Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

W.H. Ford RTC Fueling System Repairs

Active
W9128F26RA018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Omaha District, is issuing a pre-solicitation notice for the repair of the WH Ford RTC Fueling System located in Greenville, Kentucky. Under solicitation number W9128F26RA018, the project encompasses a wide range of infrastructure improvements, including the repair of dispenser and offload island concrete, the installation of asphalt circulation pavement, and the mounting of leak detector probes. The scope also includes replacing canopy and aboveground fuel pipeline coatings, installing roof penetration boot seals for tank vent pipes, and providing an EFSO station on the dispenser island. Additional technical requirements involve replacing tank vents, repairing tank grounding, providing grounding for tank stairs, and modifying existing platforms to ensure safe access to tank appurtenances. The contractor will also be responsible for upgrading the ATG console and modules, providing a deadman for truck loading, and replacing pump motor nameplates. This effort falls under NAICS code 237120 for Oil and Gas Pipeline and Related Structures Construction, with a size standard of 45 million dollars. The Request for Proposal is expected to be issued around September 28, 2026, with a projected closing date of November 20, 2026.

General Info

US Army Corps of Engineers seeks repairs for WH Ford RTC Fueling System.

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

NE, 42345

Set-Aside

NONE

Documents

(1)

W9128F26RA018 - WH Ford RTC Fueling System Repairs

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
Includes all work to repair dispenser/offload island concrete, drain water from the communications handhole, and provide an EFSO station on the dispenser island. Includes all work to repair dispenser/offload island concrete, and mount leak detector probes. Includes all work to provide asphalt circulation pavement. Includes all work to replace canopy coatings, provide splash blocks, and replace roof penetration boot seals for each tank vent pipe. Includes all work to replace canopy coatings Includes all work to replace aboveground fuel pipeline coatings, provide deadman for truck loading, and provide coated bolts, studs, and washers. Includes all work to replace tank vents, replace pump motor nameplate, repair tank grounding, provide grounding for tank stairs, and modify and extend existing platforms to provide safe access to all tank appurtenances. Includes all work to upgrade ATG console and modules.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel tanks at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project requires a contractor to provide all labor, materials, and equipment to remove and dispose of one 600 gallon fuel tank, a catch basin containing approximately 300 gallons of fuel, a 10 gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275 gallon insulated double walled fuel tanks, a new 10 gallon day tank, grounding systems, a fuel transfer pump, vent pipes, fill whistle, crossover manifold kit, fill caps, fuel level gauges, a tie down kit, and new fuel supply return lines. The work must be completed within a 120 day period of performance and adhere to all local, state, and federal laws. This procurement is a total small business set aside under NAICS code 237120, with a construction magnitude of less than 25,000 dollars. The contract is a firm fixed price agreement. To be considered responsive, all vendors must maintain an active registration in SAM.gov at the time of submission. The solicitation process includes a requirement for a detailed solicitation survey regarding vendor qualifications and a comprehensive safety and accident prevention plan. The deadline for responses is September 15, 2026, at 5:00 PM Eastern.
W2SD Endist New England

POSTED

about 15 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, managed by the USACE Japan Engineer District, is for the Bulk Fuel Storage Tanks Phase II project at Yokota Air Base, Japan. The scope of work involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank, a reinforced concrete pump house containing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump, and an access tunnel. The project includes the installation of a product saver tank, an automatic tank gauging system, and the necessary piping and control systems to integrate the new facility with the existing filter separator building. The estimated magnitude of the project is between 7.5 and 15 billion Yen, with a period of performance of 1,020 calendar days following the Notice to Proceed. The contract will be awarded using the Lowest Price Technically Acceptable (LPTA) process. To be eligible, offerors must be rated as acceptable across three evaluation factors: construction experience, which requires at least one prime contract for a fuel facility valued at 1 billion JPY or 10 million USD within the last 20 years; system supplier subcontractor experience, requiring five projects completed within the last five years; and satisfactory past performance. Proposals are due by January 25, 2027. Key contractual requirements include adherence to EM 385-1-1 safety procedures, the implementation of a Three Phase Inspection process, and liquidated damages of 615,000 Yen per calendar day of delay. The project carries a priority rating of DO-C2.
W2SN Endist Japan

POSTED

about 15 hours ago

DEADLINE

in 5 months
View Details
NAICS: 237120
New
Federal
Joint Base Langley Eustis Tank Repairs
Solicitation # W9128F27RA018
Solicitation W9128F27RA018 is a total small business set-aside design-build contract for the repair and maintenance of Tank 2186 at Joint Base Langley-Eustis, Virginia, supporting the Defense Logistics Agency. The project scope is divided into repair and maintenance phases. Repair activities include replacing the tank roof, repairing issue, receipt, and low suction piping, removing the mechanical tape gauge, replacing spiral stairs, repairing the stilling well, re-installing the tank ATG system, repairing shell manholes, replacing chime sealant, and addressing containment area, grounding, and weld spacing issues. Maintenance requirements involve replacing tank and piping coatings, providing strapping charts, and performing a final API 653 inspection. The contract is managed by the Department of Defense through the W071 Endist Omaha office, with a construction magnitude estimated between 4 million and 8 million dollars. The procurement includes specific CLINs for repair, maintenance, and ATG equipment, as well as an option for asbestos-containing material disposal. Compliance requirements include adherence to Division 01 specifications regarding quality control, safety, and cybersecurity, as well as prevailing wage rates for Virginia heavy construction as defined in wage determination VA20260198. Proposals are submitted via PIEE, and the selection process incorporates past performance evaluations through standard USACE questionnaires.
W071 Endist Omaha

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
Los Alamitos AASF Tank Repair Maintenance
Solicitation # W9128F26RA060
Solicitation W9128F26RA060 is a firm-fixed-price, design-build contract issued by the U.S. Army Corps of Engineers, Omaha District, for the repair and maintenance of vertical aboveground storage Tank 922 at the Los Alamitos AASF in California. The project is a total small business set-aside with an estimated value between 1 million and 5 million dollars. The scope of work includes comprehensive repairs and maintenance performed to API 653 standards, encompassing piping repairs, the replacement of thermal relief lines, spiral stairs, and the water draw-off system, as well as the installation of a new automatic tank gauge system and secondary containment liner. To minimize disruption to fueling operations, the contractor must phase work accordingly and may utilize temporary storage tanks as detailed in the construction plans. The project requires a performance period of approximately 410 to 420 calendar days, with liquidated damages set at 1,000 dollars per day for delays. Key personnel requirements include a project superintendent with at least 8 years of construction experience and 5 years of experience in similar projects. Proposals are evaluated based on a low-price technically acceptable source selection process, focusing on the technical approach and a detailed Gantt chart schedule. Following several amendments, the final proposal due date is September 22, 2026. The contractor is responsible for adhering to Davis-Bacon Act wage determinations for Orange County, California, and must comply with EM 385-1-1 safety standards and Buy American regulations.
W071 Endist Omaha

POSTED

3 days ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 236220
New
Federal
Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initial Minot Sentinel Beddown (IMSB), Minot Air Force Base, North Dakota (ND)
Solicitation # W9128F26SM025
The Initial Minot Sentinel Beddown (IMSB) project suite, managed by the USACE Omaha District, involves the construction of three primary facilities at Minot Air Force Base, North Dakota: a Consolidated Vehicle Maintenance Complex (CVMC), a Security Forces Operations Complex (SFOC) of approximately 130,000 square feet, and an Athletic Complex. This initiative supports the Ground Based Strategic Deterrent (GBSD) Sentinel Program and includes extensive site work such as paving, fencing, landscaping, utility expansions, and the demolition of building B425. The combined project suite magnitude is estimated between 200 million and 300 million dollars, with individual project values ranging from 2 million to 250 million dollars. Performance periods vary by facility, with the SFOC estimated at 1,440 calendar days and the Athletic Complex at 550 calendar days from the construction Notice to Proceed. The acquisition will be executed as a firm-fixed-price, Design-Bid-Build contract utilizing Other Transaction Authority under 10 U.S.C. Section 2808a. Selection will be based on a Qualifications Based Selection (QBS) process, evaluating white papers and pitch meetings rather than price. Key evaluation factors include the understanding of project objectives, collaboration approach under OTA, subcontractor retention strategies, risk mitigation, budget management, and relevant experience with complex DoD facilities. All construction must adhere to DoD Unified Facilities Criteria, including specific standards for building codes, antiterrorism, and cybersecurity. The current phase is a request for industry feedback on draft requirements and solicitations, with the official Request for Qualifications expected in October 2026.
Commercial and Institutional Building Construction

POSTED

about 15 hours ago

DEADLINE

in 13 days
View Details
NAICS: 335312
New
Federal
60kW Stationary Standby Generator Set - Chatfield Dam, Colorado
Solicitation # W9128F26QA094
Solicitation W9128F26QA094 is a request for quotes for the procurement of one 60kW stationary standby diesel generator set for the Tri-Lakes Project at Chatfield Dam in Littleton, Colorado. The required equipment is a 60kW / 75kVA 3-phase standard diesel generator in an open-skid style with an enclosure, specifically the Generac Industrial Power Model SD060 or an approved equivalent. The scope of work includes the furnishing, delivery, and provision of startup services, which encompass pre-start inspections, no-load starts, output calibrations, and comprehensive load testing. The generator must be EPA certified for stationary emergency applications and include a 10-amp NFPA 110 compliant battery charger. This is a total small business set-aside under a firm-fixed-price arrangement, with award based on the lowest-priced, technically acceptable (LPTA) offer. Technical acceptability is determined via manufacturer cut sheets, and offerors must provide up to three references from the last three years to evaluate past performance. Delivery is required FOB destination within twenty weeks of the contract award, with shipments permitted during normal business hours and requiring 24-hour advance notice. Final acceptance is contingent upon the delivery of all operating and service manuals and the successful completion of all specified inspections. Quotes are due by September 15, 2026.
Motor and Generator Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS