Alameda Creek Bridge Scour Repair Project (EA 04-0P910)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The I-680 Alameda Creek Bridge Scour Repair Project, managed by the California Department of Transportation (Caltrans) District 4, focuses on critical infrastructure repairs at Bridge 33 0047 in Alameda County. The primary objective is to mitigate scour damage on the leading edges of Piers 8 and 9, which was caused by restricted flows from a nearby mining operation. This work involves excavating a scour hole approximately 40 feet wide and up to five feet deep and placing shot rock slope protection around the upstream edges of Piers 7, 8, and 9 to ensure bridge stability. Additionally, the project includes bridge deck rehabilitation, which consists of cold planning and removing 1.5 inches of polymer concrete, replacing expansion joint seals, and installing three-quarter inches of polyester concrete using slip forming paving machines. All removed asphalt and concrete will be disposed of at approved off-site facilities. The project is governed by several regulatory frameworks, including Lake and Streambed Alteration Agreement EPIMS-ALA-54540-R3 under Fish and Game Code section 1602 and California Endangered Species Act Incidental Take Permit 2081-2024-072-03. These permits address environmental impacts, specifically the incidental take of the California tiger salamander. The California Department of Fish and Wildlife has issued Notices of Determination confirming that the project will not have a significant environmental effect within its jurisdiction, provided that the adopted mitigation measures and monitoring plans are followed. The project is located on Interstate 680 at PM R10.15 in an unincorporated area of Sunol, and the lead agency contact is Julian Smith of Caltrans.

General Info

Caltrans will repair bridge scour and rehabilitate the deck on I-680 in Sunol.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

EPIMS-ALA-54540-R3 Notice of Determination for Alameda Creek Bridge Scour Mitigation Project

PDFnotice-of-determination

Notice of Determination for I-680 Alameda Creek Bridge Scour Mitigation Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Karen TaylorSenior Environmental Scientist (Specialist)
Julian SmithLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-ALA-54540-R3), pursuant to Fish and Game Code section 1602, the project Applicant, California Department of Transportation. The Project will repair scour on the leading edges of Piers 8 and 9 due to restricted flows from the surrounding mining operation. The eroded area, around and between Pier 8 and 9, is approximately 40 feet wide, up to five feet deep, and 27 feet long; depth varies according to silt deposition from winter storms. However, silt is not adequately stable to maintain bridge stability. Excavation and placement of the shot rock (rock slope protection (RSP)) will be needed in the scour hole and around the upstream edges of Piers 7, 8 and 9. The Project will also rehabilitate the bridge deck by cold planning and removing 1.5 inches of polymer concrete of the bridge deck in both directions. The expansion joints will be cleaned, and the seals replaced. Slip forming paving machines will lay out threequarter inches of polyester concrete on the bridge deck. The maximum depth of ground disturbance below the existing pavement will not exceed two inches. Median barriers on the approach slabs will be removed and replaced. All removed asphalt and concrete will be taken off-site and disposed of in an approved facility.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS