J041--Building 2 Steam Station Replacement

Open
36C24127Q0058Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

West Haven VAMC, West Haven, ME, 06516

Set-Aside

SDVOSBC

Documents

1
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Tnauri WoodbridgeContracting Officer

Full Description

Show more
Page 2 of 2
Combined Synopsis Solicitation West Haven VAMC Steam Station Replacement (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05. (iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $16.5 million. (v) The Government intends to award a firm-fixed price award for Steam Station Replacement at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement IAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details. (vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Site Visit: 950 Campbell Ave, West Haven CT 06516 Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.  Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.    Please post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP. 
Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to contact@example.gov. (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:  Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.  Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.  The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.  Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling +1 (555) 000-0000. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: contact@example.gov. Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is contact@example.gov)






ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT Base REPLACE BUILDING 2 STEAM STATION 1.00 JB __________________ __________________




GRAND TOTAL __________________


ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors:


ATTACHMENT 3 STATEMENT OF WORK STATEMENT OF WORK REPLACE BUILDING 2 STEAM STATION
VA CONNECTICUT HEALTHCARE SYSTEM (VACHS) VA MEDICAL CENTER WEST HAVEN 950 CAMPBELL AVENUE WEST HAVEN, CT 06516
BACKGROUND VA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139.
JUSTIFICATION Steam station failure has been identified to be impacting inpatient and critical care areas during winter months. Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures.
PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.
PERIOD OF PERFORMANCE The Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP).
QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System.
Bidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract.
Bidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System.
Service Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations.
Service Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein.
Service Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site.
Bidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work.
A full boiler plant steam outage will be conducted prior to the start of this work. Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice.
Mandatory Pre Bid: Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.
During the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work. At minimum, bidders shall verify: Existing steam pipe sizes. Existing 1/3 and 2/3 station pipe sizes. Existing regulator sizes. Existing valve sizes. Existing flange sizes, types, ratings, and configurations. Existing strainer sizes and configurations. Existing safety relief valve sizes and configurations. Existing pressure gauge arrangements. Existing condensate and drip piping. Existing support arrangements. Existing piping elevations. Available straight-pipe distances upstream and downstream of regulators. Existing cross tee configuration. Available physical space for the new steam station arrangement. Access into and out of the pit/crawl space. Confined-space access conditions. Rigging requirements. Material handling requirements. Removal path for demolished materials. Installation path for new materials and equipment. Working clearances. Existing interference with piping, structure, ductwork, electrical, equipment, or other utilities. Equipment access requirements. Existing insulation. Existing asbestos-containing or suspect materials. Flanges containing square-head bolts. Existing pipe supports and structural attachment points. Required temporary supports. Required permanent supports. Required access for future service and adjustment. Pressure gauge visibility from outside the pit/crawl space. Conditions affecting off-hours work. Conditions affecting the scheduled steam shutdown.
All pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal.
Dimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification.
The bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price.
All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.
Work shall be conducted during WHEN hours. A dedicated steam outage will be scheduled to perform this work to be included.
SCOPE OF WORK The Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document.
The intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work.
The Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site.
Description of Services: Service Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor.
All LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.
Coordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service.
Coordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations.
All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.
Coordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service.
Complete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval.
Furnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA).
Protect all equipment in place during replacement activities.
In accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1).
ASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable.
Repair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.
All new steam and condensate line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded.
Tag all existing and new valves and label new piping and components replaced as part of this scope of work.
Service provider shall perform all acceptance testing. Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work.
Service provider shall clean up work area and all debris.
Service provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center.
Existing Conditions: The existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include:
Existing 2-inch steam pressure reducing station is non-functional. Existing 2-1/2-inch steam pressure reducing station is non-functional. Both existing steam regulators are to be replaced. Existing steam stations are not presently installed in accordance with the required regulator manufacturer's piping arrangement. Existing cross tee is leaking and shall be removed and replaced. Existing pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space. Existing downstream safety relief valves shall be replaced. Existing flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material. Work is located within a restricted-access pit/crawl-space environment. These descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk.
Steam Pressure Reducing Station Replacement: Service provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation. Service provider shall furnish and install new pressure reducing stations serving the exiting steam system. Remove existing steam regulators. Remove associating piping necessary to properly rebuild the stations. Remove the leaking cross tee. Remove existing components that prevent compliance with manufacturer required piping arrangements. Furnish and install new steam regulators. Furnish and install new upstream and downstream piping. Furnish and install new fittings and tees. Furnish and install new flanges, gaskets, and flange bolting. Furnish and install unions or breakable connections where appropriate. Furnish and install strainers where required. Furnish and install isolation valves where required by the station configuration. Furnish and install condensate/drip provisions where required. Furnish and install required pipe supports. Modify or replace of existing pipe supports as required. Furnish and install temporary support of existing piping during demolition and installation. Reconnect all existing steam piping. Furnish and install all miscellaneous piping modifications necessary for the completed installation.
Steam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required:
Upstream straight-pipe distance. Downstream straight-pipe distance. Valve arrangement. Strainer arrangement. Pressure sensing arrangement. Drip-leg arrangement. Condensate removal provisions. Gauge locations. Bypass configuration, if required. Regulator orientation. Service clearances. Maintenance clearances. Safety relief requirements.
Existing conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid.
Equipment and Pipe Sizing: All equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify:
Existing pipe sizes. Required regulator inlet size. Required regulator outlet size. Required regulator capacity. Required steam pressure. Required downstream pressure. Required steam flow. Safety valve capacity. Safety valve set pressure. Strainer sizing. Valve sizing. Flange pressure class. Pipe schedule. Applicable steam pressure and temperature ratings.
The contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection.
Manufacturer Requirements Prior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application. The completed station shall comply with all manufacturer requirements.
Pressure Gauges Provide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation.
Steam-rated gauge. Gauge siphon. Isolation valve. Piping and fittings. Supports. Identification. Appropriate protection from damage.
Gauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation.
Safety Relief Valves Remove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations. Provide new safety relief valves properly selected and sized for the actual system conditions.
The contractor shall verify:
Required relieving capacity. Inlet pressure. Downstream operating pressure. Safety valve set pressure. Valve inlet size. Valve outlet size. Discharge pipe size. Required discharge arrangement.
Safety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements. Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination.
Cross Tee Replacement Remove the existing leaking cross tee. Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough. All associated piping modifications required to complete this work shall be included.
Pipe Supports Provide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for:
Pipe weight Valve weight Regulator weight Strainer weight Safety valve weight Thermal expansion

Operating loads Maintenance loads
Existing equipment shall not be improperly used as a pipe support. Any temporary supports necessary during demolition and installation shall be included.
Insulation Remove existing insulation as necessary to perform the work. Provide new insulation at all disturbed or newly installed piping after successful testing and startup. New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced.
Asbestos Abatement Existing flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM). Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM.
Wrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange. Dispose of flanges as ACM.
Abatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement.
Rigging and Material Handling: The contractor shall include all rigging and material handling required to remove existing equipment and install new equipment. The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid.
Testing: Following installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable: Pressure testing Leak testing Flange inspection Valve inspection Regulator inspection Gauge verification Safety valve verification
Repair any leaks or deficiencies associated with the new work at no additional cost to the government.
Startup and Commissioning: Following completion of the installation:
Start the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor. Verify proper regulator operation. Adjust regulators to the required operating pressures. Set the 1/3 station. Set the 2/3 station. Verify proper transition and operation between the two regulators where applicable. Verify downstream pressures. Verify gauge readings. Verify valve operation. Verify safety valve installation. Verify proper condensate drainage. Inspect all new piping and connections for leakage. Make final adjustments required for proper system operation.
The steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer.
VA Specifications and Code Compliance: All materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope.
Materials: All materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class. Substitutions shall not be made without approval. Demolition and Disposal Remove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations. The work area shall be broom-clean and free of construction debris following completion.
Protection of Existing Conditions: The contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work. Any damage caused by the contractor shall be repaired at the contractor s expense. The bidder shall include reasonable temporary protection required to perform the work.
Bidder Responsibility for Complete Scope: The bidder is responsible for providing a complete turnkey price based on: This Scope of Work Mandatory Site Inspection Existing Field Conditions Applicable VA Requirements Applicable Codes Manufacturer installation requirements Proper methods of constructing assemblies associated with the Scope of Work.
The bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation. The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work.
Bid Clarifications and Exceptions: Any ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer. Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price.
The successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work.
SUBMITTALS/DELIVERABLES Service provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work.
Service provider shall furnish all material certifications for any replacement parts used.
Service provider shall furnish a waste manifest as required.
SPECIAL INSTRUCTIONS All service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours.
General: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.
Approved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits.
Site Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort.
The service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. The service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion.
The service provider shall develop and provide to the VA the following: Safety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.
All applicable personnel on site are required to obtain an Occupational Safety and Health Administration (OSHA) 10 hour construction certification, and the site competent person for the service provider must obtain an OSHA 30 hour construction certification.
Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.
No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.
Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.
The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others.
Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report.
Safety Codes / Certification / Licensing: Environmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.
The Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.
The C&A requirements do not apply and a Security Accreditation Package is not required.
NARA Records Management Requirements
The following standard items relate to records generated in executing this contract:
Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
The Government Agency owns the rights to all data/records produced as part of this contract.
The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
The Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
Solicitation N4425527RB003 is a design-build project for the installation of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap in Bremerton, Washington. This 100% set-aside for 8(a) businesses in SBA Region X involves the design, construction, and commissioning of a system that incorporates existing HPA cross connections from compressors at the south end of Pier D to provide air to shore risers at five specific bollard locations. The project requires the expertise of a Designer of Record to ensure compliance with Unified Facilities Criteria (UFC), ASME, and other DoD and Navy design codes, with the most stringent requirements governing in the event of discrepancies. The estimated magnitude of construction is between $1,000,000 and $5,000,000. The contract is a firm-fixed-price task order under an 8(a) Multiple Award Construction Contract (MACC) with a period of performance of 538 calendar days from award. Award will be based on price and MACC past performance. Key requirements include adherence to EM 385-1-1 safety standards, Davis-Bacon wage rates, and strict security protocols for base access and the handling of government data. Deliverables include comprehensive control system documentation, as-built sequence of operations, and the completion of final acceptance and operational tests. Contractors must provide a bid guarantee of 20% of the bid price or $3 million, whichever is less, and furnish performance and payment bonds within 10 days of award.
Bristol Alliance of Companies

