Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J045--626A4-22-202 - AJP-Upgrade Steam Distribution System

Closed
36C24926R0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the upgrade of the steam distribution system at the Tennessee Valley Healthcare System, VA Medical Center located in Murfreesboro, Tennessee. The contractor is responsible for providing all labor, materials, equipment, and supervision necessary to complete the project in accordance with specified drawings and requirements. The scope includes demolition and new construction across various disciplines such as general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, and industrial hygiene. The total period for performance is set at 546 calendar days with adherence to warranty provisions for materials and workmanship for one year unless otherwise specified. Work hours are primarily Monday through Thursday from 6 a.m. to 4:30 p.m., with potential night and weekend work required to maintain the Medical Center’s functionality and minimize disruptions, which must be scheduled and approved in advance. Specific technical requirements prohibit the use of clamp-on saddles, ductile, and cast-iron materials unless otherwise noted. Additionally, the contractor must install 30 extra analog pressure gauges at locations coordinated during construction. Temperature-related constraints for steam shutdowns must be observed to avoid additional costs. Included with the contract are supporting documents such as a Regulated Building Materials Survey Report and policies for confined space entry and electrical condensate management. The contracting agency is the Department of Veterans Affairs, with contact points provided for coordination and inquiries.

General Info

Upgrade steam system at Tennessee VA Center with demolition, construction, multi-discipline work, 546 days completion.

Agency

Department Of Veterans Affairs → 249-NETWORK Contract Office 9 (36C249)

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors View NAICS

Place of Performance

TN

Set-Aside

NONE

Documents

(20)

Solicitation 36C24926R0017 - AJP-Upgrade Steam Distribution System

DOCXpresolicitation

Site Visit Map for Building 16 Meeting

DOCXother

Past Performance Questionnaire for Project 626A4-22-202 AJP-Upgrade Steam Distribution

DOCXpast-performance

Attachment+2B+Engineering+Service+Confined+Space+Entry+Policy.pdf

PDF

Attachment 9 Price Breakout Schedule

XLSXprice-breakout-schedule

Wage Determination TN20260187 Rutherford County TN

PDFwage-determination

General Conditions Breakout for Construction Contract

XLSXsow

Amendment 0002 to Solicitation 36C24926R0017

PDFamendment

Solicitation 36C24926R0017 Contractor EMR Certification Form

DOCXcontractor-emr-certification-form

Solicitation 36C24926R0017 for Steam Distribution System Upgrade at York Campus VAMC

DOCXifb

Attachment+6+Calculation+of+Contractor+Self+Performed+Work.xlsx

XLSX

Amendment 0001 to Solicitation 36C24926R0017 - Site Visit and RFI Instructions

PDFamendment

Attachment+10+TAX+ID+UEI+Document.docx

DOCX

Attachment+2A+Regulated+Building+Materials+Survey+Report.pdf

PDF

36C24926R0017+0003.pdf

PDF

Attachment+4+ENG+FORM+4288-R.pdf

PDF

Attachment+3+Specifications+626A4-22-202+AJP-Upgrade+Steam+Distribution+Final.pdf

PDF

36C24926R0017+0004+CO+Signed.pdf

PDF

Attachment+5+Drawings+626A4-22-202+AJP-Upgrade+Steam+Distribution.pdf

PDF

Attachment+2C+BOD+Electric+Condensate+Packages.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Posted

Solicitation

Amendment 5

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 249-NETWORK Contract Office 9 (36C249)
Contacts2 people available
OfficeMURFREESBORO, TN, 37129, USA
Organization / Agency
Department Of Veterans Affairs → 249-NETWORK Contract Office 9 (36C249)
Office AddressMURFREESBORO, TN, 37129, USA
Contacts
Jen JamiesonContract Specialist
Jeannette Morphew

Full Description

Show more

STATEMENT OF WORK GENERAL INFORMATION Title of Project: Project# 626A4-22-202 AJP-Upgrade Steam Distribution System Scope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-22-202 "AJP-Upgrade Steam Distribution System at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction including, but not limited to, general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items. Statement Of Bid Item(S) BID ITEM 1: Includes all work per drawings and specifications. Period of Performance: 546 calendar days GENERAL REQUIREMENTS All work, including materials, will be warranted for a period of one year unless otherwise indicated in the specifications and drawings. Normal working hours are Monday through Thursday from 6 a.m. to 4:30 p.m. Contractor may be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Center s operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins. Steam shutdowns will not be allowed if outside temperatures are below 58 F or a temporary means of supporting the building(s) is identified prior to the shutdown. Contractor must consider this when producing a schedule. Outside temperature related issues will result in no additional cost to the government. No clamp-on saddles are allowed in the system. In addition to the specifications and drawing s locations, provide an additional 30 analog pressure gauges to install at locations coordinated with the COR during construction. Ductile and Cast-iron materials are strictly prohibited unless otherwise noted in the specifications and drawings. See specifications and drawings for additional requirements. ADDITIONAL ATTACHMENTS Attachment 2A - Regulated Building Materials Survey Report Attachment 2B - Engineering Service Confined Space Entry Policy Attachment 2C - BOD Electrical Condensate Packages END OF STATEMENT OF WORK