Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interstate 215 At Palm Avenue Interchange Project

Closed
20260702025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 10 hours ago

DEADLINE

in 8 days

General Info

Agency

California → San Bernardino County Transportation AuthorityView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

San Bernardino, CA, 92407, USA

Set-Aside

NONE

Documents

(1)

RFP26-1003456-I-215-at-Palm-Avenue-Interchange-Project_Final.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino County Transportation Authority
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #26-1003456: The San Bernardino County Transportation Authority (SBCTA) is soliciting proposals from qualified firms to provide professional services for the preparation of plans, studies, and reports to support the Project Initiation Document (PID) and Project Approval and Environmental Document (PA/ED) phases for the Interstate 215 at Palm Avenue Interchange Project in the City of San Bernardino. The proposed improvements include reconfiguring the existing interchange, which may require widening or replacement of the Palm Avenue Undercrossing bridge structures. The project aims to accommodate current and future traffic demands, relieve congestion, improve access for pedestrians and non-motorized users, and enhance freight mobility. The selected consultant will perform project management, engineering studies (traffic, geotechnical, drainage), environmental analysis (CEQA/NEPA), alternatives development, public outreach support, and preparation of all required documentation for Caltrans approval.