POSTED

42 minutes ago

DEADLINE

in 21 days
View Details
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is soliciting bids for solicitation CBP#9772 to provide HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. This is a fixed-price, single lump sum subcontracting opportunity with an estimated value between $100,000 and $250,000. The scope of work requires the thorough cleaning of twelve AHUs and twenty-eight specified coils across the Kilmer and Edison Dormitories, along with the cleaning of all accessible supply, return, and outside-air ductwork. The contractor is responsible for providing and installing permanent, gasketed access panels where necessary and must deliver a final project report including pre-cleaning photographs. Bids are due by November 17, 2026, and will be awarded based on overall best value. Mandatory requirements for consideration include a physical site visit, a completed itemized pricing schedule, and a written acknowledgment of the full scope of work. For bids of $25,000 or more, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project must be completed within 90 consecutive business days following a written Notice to Proceed. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Awarded contractors must possess a Unique Entity ID (UEI) and comply with various Federal Acquisition Regulation (FAR) clauses, including Buy American and Service Contract Labor Standards. All work must adhere to the New Jersey General Decision Number NJ20250036 wage determination for Middlesex County. Final acceptance of the work is subject to inspection and written confirmation by the Center.
Edison Job Corps

POSTED

43 minutes ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
CBP7787 ED1 RM 123 HVAC Compressor Replacement
Solicitation # CBP7787 ED1 RM 123
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace a failed HVAC/refrigeration compressor at the Sierra Nevada Job Corps Center in Reno, Nevada. The project, identified as CBP7787 ED1 RM 123, has an estimated value between 0 and 25,000 dollars. The scope of work is divided into four phases: preparation and environmental safety, including refrigerant recovery per EPA Section 608 regulations; demolition and removal of the failed unit; installation of an OEM-specified compressor and associated components; and system testing and commissioning. Bids are due by November 17, 2026, at 3:00pm PST and must be submitted to Tom Williams. To be considered, offerors must conduct a physical site visit, provide three references for comparable projects, and submit a detailed cost breakout. Required administrative documentation includes the MTC Supplier Packet, a W-9, and a UEI number for the awarded contractor. Bids of 25,000 dollars or more require a bid bond of at least 20 percent of the base bid. Contractors must maintain general liability insurance of at least 1,000,000 dollars and worker's compensation with employer liability limits of 500,000 dollars. Award will be based on overall best value, and the contractor must comply with Washoe County wage determinations and various FAR clauses regarding whistleblower rights and the Buy American Act.
Sierra Nevada Job Corps Center

POSTED

43 minutes ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
MJCC Multiple HVAC Replacement System
Solicitation # mjcc-multiple-hvac-replacement-system
The Montgomery Job Corps Center, through Education and Training Resources (ETR), is seeking quotes for a turnkey replacement of multiple HVAC systems at its facility in Montgomery, Alabama. The project involves the removal of existing equipment and the installation of new systems across several buildings, including units ranging from 3.5 to 10 tons in Buildings A, B, E, F, and G. Technical specifications require Energy Star systems with specific EER ratings, 90 percent efficiency furnaces, and the use of R-454B refrigerant. Contractors must provide testing and balancing services to ensure proper airflow and offer a warranty of 5 to 10 years on parts and 2 years on workmanship. This is a subcontracting opportunity set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bidders must possess an active SAM.gov registration with a Unique Entity ID, provide Alabama state licensing, and submit certificates of insurance. Compliance with the Davis-Bacon Act for prevailing wages and various FAR clauses regarding debarment and the Service Contract Act is mandatory. Bonding requirements are tiered based on project value, with 100 percent payment bonds required for projects over 35,000 dollars and both performance and payment bonds required for those exceeding 150,000 dollars. Quotes must be submitted by November 27, 2026, at 12:00 PM CST, and must remain valid for 90 days.
Montgomery Job Corps Center

POSTED

43 minutes ago

DEADLINE

in 17 days
View Details
NAICS: 238220
New
Joliet Job Corps-Request for Quote HVAC Replacement Female Dormitory
Solicitation # joliet-job-corps-request-quote-hvac-replacement-female-dormitory
Management and Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC system at the Joliet Job Corps Center female dormitory in Illinois. The project scope includes the removal and disposal of ten existing furnace and air conditioning systems and the installation of ten new Carrier systems. Additionally, the contractor must install and integrate a Pelican Building Automation System (BAS) across eleven units, including one existing unit. The estimated contract value ranges from $250,000 to $500,000. Bids must be submitted to Frances McGraw by November 23, 2026, and must include a detailed cost breakout, supplier self-certification, and identification of applicable wage rates. Award decisions will be based on overall best value. Mandatory requirements for consideration include a physical site visit and the submission of a bid bond equal to 20 percent of the base bid for projects $25,000 or greater. Awarded contractors must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to the Davis-Bacon Act, requiring compliance with specific Illinois prevailing wage determinations and the display of required employment rights posters. Contractors must also maintain general liability insurance of at least $1,000,000 per occurrence and worker's compensation with employer's liability limits of $500,000. Final acceptance is contingent upon the completion of a punch list, delivery of operation and maintenance manuals, and provision of manufacturer and installer warranties.
Joliet Job Corps

POSTED

43 minutes ago

DEADLINE

in 13 days
View Details
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of existing failing air compressors and the entire dry system distribution piping network across three locations: Building CM (Men's Dormitory), Building CW (Women's Dormitory), and Building D (Recreation). The contractor is required to supply and install a new code-approved piping network and properly sized air compressor in accordance with NFPA 25 (2023 Edition) standards. All work must be completed within 30 consecutive business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be evaluated based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required at the time of submission, and performance and payment bonds from an A-rated surety must be provided within five business days of an Intent to Award letter. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates, FAR requirements for business size self-certification, and FFATA reporting for contracts valued at $40,000 or more. Final payment is contingent upon a successful joint inspection, the submission of certified payroll reports, and the delivery of operation and maintenance manuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

43 minutes ago

DEADLINE

in 21 days
View Details
NAICS: 238220
New
Inland Empire Job Corps-Request for Quote HVAC Replacement Cafeteria & OA CTS
Solicitation # inland-empire-job-corps-request-quote-hvac-replacement-cafeteria-oa-cts
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace packaged HVAC units with gas heating at the Inland Empire Job Corps Center in San Bernardino, California. The project focuses on the Cafeteria and OA/CTS areas and includes the removal of existing units per EPA refrigerant regulations, installation of new high-efficiency units at ground-level or rooftop locations, and the modification of gas piping, ductwork, and electrical disconnects. The estimated price range for this effort is between $25,000 and $100,000. Bids are due by November 23, 2026, and will be evaluated based on overall best value. Prospective bidders must complete a mandatory physical site visit and submit a detailed bid breakout on company letterhead, including model numbers and energy efficiency data. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project is subject to Construction Wage Rate Requirements (CWPR), requiring compliance with California prevailing wages. Additionally, contractors must adhere to OSHA safety standards, provide a Certificate of Insurance, and submit a completed MTC Supplier Self-Certification packet including a UEI number and W-9.
Inland Empire Job Corps

POSTED

43 minutes ago

DEADLINE

in 13 days
View Details
NAICS: 238220
New
CBP7792 Cafeteria Hot Water Heater Replacement
Solicitation # CBP7792
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace a failing commercial natural gas-fired water heater at the Sierra Nevada Job Corps Center in Reno, Nevada. The project requires a licensed plumbing contractor to isolate, remove, and dispose of the existing unit and install a new commercial-grade 125-gallon natural gas-fired water heater with equivalent input and storage capacity. The estimated price range for this effort is between $25,000 and $100,000. Award decisions will be based on overall best value, evaluating price, quality, delivery schedule, and experience with similar construction projects. Bidders must submit a signed bid form and a detailed cost breakout on company letterhead, including itemized labor, materials, and equipment costs. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. The contractor must comply with federal standards, including the Buy American Act and Davis-Bacon Act prevailing wage rates for Washoe County. Required deliverables include two sets of operation and maintenance manuals, manufacturer and installer warranties, and a final project closeout package. Payment will be processed via pay applications using AIA G702 and G703 forms, with a payment term of ten days after receipt of a valid invoice.
Sierra Nevada Job Corps Center

POSTED

43 minutes ago

DEADLINE

in 15 days
View Details

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 811310
New
Federal
J061--Eaton Powerware System Replacement
Solicitation # 36C24127Q0030
The Department of Veterans Affairs is seeking a qualified contractor for the replacement and ongoing maintenance of an end-of-life uninterruptible power supply (UPS) system at the VA Medical Center in Manchester, New Hampshire. The project requires the installation of an Eaton 93E UPS and Extended Battery Life Cabinet, or an equivalent system, followed by a comprehensive service contract. This contract consists of a base year running from January 4, 2027, through January 3, 2028, with four successive 12-month option years. The scope of work includes quarterly and annual preventative maintenance, standby labor for electrical shutdowns, emergency on-call repair services with a four-hour response time, and annual user training. This acquisition is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 811310. The selected contractor must be authorized to work on Eaton products, possess the necessary proprietary software, and comply with the Service Contract Labor Standards for Hillsborough County, NH. Evaluation will be based on technical quality, past performance, and total evaluated price. Quotations must be submitted by November 26, 2026, and must include a signed Certificate of Compliance regarding limitations on subcontracting, ensuring that no more than 50% of the work is performed by non-similarly situated entities.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 238220
New
Federal
J041--Condensate Pump Replacement
Solicitation # 36C24127Q0054
The Department of Veterans Affairs is soliciting a firm-fixed-price contract for the replacement of condensate pumps, motors, and associated piping at the West Haven VA Medical Center in Connecticut. This project, designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 238220, focuses on restoring the lead/lag condensate pump assemblies in Building 1 (Mechanical Room SG182) and Building 2 (Mechanical Room G139). The goal is to improve boiler plant efficiency, reduce corrosion risks, and decrease makeup water usage. The scope includes the removal of defective equipment from confined spaces, installation of new high-temperature rated pumps, electrical service upgrades, BAS tie-ins for flow monitoring, and the provision of a minimum two-year warranty on all parts and labor. The contract requires strict adherence to safety protocols, including VA Medical Center Policy 138-075 for Lock-Out-Tag-Out and SOP SO-010 for Confined Space Entry. Eligible bidders must have a field representative within 200 miles of the campus and possess OEM training for the specific equipment. Evaluation will be based on best value, considering price, technical capability, and past performance. Key deliverables include a final documentation report with tests and photos due within 10 business days of completion, material certifications, and a waste manifest. All quotes must be submitted electronically to the contracting officer by December 3, 2026, and offerors must be registered in both the System for Award Management (SAM) and VISTA.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 561621
New
Federal
J012--Fire Alarm & Fire Protection System Maintenance
Solicitation # 36C24127Q0055
The Department of Veterans Affairs is soliciting quotes for comprehensive fire alarm and fire protection system maintenance for the VAMC Providence in Rhode Island and the New Bedford Community Based Outpatient Clinic in Massachusetts. This unrestricted procurement, categorized under NAICS 561621, follows a one-year base period with four one-year option periods, with an estimated start date of November 16, 2026. The scope of work includes comprehensive fire services and hourly rates for services performed outside of normal business hours. Contractors are required to provide legible field service reports and maintenance documentation conforming to NFPA, Joint Commission, and EC Standard 2.7 specifications. Quotations will be evaluated using a comparative process based on technical quality, past performance, and total evaluated price, which includes the base period, all option periods, and a six-month extension under FAR 52.217-8. The government reserves the right to award the contract to a provider other than the lowest price if additional benefits are provided. All offers must be submitted to Rosangela Pereira by 3:00 PM EST on November 13, 2026, and must include the offeror's Unique Entity Identifier and a statement of agreement with the solicitation terms. Invoicing and purchase orders will be managed through the VISTA system.
Security Systems Services (except Locksmiths)

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 238990
New
Federal
Amendment 0002- Replacement-in-Kind Repair of Existing Perimeter Security Fence (Ameristar Impasse Trident) Brand Name or Equal
Solicitation # 36C24127Q0041
The Department of Veterans Affairs VA Boston Healthcare System is soliciting quotes for a firm-fixed-price contract to perform a localized replacement-in-kind repair of the perimeter security fence at the Brockton VA Campus in Brockton, Massachusetts. The project focuses on restoring five affected fence bays and six associated post locations that were damaged by winter snow-removal activities. The benchmark product is the Ameristar Impasse Trident system, and any proposed equal must meet all salient characteristics, including the use of corrosion-resistant, tamper-resistant hardware and a uniform transition in profile, color, and finish to the existing fence. The scope is strictly limited to the damaged sections and does not authorize any redesign or expansion of the perimeter. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The period of performance is scheduled from December 1, 2026, to January 31, 2027. Award will be made to the responsible offeror determined to be most advantageous based on price, past performance, and technical capabilities. Proposals must be submitted in three separate PDF volumes covering technical approach, past performance, and pricing. Following Amendment 0001, a site visit is scheduled for November 10, 2026, and the closing date for the receipt of offers has been extended to November 13, 2026, at 1:00 PM EST.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS