Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Install trash capture devices, construct maintenance vehicle pullouts

Active
04-0W0604State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans) is soliciting proposals under solicitation number 04-0W0604 for the installation of trash capture devices and the construction of maintenance vehicle pullouts across the state of California. The solicitation was posted on July 27, 2026, with a response deadline of September 1, 2026, and is classified under NAICS code 237310 for heavy and civil engineering construction. All work must be performed within California and is governed by Caltrans-specific Standard Specifications and Special Provisions rather than standard FAR clauses. Key deliverables include the removal of culverts in linear feet, placement of Class 2 aggregate base, application of prime coat and hot mix asphalt, street sweeping, and mobilization efforts. The contract includes detailed technical requirements for materials, including concrete with a compressive strength of 3.6 KSI and reinforcing steel at 60.0 KSI, all aligned with AASHTO LRFD design standards. Environmental compliance is strictly enforced, mandating Environmental Product Declarations for asphalt over 2,250 tons and concrete over 250 cubic yards, registered via DIME, with a $6,000 penalty for noncompliance. Off-road diesel equipment must meet Tier 4 Interim or Final emissions standards, and a complete inventory of such equipment must be submitted 15 days prior to use. Contractors must appoint a qualified Safety Representative with Cal/OSHA 30-hour or OSHA 510 certification and submit a Site-Specific Safety Program for approval. Payroll records must be submitted electronically via LCPtracker Pro, and compliance with Buy America and DVBE subcontracting requirements is mandatory, with DVBE quotes required and penalties applied for noncompliance. Traffic coordination with four other active Caltrans contracts is required even if not physically adjacent, and work is prohibited from encroaching on railroad property. Inspection and acceptance criteria are site-based, requiring ISO/IEC 17025-accredited labs to conduct contaminant testing, including pH above 5.0, soluble lead under 5 mg/L, and total lead under 80 mg/kg, with results analyzed using ProUCL at a 95% upper confidence limit and a chain of custody maintained. No contract value is provided due to missing pricing data, and while invoicing must go through Caltrans’s prompt payment monitoring system, no remittance details or payment office information are

General Info

California DOT seeks contractors to install trash capture devices and maintenance pullouts statewide by September 1, 2026.

Agency

California Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(6)

California DOT Contract 04-0W0604 Bid Forms for Highway Construction

PDFbid-forms

Soil Investigation Report Excerpt for Contract 04-0W0604

PDFsoil-investigation-report

California NH-000C(577) Construction Plans

PDFplans

Contract 04-0W0604 Special Provisions and Notice to Bidders for Santa Clara County Highway Construction

PDFspecial-provisions

04-0W0604supplemental_info.zip

ZIP

California Construction Wage Determination CA20260018 07/14/2026

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install trash capture devices, construct maintenance vehicle pullouts

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
Y--SC Multi Parks (CONG, COWP, KIMO, NISI) - Pavement
Solicitation # 140P2026R0054
The Department of the Interior, through its Dsc Contracting Services Division, is conducting market research for a forthcoming pavement preservation contract targeting four national park sites in South Carolina: Congeree National Park, Cowpens National Battlefield, Kings Mountain National Military Park, and Ninety Six National Historic Site. This effort, identified by solicitation number 140P2026R0054 and classified under NAICS code 237310, is currently a Sources Sought Notice (SSN) intended to gather industry input to determine the viability of a small business or socio-economic set-aside, not to solicit bids. The work involves pavement preservation activities across approximately 11.48 roadway miles and 0.71 parking miles, with the goal of extending pavement life while minimizing disruption to public access. The anticipated contract will be awarded as a Firm-Fixed-Price (FFP) agreement, with a projected performance period of 132 calendar days following the Notice to Proceed, including allowances for weather-related delays. Construction must remain compatible with park operations, with critical constraints prohibiting any work in Congeree during the Synchronized Firefly Festival (mid-May to early-June) and between October 15–18, and requiring all construction at Kings Mountain to end before October 1. All roads and parking areas must remain fully accessible during the week of July 4th at every site, and winter construction may also be required. Limited staging areas are available adjacent to or within the project zones, requiring pre-approval from the Contracting Officer’s Representative. The government anticipates issuing a competitive Request for Proposals in fall 2026, and the contract will require Bid, Performance, and Payment Bonds, along with applicable insurance coverage. Contractors must also comply with state and local permitting and licensing requirements. Interested parties are requested to submit company information, including UEI, point of contact, and SBA certifications such as EDWOSB, HUBZone, SDVOSB, WOSB, and Native American-owned designations to assist in determining potential set-aside eligibility.
Dsc Contracting Services Division

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
Federal
Whiteman AFB - FY27 Airfield Pavement
Solicitation # FA462526Q1062
This contract solicitation, identified as FA462526Q1062, is a combined synopsis and solicitation for commercial construction services under FAR Subpart 12.6, structured as a Small Business Set-Aside with a total set-aside designation. It seeks qualified small businesses to perform maintenance, repair, and minor construction of airfield pavements at Whiteman Air Force Base in Missouri, with work executed through task orders under an indefinite-quantity arrangement. The scope includes asphalt and concrete crack sealing, subgrade stabilization, and related pavement work governed by Unified Facilities Criteria and specific UFGS specifications, requiring strict adherence to technical standards, quality control, and Government inspection at the project site. All offers must be submitted electronically by August 26, 2026, in two volumes: a two-page price proposal excluding the bid schedule and a five-page past performance submission detailing up to three relevant projects within the last five years. The Government will evaluate proposals primarily on past performance, which is significantly more important than price, and award based on best value through a trade-off process rather than as a lowest price technically acceptable (LPTA) contract. The contract incorporates numerous FAR and DFARS clauses to ensure compliance with federal procurement regulations, labor standards, cybersecurity, and environmental requirements. Key clauses include mandatory compliance with the Davis-Bacon Act through wage rate provisions, Buy America Act restrictions on materials, and CMMC Level 1 cybersecurity standards for safeguarding controlled unclassified information. Contractors must also adhere to whistleblower protections, anti-kickback procedures, and restrictions on foreign influence and procurement from sanctioned regions. Subcontracting is limited under small business set-aside rules, with flow-down requirements for cybersecurity and labor standards. Performance is governed by strict operational parameters including base access protocols, work hours from 0630 to 1730 Monday through Friday, and mandatory security clearances for personnel. Payment is processed exclusively through Wide Area WorkFlow (WAWF), and all deliverables must be completed and accepted on-site by Government representatives. The contract includes options for extension and provisions for changes, termination for convenience, and disputes, with deviations applied to standard clauses to accommodate specific mission needs. No extension of the submission deadline is permitted, and all attachments have been updated as of August 4, 2026, to reflect current requirements.
FA4625 509 Cons Cc

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Sacramento County In Sacramento From 0.1 Mile North Of Fulton Avenue Overcrossing To Auburn Boulevard On-Ramp Overcrossing
Solicitation # 03-0N4504
The contract pertains to construction on State Highway 51 in Sacramento County, California, specifically between 0.1 mile north of the Fulton Avenue overcrossing and the Auburn Boulevard on-ramp overcrossing, designated as Contract No. 03-0N4504 and Project ID 0324000117. The work is governed by the California Department of Transportation’s 2025 Standard Specifications, modified by special provisions that introduce project-specific requirements, including compliance with geotechnical design reports, encroachment permits, and aerially deposited lead data. The project involves the installation of specialized infrastructure such as crash cushions, thermoplastic traffic stripe with enhanced night visibility, and concrete barriers per California-specific standard plan sheets, all to be fabricated and installed according to stringent material and quality standards including ASTM A123, AASHTO hardware specifications, and RWQCB basin plan compliance. Bids must be submitted electronically via Bid Express by 2:00 p.m. on September 9, 2026, and must be accompanied by bid security equal to at least 10 percent of the bid amount. The contract requires payment on a cost-plus-time basis, with strict adherence to prevailing wage laws determined by the California Department of Industrial Relations, and mandates that contractors pay subcontractors within seven days of receiving progress payments. All iron, steel, and manufactured products must originate from U.S. facilities, with specific requirements for non-ferrous metals, plastics, glass, lumber, and fiber optic materials under federal Buy America and 2 CFR standards. The contractor must start work within 180 days of contract approval, coordinate lane closures and traffic control with adjacent projects including 03-0J6204, 03-3J8604, 03-4J6904, and 03-0N7304, and submit electronic and hard-copy documentation including alignment profiles, digital terrain models, cross sections, and material reports. Quality assurance personnel must hold ACI Concrete Field-Testing Technician, Grade 1 certification, and temporary concrete barriers must be sourced from precast plants on Caltrans’ Authorized Facility Audit List. Certified payroll records must be managed through LCPtracker Pro, and payment information submitted through Caltrans’ prompt payment monitoring system. Environmental compliance includes submitting product stage environmental product declarations for hot mix asphalt and concrete, and all work must comply with the California Department of Transportation’s
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details