Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Irrigation Well and Steel Casing Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel tanks at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project requires a contractor to provide all labor, materials, and equipment to remove and dispose of one 600 gallon fuel tank, a catch basin containing approximately 300 gallons of fuel, a 10 gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275 gallon insulated double walled fuel tanks, a new 10 gallon day tank, grounding systems, a fuel transfer pump, vent pipes, fill whistle, crossover manifold kit, fill caps, fuel level gauges, a tie down kit, and new fuel supply return lines. The work must be completed within a 120 day period of performance and adhere to all local, state, and federal laws. This procurement is a total small business set aside under NAICS code 237120, with a construction magnitude of less than 25,000 dollars. The contract is a firm fixed price agreement. To be considered responsive, all vendors must maintain an active registration in SAM.gov at the time of submission. The solicitation process includes a requirement for a detailed solicitation survey regarding vendor qualifications and a comprehensive safety and accident prevention plan. The deadline for responses is September 15, 2026, at 5:00 PM Eastern.
W2SD Endist New England

POSTED

2 days ago

DEADLINE

in 3 days
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, managed by the USACE Japan Engineer District, is for the Bulk Fuel Storage Tanks Phase II project at Yokota Air Base, Japan. The scope of work involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank, a reinforced concrete pump house containing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump, and an access tunnel. The project includes the installation of a product saver tank, an automatic tank gauging system, and the necessary piping and control systems to integrate the new facility with the existing filter separator building. The estimated magnitude of the project is between 7.5 and 15 billion Yen, with a period of performance of 1,020 calendar days following the Notice to Proceed. The contract will be awarded using the Lowest Price Technically Acceptable (LPTA) process. To be eligible, offerors must be rated as acceptable across three evaluation factors: construction experience, which requires at least one prime contract for a fuel facility valued at 1 billion JPY or 10 million USD within the last 20 years; system supplier subcontractor experience, requiring five projects completed within the last five years; and satisfactory past performance. Proposals are due by January 25, 2027. Key contractual requirements include adherence to EM 385-1-1 safety procedures, the implementation of a Three Phase Inspection process, and liquidated damages of 615,000 Yen per calendar day of delay. The project carries a priority rating of DO-C2.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 4 months

AI Contract Overview

Show more

The contract pertains to the drilling and installation of irrigation wells with steel casing pipes, encompassing all related activities such as site preparation, insertion of casing, and pressure testing to ensure structural integrity and operational readiness. The work is classified under NAICS code 237120, indicating it falls under the utility system construction category, specifically for irrigation systems. Performance of the work is expected to occur within Cameron County, Texas, though exact location details are not specified. The contract is structured as a subcontract, with no set-aside provisions identified, and the solicitation was posted on May 4, 2026, with a firm deadline for responses set for May 27, 2026. All technical and procedural requirements must comply with industry standards for well construction and pressure testing to meet agricultural irrigation needs.

General Info

Drilling and installing irrigation wells with steel casings, including site prep and pressure testing.

Agency

Texas → CAMERON COUNTY

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 260402.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OLD ALICE ROAD – PROJECT (CSJ: 0921-06-290, etc.)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → CAMERON COUNTY
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → CAMERON COUNTY
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Drilling and installation of irrigation wells with steel casing pipes, including site preparation, insertion, and pressure testing.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS