This Solicitation opportunity from Department Of Veterans Affairs was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J063--Physical Access Control (PACS) Maintenance Request for Information

Closed
36C10D26Q0117Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Centennial Fire Alarm & CO Detection Upgrade and Maintenance Services
Solicitation # centennial-fire-alarm-co-detection-upgrade-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide fire alarm and carbon monoxide (CO) detection upgrade and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The primary objective is to restore the central Simplex 4020 Fire Alarm Control Center Panel and connected systems across nine campus facilities to full operational status. The scope of work includes diagnosing and clearing system faults, upgrading the panel motherboard or firmware if necessary, and integrating CO detection into the men's and women's dormitories by installing intelligent multi-criteria detectors and sounder bases. All work must adhere to NFPA 101 (2024), NFPA 72 (2025), IFC (2024), and local building and fire codes. Bids are due by December 1, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form with a detailed cost breakout. A physical site visit and signature on the attendance roster are mandatory for bid consideration. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. This project is subject to the Davis-Bacon Act and Construction Wage Rate Requirements, necessitating the payment of prevailing wages and the submission of weekly certified payroll reports. The solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, and requires a Unique Entity ID (UEI) for all bidders.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 561621
New
Federal
Corrective and Preventative Maintenance of Electronic Security Systems at the Ronald Reagan Building
Solicitation # 70RFP226QEC000005
The US Department of Homeland Security Federal Protective Service is soliciting proposals for a Firm Fixed Price Indefinite Delivery Indefinite Quantity contract to provide corrective and preventative maintenance for electronic security systems at the Ronald Reagan Building in Washington, D.C. The scope of work includes the repair, replacement, lifecycle upgrades, and routine maintenance of the Video Surveillance System and Technical Countermeasures system, encompassing interior and exterior fixed IP cameras, controllers, monitors, NVR recorders, and associated infrastructure. This acquisition is set aside for Women-Owned Small Businesses or Economically Disadvantaged Women-Owned Small Businesses under NAICS code 561621. The contract features a one-year base ordering period from October 1, 2026, to September 30, 2027, with four optional one-year ordering periods, extending the total period of performance through September 30, 2031. Award selection will be based on a best value tradeoff process where technical factors are weighted more heavily than price. Prospective contractors must be registered in the System for Award Management and were required to submit a Non-Disclosure Agreement to participate in site visits. All work must comply with Service Contract Act Wage Determination No. 2015-4281, Revision 38, and the procurement is conducted in accordance with FAR Part 12.
Fps East Ccg Division 2 Acq Division

POSTED

about 3 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Department of Veterans Affairs, Veterans Benefits Administration, is seeking a contractor to perform comprehensive preventative maintenance, inspections, and optional upgrades on the Physical Access Control System (PACS) at specified VBA Regional Offices. The contract structure includes a one-year base period with four additional option years, exercisable at the government's discretion. Services must be conducted during normal business hours Monday through Friday, excluding federal holidays, with all work requiring prior coordination with the facility point of contact at least one hour before arrival. Preventative maintenance is scheduled quarterly, beginning within 30 business days of contract start, and includes operational testing of access control doors, duress buttons, and head-end equipment; backup of system databases; installation of software and firmware updates; and thorough inspections involving load testing of power supplies and batteries, equipment cleaning, and mechanical adjustments. Two controlled power outages are mandatory per contract period, with the first occurring within 60 business days of award and the second within six months thereafter, followed by detailed reporting. Emergency services must be available 24/7/365, with response initiated within eight hours of a government request, and an estimated six emergency responses are anticipated annually. The contractor must submit detailed electronic reports within five business days of routine maintenance and within 48 hours of emergency service, including test results, deficiencies, itemized cost estimates, and recommended repair timelines. An optional upgrade task allows the government to mandate major software version upgrades, to be completed within 120 calendar days of exercise. All contractor personnel must undergo a low-risk (T1) or moderate-risk (T2) federal background investigation, including fingerprinting and e-QIP processing through DCSA or OPM, and must be U.S. citizens or legally authorized to work in the U.S. with English proficiency; reciprocation of prior clearances is permitted. The contractor must provide manufacturer-authorized technician certification for the installed PACS system and deliver technical help desk support at no additional cost. Personnel granted access to VA systems must complete mandatory cybersecurity and privacy training, submit proof annually, and comply with VA Directive 6500 and Handbook 6500.6 guidelines. This solicitation is a Request for Information (RFI), not a procurement, with no award expected, intended solely to gather industry input for future contracting.

General Info

Provide quarterly PACS maintenance, biannual power tests, 24/7 emergency support, and detailed reporting.

NAICS

561621 - Security Systems Services (except Locksmiths)

Place of Performance

DC

Set-Aside

NONE

Documents

2

RFI 36C10D26Q0117 Physical Access Control (PACS) Maintenance

DOCX, Low priorityrfi
Low

RFI 36C10D26Q0117 Physical Access Control System Maintenance

DOCX, Low priorityrfi
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice type changed from Solicitation to Special Notice. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Veterans Benefits Administration (36C10D)
Contacts1 person available
OfficeWASHINGTON, DC, 20006, USA
Office AddressWASHINGTON, DC, 20006, USA
Contacts
Joshua N GallienContract Specialist

Full Description

Show more
Page 2 of 2
Department of Veterans Affairs (VA) Veterans Benefits Administration (VBA) Statement of Work (SOW) Physical Access Control System (PACS) Preventative Maintenance
SCOPE:
The Contractor shall provide all personnel, equipment, tools, material, supervision, and quality control necessary to perform preventative maintenance, inspections and updates/upgrades to the Physical Access Control System (PACS) equipment at the Department of Veterans Affairs, (Veterans Benefits Administration (Insert VBA Regional Office name here)
PLACE OF PERFORMANCE / HOURS OF OPERATION:
(Insert VBA Regional Office address here)
Normal Business Hours are (Insert hours of operation here)
Work at the site will not take place on Federal Holidays or weekends.
If a Federal Holiday falls on a day scheduled for services, the services will resume the next official workday between the scheduled hours.
Contractor shall contact the facility Point of Contract (POC) at least one hour prior to arrival at the station by calling the POC s direct extension.
PERIOD OF PERFORMANCE:
The period of performance shall be one (1) base year (12 months) with four (4) potential (1) option years to be exercised at the discretion of the Contracting Officer.
Government Furnished Equipment: N/A
Definitions:
5.1 Business days Monday through Friday excluding Federal Holidays
POST AWARD MEETINGS / PROGRESS MEETINGS:
The contractor shall attend (virtually) any post award meetings convened by the Contracting Officer (CO), Contract Specialist (CS) or facility POC. Meetings shall discuss contract performance, lessons learned, issues identified or any other topic deemed necessary by the Government.
CONTRACTOR QUALIFICATIONS:
The contractor or subcontractor shall be an approved reseller and manufacturer-authorized technician for (state the currently installed PACs System here) for the duration of the contract term.
PREVENTATIVE MAINTENANCE:
The Contractor shall provide services required under this contract within normal business hours except on recognized federal holidays or when the Government facility is closed due to local/national emergencies, administrative closures, or similar Government directed facility closings. The first inspection shall take place within 30 business days of the period of performance start date, each following inspection will take place every three (3) months, unless otherwise approved by the facility POC.
Provide preventative maintenance on a day mutually agreed on by the Government and the contractor for the devices indicated on the Equipment Inventory List.
Equipment List: (Complete the following table for all equipment that requires maintenance) Equipment Inventory List
Item No. Part Number: Description: Serial Number: Quantity: Location: 1


2


3


4


5


6


7


8


9


10


11


Four (4) times a year (quarterly) - Verify functionality of access control doors, duress/panic buttons and head end equipment.
Four (4) times a year (quarterly) - Perform back up of the system database.
Four (4) times a year (quarterly) Conduct software maintenance and functionality tests to include installation of software & firmware updates / patches to all equipment.
Provide manufacturer software technical help desk support and update support as needed at no additional cost to the Government.
Four (4) times a year (quarterly) - Perform preventive maintenance inspections of the security system.
Maintenance inspection shall include but not limited to: Operational testing of all PACS equipment. Load Testing of all power supplies and back-up batteries in all systems, Cleaning and adjusting of all equipment Checking equipment for loose mountings or connections, adjusting electric locks, etc.
PREVENTATIVE MAINTENANCE REPORTING:
Within five (5) business days of the inspection date, the Contractor shall prepare and submit to the facility POC an electronic report and shall include but not limited to:
Name of Employee/s providing services
Date and time of service
Operational test results to include but not limited to access control doors/panic buttons. All deficiencies shall include type, location, part number, test results, itemized quote for repair and estimated duration of recommended repairs.
Results of power supply and back-up battery tests. All deficiencies shall include type, location, part number, test results itemized quote for repair and estimated duration of recommended repairs.
Equipment Adjustments. List, locations, part numbers, and adjustments made.
System database back-up. Date and time of back-up.
Software maintenance / function check. Software manufacturer s name, software name, software version prior to update, software version after update.
Description of service needed to correct identified deficiencies, and itemized cost estimate (parts and labor) to correct deficiencies.
CONTROLLED POWER OUTAGES:
The Contractor shall perform as part of Preventative Maintenance two (2) scheduled Controlled Power Outages per period of performance whereby the security system would be powered down in an orderly fashion in preparation of the event of an extended power outage and then safely restore the security system to full operation.
The first controlled power outage shall take place within 60 business days of the period of performance start date. The second inspection will take place within six (6) months after the initial outage, unless otherwise approved by the facility POC.
Report:
Within five (5) business days of the controlled power outage date, the Contractor shall prepare and submit to the facility POC an electronic report and shall include but not limited to:
Name of Employee/s providing services Date and time of service Results of power outage, to include deficiencies Description of service needed to correct identified deficiencies, and itemized cost estimate (parts and labor) to correct deficiencies.
In the event additional Controlled Power Outages per the period of performance are required, and the Contractor shall provide pricing for those additional Controlled Power Outages beyond the included two (2) for each priced period of performance.
EMERGENCY INSPECTION SERVICES:
The Contractor shall provide emergency services inspections that includes inspecting and troubleshooting the PACS system equipment as appropriate to determine the cause of the problem(s) and actions needed to restore the system equipment.
Contractor shall respond to Government calls for emergency services throughout the period of performance. The contractor shall be available to respond to service calls 24 hours a day, 7 days a week, 365 days a year.
Emergency services must be initiated, by the contractor, within 8 hours of the Government service call unless otherwise specified by the facility POC.
Contractor shall provide an estimated quantity of six (6) emergency services per contract year.
Contractor shall submit a report to the facility POC, within 48 hours of the emergency service, outlining at a minimum:
Date/time of service call and inspection Duration of inspection Location where services were provided (floor, room, address etc.) Description of services provided If repairs or maintenance are required to restore the equipment functionality, the contractor shall provide the facility POC with an itemized quote stating at minimum:
Location of repairs needed Description of proposed repair(s) or maintenance service(s), Itemized cost estimate identifying material (to include manufacturer part numbers) and labor costs for performing repair(s) or maintenance Estimated duration for the repair(s) or maintenance to be completed.
OPTIONAL TASK UPGRADE:
Optional Task Upgrade (Major Version Changes): Installation of all Government selected Software version UPGRADES (major version changes) to any PACS equipment outlined in the Equipment List that has version upgrades available from the software manufacturer. Version upgrades shall include all patches and updates provided to the Government Provided means downloaded, installed & configured, by the contractor, onto applicable PACS computer/equipment. The Government reserves the right to unilaterally exercise the applicable line-item to exercise this optional upgrade task.
Upon exercising the optional Upgrade task line-item the contractor shall complete the installation within 120 calendar days of contract modification.
Within five (5) business days of the completed upgrade, the Contractor shall prepare and submit to the facility POC an electronic report including but not limited to:
Software manufacture s name Software name Software version prior to the upgrade and software version after the upgrade Date and time of upgrade Technician/s preforming the upgrade.
SECURITY:
All Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C.§552a, and VA personnel, regarding information and information system security. Contractors must follow policies and procedures outlined in VA Directive 6500, Information Security Program; and VA Handbook 6500.6. See attached VA 6500.6 Appendix C which is incorporated in the resulting task order to ensure appropriate security controls are in place.
Contractor Personnel Security Any individual who requires access to the VA site(s), personally identifiable information (PII) and/or access to VA local area network (LAN) systems shall be the subject of a favorable fingerprint check (SAC) adjudicated by VBA Personnel Security Office (PERSEC). Individuals are required a background investigation and must receive a favorable adjudication from the VA Personnel Security and Adjudication Center (PSAC). These requirements are applicable to all sub-contractor personnel requiring any Background Investigation (BI) conducted by Defense Counterintelligence Security Agency (DCSA).
The level of BI will be in accordance with VA Directive 0710 dated June 4, 2010 and is available at http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=487&FTyp.
Background Investigation: The Contractor employee level of BI required for this effort is: Low Risk (T1) Security Employees Moderate Risk (T2) Managers and Directors Note: The position sensitivity should reflect the results from the completion of the PDAT versus the title of the individual.
Investigation Documents: Immediately after contract award, the COR will provide the Contractor with the following background investigation documents to be completed by the Contractor and returned thru the COR to VBA PERSEC to begin the background investigations process for all contract employees working on the contract who will have access to VA/VBA facilities, VA systems, or privacy data:
Background Investigation Request Worksheet Optional Form 306 Declaration of Federal Employment VBA Contractor Fingerprint Request Form VA Form 0710 Authorization for Release of Information Fair Credit Report (if T2 or higher) (SC) Self-Certification Form (if applicable) VA Form 0711 Request for Personal Identity Verification Card SIC Contractor Background Request Form (unsigned)
Submitting Completed Package: Upon receipt of documents listed in above from the COR, the COR will submit the background investigation package to VBA s Personnel Security Specialist. Upon notification of favorable fingerprint results, the COR should request the official VA email account and will be notified of all background investigation requirements preventing the Contractor from an immediate onboard. Thereafter, the Contractor shall receive an email notification from DCSA including detailed instructions regarding completion of the background clearance application process in the Electronic Questionnaires for Investigations Processing (e-QIP) system. e-QIP is an online, internet accessible system, where the Contractor employee shall complete the security questionnaire required for OPM to process background investigation. Once the e-QIP is released by VBA PERSEC, scheduled by OPM, the Contractor may begin work while the background investigation is ongoing.
Reciprocation: Contractors who have current favorable background investigation previously conducted by OPM or DCSA may be accepted through reciprocation. When a previous personnel security clearance is currently held, it does not preclude the Contractor form submitting a complete Background Investigation Package as stated above to the COR immediately after contract award for all Contractor employees who will be working on the contract.
Pre-Screen: The Contractor shall prescreen all personnel who require access to VA site(s) and/or access to VA LAN systems to ensure they maintain a U.S. citizenship or Alien Registration that authorizes them to work in the U.S., and are able to read, write, speak, and understand the English language.
Contractor Performance: Contract performance shall not commence before: The VBA has confirmed favorable fingerprint results, or PSAC confirms that it has received the Contractor s investigative documents, The documents are complete, and that the background investigation information has been released to OPM for scheduling of the background investigation, or VBA or the PSAC has confirmed that the verified investigation will be reciprocated.
Copy of Certificate of Investigation (COI): The COR will notify and forward the Contractor a copy of the Certificate of Investigation when the background investigation has been favorably completed or a Certificate of Eligibility (Form 4236) if the investigation has been reciprocated. The Contractor, if notified, of an unfavorable adjudication by the Government, shall withdraw the employee from consideration from working under the contract. Failure to comply, the Contractor personnel security requirements may result in termination of the contract for default.
Responsibility: The Contractor shall be responsible for the actions of those contract and subcontract employees it provides to perform work for the VBA. In the event damage arises from work performed by Contractor employees the Contractor will be responsible for resources necessary to remedy the incident.
Vendor Selection: Should the Contractor use a vendor other than OPM or DCSA to conduct background investigations, the investigative company must be certified by OPM/DCSA to conduct Contractor background investigations. The Vendor Cage Code number must be provided to the VA PSAC, which will verify the information and conclude whether access to the Government s site(s) and/or VA LAN systems can be granted.
Investigative History: The investigative history for Contractor personnel working under this contract must be maintained in the databases of either OPM or DCSA.
Government Responsibilities:
After the VBA PERSEC has quality controlled the BI package from the Contractor, the VBA PERSEC will send a courtesy e-mail notification to the Contractor and the COR identifying the e-QIP email from DCSA including detailed instructions regarding completion of the BI application process and the level of background that was requested. Upon receipt of required background investigative documents, VBA PERSEC will review the background investigative documents for completion and initiate the background investigation by forwarding the background investigative documents to OPM to conduct the BI. If the background documents are not complete, VBA PERSEC will notify the Contractor and COR of deficiencies and include corrective instructions. VBA PERSEC will pay for background investigations and reciprocals processed through the VA PSAC and conducted by OPM in advance. The COR will notify and forward the Contractor a copy of the Certificate of Investigation when the BI has been favorably adjudicated or a Certificate of Eligibility (Form 4236) if the investigation has been reciprocated. The COR will also notify the Contractor of an unfavorable adjudication by the Government. Training a. All Contractor and sub-contractor personnel requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and networks: Sign and acknowledge understanding of and responsibilities for compliance with the National Rules of Behavior related to access to VA information and information systems. 2) Successfully complete any cyber security and privacy training as required for VA personnel with equivalent information and/or system access.
b. The Contractor shall provide to the Contracting Officer a copy of the training certificates and signed Rules of Behavior for each applicable employee within one week days from the date TMS access is granted and annually thereafter, as required. These online courses are located at https://www.tms.va.gov/learning/user/login.jsp.

More opportunities from Department Of Veterans Affairs → Veterans Benefits Administration (36C10D)

Same awarding agency

NAICS: 624310
New
Federal
U006--VR&E Self-Employment Services RFI
Solicitation # 36C10D27Q0008
The Department of Veterans Affairs, Veterans Benefits Administration, is issuing a Request for Information to explore industry partnerships for Veteran Readiness and Employment self-employment services. This initiative aims to support eligible veterans with service-connected disabilities in achieving vocational goals through entrepreneurship and small business ownership. The government is seeking information on how experienced partners can provide subject matter expertise in business planning, feasibility assessments, market research, financial planning, and startup incubation to supplement existing services. The goal is to identify scalable service delivery models that can assist veterans in evaluating business concepts and successfully launching sustainable enterprises. While this is not a formal solicitation for award, the government is considering a potential multiple-award IDIQ contract structure with individual awards for four specific regions: Northeast, Southeast, Continental, and Pacific. Interested organizations must provide their business size, socioeconomic status, past performance in entrepreneurial support, and their capacity to serve specific geographic areas using the provided Areas of Consideration Interest Form. Responses must be submitted to Contracting Officer Edward Bradford by November 25, 2026, and must adhere to a 10-page limit using Times New Roman, 12-point font.
Vocational Rehabilitation Services

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 332216
Federal
Tools for Veteran
Solicitation # 36C10D26Q0171
Solicitation 36C10D26Q0171 is a competitive Small Business set-aside request for quotation issued by the Department of Veterans Affairs for the procurement of brand-name Snap-on tools. This one-time, definite-quantity purchase order is specifically for a comprehensive set of automotive and mechanical tools, including socket sets, pliers, power kits, and diagnostic equipment, to be delivered to a Veteran's residential address in Malvern, Pennsylvania. The government has explicitly stated that this is a brand-name-only requirement, and no equal or substitute products will be accepted. All items must be delivered within 60 days of the receipt of the delivery order, and shipping costs must be included in the total quoted price. The award will be made as a single all-or-none purchase order to the responsible offeror whose proposal is most advantageous, with price and technical factors weighted equally. Technical evaluations are conducted on a pass/fail or acceptable/unacceptable basis, focusing on the offeror's ability to provide the exact part numbers and accessories listed in the technical specifications and their estimated delivery timeframes. Quotations must be submitted in three distinct volumes covering technical details, pricing, and administrative certifications. The final deadline for the receipt of offers is October 23, 2026, at 2:00 PM EDT.
Saw Blade and Handtool Manufacturing

POSTED

7 days ago

DEADLINE

in about 3 hours
View Details
NAICS: 333310
Federal
3550--Project Name: Veteran Self-Employment Plan – AI Vending Machines; Project Number: None; and Station Location: Sioux Falls, South Dakota, Veterans Affairs Regional Office (VARO), Veteran Readiness and Employment (VR&E) Division
Solicitation # 36C10D27Q0007
Solicitation 36C10D27Q0007 is a Request for Quotation issued by the Department of Veterans Affairs, Veterans Benefits Administration, for the acquisition of nine artificially intelligent-based vending machines. This requirement supports a Veteran Self-Employment Rehabilitation Plan in the automated retail industry, with the equipment being delivered to Rapid City, South Dakota. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope includes the delivery of various AI smart coolers, including compact single-door, high-capacity with freezer capabilities, premium single-door, and large double-door models. All equipment must be new commercial-off-the-shelf products meeting the minimum salient characteristics defined in the Statement of Work. The contract will be awarded as a Firm-Fixed-Price Purchase Order using the lowest-price technically acceptable (LPTA) methodology. Technical acceptability is based on the product specifications for the machines, while price evaluation considers the total proposed cost across all contract line items. The period of performance is ninety calendar days from the receipt of the purchase order. Due to the lack of a loading dock at the delivery site, the contractor is required to provide a vehicle equipped with a liftgate for offloading. Payments will be processed electronically via the VA's Electronic Invoice Presentment and Payment System.
Commercial and Service Industry Machinery Manufacturing

POSTED

9 days ago

DEADLINE

in 5 days
View Details
NAICS: 333914
Federal
Mobile Spray Polyurethane Foam (SPF) Application System Intergration
Solicitation # 36C10D26Q0209
The Department of Veterans Affairs, through the Veterans Benefits Administration, is soliciting quotations for a firm-fixed-price purchase order to deliver a fully integrated and operational Mobile Spray Polyurethane Foam (SPF) Application System. This project supports a Veteran's self-employment services plan under the Lincoln VA Regional Benefit Office in Nebraska. The selected contractor will be responsible for transforming a Veteran-furnished trailer and previously acquired equipment into a turnkey end item. This scope includes the procurement of additional brand-name or equal equipment—such as a proportioner package, transfer pump, spray gun, compressor, diesel generator, and vacuum system—as well as the necessary design, layout, integration, configuration, testing, commissioning, and hands-on training for the Veteran. Award will be based on the best overall value, with technical factors weighted significantly more than price. Technical evaluations will focus on the proposed design, adherence to safety and regulatory standards—specifically OSHA, NIOSH, and NFPA requirements for isocyanate handling and electrical safety—and the robustness of the testing methodology. The total period of performance is limited to 30 calendar days following the delivery of the trailer to the installation site. Final acceptance and payment are contingent upon a successful operational demonstration, the delivery of a complete as-built documentation package, and written verification of training. Verified Veteran-Owned Small Businesses (VOSB) may receive a 3.0% price reduction for evaluation purposes.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

28 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS