Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Jackie Robinson Community Center Improvements (Interior)

Closed
2026-IFB-LM-0057State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Station 14 Flooring Renovation
Solicitation # 2627-02
The San Miguel Consolidated Fire Protection District is soliciting bids under IFB 2627-02 for the flooring renovation of Station 14 located at 3255 Helix St., Spring Valley, California. The project requires a contractor to provide all labor, materials, and equipment to remove 2,277 square feet of carpet, 292 square feet of VCT, and 792 linear feet of wall base. The scope of work includes installing a finished polished concrete flooring system across 2,529 square feet, installing 792 linear feet of new black rubber wall base, and 26 linear feet of flooring transitions. The contract will be awarded to the lowest responsive and responsible bidder, with the project being managed by Division Chief Brian Lieberman. Bidders must submit a sealed hard copy package by November 10, 2026, at 2:00 p.m. PST, including a completed bid form, bid security, and several mandatory certifications. Required documentation includes certifications for workers compensation, asbestos-free materials, recycled content, a drug-free workplace, and California Air Resources Board compliance, as well as registration as a public works contractor. The selected contractor must adhere to prevailing wage rates, provide performance and payment bonds, and ensure all work complies with ADA regulations. Additionally, the contractor must coordinate high-noise activities to avoid interfering with firefighter rest periods and ensure that emergency response capabilities and apparatus routes remain unobstructed at all times.
San Miguel Consolidated Fire Protection District

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 238330
New
SLED
Kitchen Flooring At Various Sites
Solicitation # 2026-27-102
Solicitation 2026-27-102 (Project 2026-27-13022) is a request for bids from the Temecula Valley Unified School District for the installation of epoxy floor coverings at five school site kitchens: Temecula Elementary, Rancho Elementary, Temecula Middle, Vail Ranch Middle, and James L Day Middle School. The scope of work includes the examination and preparation of existing flooring, necessary demolition, and the application of epoxy materials. The project is estimated to take place from June 7, 2027, to August 6, 2027. The contract will be awarded to the lowest responsive and responsible bidder, with the bidding deadline set for November 9, 2026, at 10:00 a.m. The project is governed by the California Uniform Public Construction Cost Accounting Act (CUPCCAA) and requires strict adherence to California Code of Regulations and DSA standards. Key requirements include a bid security of at least 10 percent of the bid amount, performance and payment bonds equal to 100 percent of the contract value, and the submission of a Site Safety Plan within 10 days of the Notice to Proceed. Contractors must comply with prevailing wage rates, provide CARB compliance certification, and submit mandatory forms including a DVBE participation statement and site visit certification. Technical specifications require shot blasting to achieve an ICRI CSP 4-5 profile and specific moisture testing per ASTM F2170 and F1869.
Temecula Valley Unified School District

POSTED

about 17 hours ago

DEADLINE

in 19 days
NAICS: 238330
New
SLED
FISH 321113
Solicitation # BD-26-1613-WHA04-WHA01-134638
The Watertown Housing Authority is soliciting sealed bids for a flooring overlay project at the Special Needs 689 development in Watertown, Massachusetts. The scope of work involves the removal and legal disposal of existing broadloom carpet, VCT flooring, and rubber stair coverings across two residential group home buildings. The project requires substrate conditioning and polymer-modified cement skim-coating over existing wood subfloors and hardwood floors, followed by the installation of new Luxury Vinyl Tile in all common areas, hallways, kitchens, and closets. Additionally, the contractor must install new one-piece rubber stair treads, risers, and landing coverings, as well as site-matched wood shoe molding to preserve existing baseboards. All work must adhere to design documents prepared by Studio 26 Design Collaborative, LLC, and comply with M.G.L. c.149 regulations regarding bidding and minimum wage rates. The estimated base bid for this open market contract is 53,950 dollars. Bids must be submitted electronically by 2:00 p.m. on November 12, 2026, as hard copy submissions will not be accepted. Each bid must include a deposit of at least five percent of the greatest possible bid amount payable to the Watertown Housing Authority. The project includes workforce participation benchmarks of 6.9 percent for women and 15.3 percent for minorities. For inspection appointments, interested parties should contact Jacqueline Weir at 617-923-3950.
WHA04 - Watertown Housing Authority

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract entails interior improvements at the Jackie Robinson Community Center (JRCC), focusing on several flooring and lighting upgrades. Specifically, the scope includes removing the existing carpeting on the auditorium stage and replacing it with approximately 200 square feet of new hardwood flooring, installing stage lighting at the auditorium stage, removing vinyl flooring in the kitchen area and replacing it with new tile flooring and matching tile cove base covering roughly 500 square feet, and replacing carpet in the meeting/waiting area and offices of room 100 with approximately 1,800 square feet of new vinyl tile flooring. The contractor is responsible for asbestos removal and abatement in accordance with local regulations as indicated by environmental testing results incorporated into the plans. The solicitation is issued by the City of Pasadena Public Works Department, Engineering, with a posted date of February 4, 2026, and a response deadline on March 11, 2026. The procurement process requires bidders to comply with various administrative requirements including subcontractor listings, vendor forms certifying equal employment opportunity and legal compliance, as well as bonding forms providing payment and faithful performance guarantees. Contractors must adhere to applicable federal, state, and local construction codes, ensure proper handling and verification of site conditions per the construction plans, and comply with California labor laws and the Pasadena Living Wage Ordinance. Communication is directed to designated City contacts including an Associate Engineer and Project Manager. The contract includes provisions for change orders and requires submission of Unique Entity Identifiers and relevant experience documentation to support bidder qualifications. Overall, the project prioritizes safety, regulatory compliance, and quality workmanship to deliver a modernized and code-compliant community center interior.

General Info

Interior upgrades at JRCC include flooring replacements, stage lighting, asbestos abatement, and compliance requirements.

Documents

11

City of Pasadena Master Labor & Materials Contract Template

PDF, High priority: read this first15 pages · contract-document
High

Declaration of Non-Collusion and Vendor Forms for City of Pasadena Procurement

PDF, High priority: read this first6 pages · declaration-of-noncollusion
High

DoIT Technical Assessment Questionnaire Rev 20210806

XLSX, High priority: read this first5 pages · technical-questionnaire
High

Interior Improvements Plans for Jackie Robinson Community Center

PDF, High priority: read this firstspecifications
High

Jackie Robinson Community Center Improvements (Interior) IFB 2026-IFB-LM-0057

PDF, High priority: read this first51 pages · ifb
High

Relevant Experience Form for Bid Submission

PDF, High priority: read this first5 pages · past-performance
High

City of Pasadena Unique Entity Identifier Submission Form

PDF, Low priority1 page · other
Low

Faithful Performance Bond Form for City of Pasadena Contract

PDF, Low priority1 page · performance-bond
Low

Material and Labor Bond Form for City of Pasadena Contract

PDF, Low priority1 page · bond-form
Low

Standard Form-LLL Disclosure of Lobbying Activities

PDF, Low priority3 pages · disclosure-of-lobbying-activities
Low

Subcontractor Listing and Shoring Design

PDF, Low priority1 page · subcontractor-listing
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department, Engineering
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Tony EskandaryAssociate Engineer
Antonio WatsonProject Manager

Interested Companies (22)

TDV InnovationsNorth Hollywood, CA
Design MaterialsPasadena, CA
ProSpectra Contract FlooringPOWAY, CA

See All 22 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Jackie Robinson Community Center (JRCC) interior improvements include removing existing carpet at the auditorium stage stage and replace with new hardwood flooring (200 sf +-), providing stage lighting for the auditorium stage, removing existing vinyl flooring at the kitchen and replacing with new tile flooring with matching tile cove base (500 sf +-) and removing existing carpet at the meeting/waiting area and offices at room 100 area and replacing with new vinyl tile flooring (1,800 sf +-), per plans. Contractor is responsible for removal of asbestos containing material and abatement per local regulations; per environmental testing results shown on plans.

More opportunities from California → Public Works Department, Engineering

Same awarding agency

NAICS: 423610
SLED
Street Light Poles And Fixtures Restocking Multi-Year
Solicitation # 2026-IFB-MS-0532
The City of Pasadena Public Works Department, Engineering, is seeking bids for solicitation 2026-IFB-MS-0532 to establish a multi-year purchase order for the as-needed procurement of streetlight poles, LED fixtures, and related restocking equipment. The contract will have an initial term of three years from the date of execution with no optional extensions. Deliverables include various Caltrans aluminum and steel poles, concrete poles, and specific LED fixtures, all of which must be delivered in new and unused condition to the Street Lights and Traffic Signals facility at the Pasadena City yards. Deliveries are restricted to Monday through Thursday between 7:00 a.m. and 3:00 p.m., requiring 24-hour prior notification. The City has allocated a shipping cost cap of 20,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest grand total price. Bidders must submit their proposals via the City's eProcurement Portal by 2:00 p.m. on October 29, 2026, and must provide a Unique Entity Identifier (UEI) to be considered responsive. Required certifications include compliance with equal opportunity employment, non-collusion, and a 30 percent minimum recycled content requirement. Vendors must maintain a minimum Commercial General Liability insurance limit of 2,000,000 dollars per occurrence. While the contract is as-needed with no guaranteed minimums, the contractor may request unit price increases after the first year, capped at the regional Consumer Price Index.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

13 days ago

DEADLINE

in 8 days
View Details
NAICS: 423610
SLED
CDBG ADA Push Buttons Upgrades
Solicitation # 2026-IFB-MS-0467
The City of Pasadena Department of Public Works is soliciting bids for the material procurement of Americans with Disabilities Act (ADA) accessible pedestrian signal (APS) push buttons, control units for traffic signal cabinets, and miscellaneous appurtenant items. This project is funded by the Community Development Block Grant (CDBG) and requires materials to meet specific technical standards, including Caltrans 2024 Standard Plan ES-7A for posts and City of Pasadena Standard Plan S-973 for pull boxes. Deliverables include 4'6" high posts and 1.5" hot-dip galvanized rigid steel conduit, with all power supplies requiring CE/UL certification. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total price submitted via the City's eProcurement Portal by October 28, 2026. The contract is subject to stringent federal and state regulations, most notably the Build America, Buy America Act (BABA), which mandates that iron, steel, and construction materials be produced in the United States. Contractors must comply with the higher of the applicable federal or state prevailing wage rates and adhere to the Contract Work Hours and Safety Standards Act for contracts exceeding $100,000. Additional requirements include maintaining a minimum Commercial General Liability insurance limit of $2,000,000 per occurrence, providing a Unique Entity Identifier (UEI) via SAM.gov, and certifying compliance with non-collusion and equal opportunity employment practices. The initial term of the contract is one year from the date of execution, with deliveries made FOB Destination to the Pasadena City Yards.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

13 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)
Solicitation # 2026-RFP-0213
The City of Pasadena Public Works Department, Engineering division, is soliciting proposals for construction management services for the Holly Street Bridge Seismic Retrofit and Rehabilitation Project. This federally funded initiative, supported by the Highway Bridge Program, involves the rehabilitation and seismic retrofitting of a structurally deficient 1925 concrete arch-deck bridge over the Arroyo Seco channel. The scope of work includes on-site inspection and materials testing, with a critical requirement that all work be completed and the bridge fully reopened to public vehicular traffic by April 30, 2028, in preparation for the LA28 Olympic Games. Construction is estimated to last between 12 and 18 months, and the project mandates strict adherence to the Secretary of the Interior’s Rehabilitation Standards for historic preservation, as well as Caltrans and City of Pasadena codes. Proposals must be submitted electronically via the City's eProcurement Portal by October 29, 2026, at 2:00 PM ET, followed by the submission of one signed original and four bound hard copies within three business days. The selection process is competitive and based on total average points, evaluating technical qualifications and price separately. Key evaluation factors include the proposer's experience with similar projects, familiarity with the Highway Bridge Program, and the qualifications of the designated Construction Manager. Bidders must provide a lump-sum price proposal in a separate sealed envelope and must hold a California Professional Engineer License. Compliance requirements are extensive, including federal-aid contract provisions, Buy America standards, prevailing wage laws, and various certifications regarding non-collusion, lobbying, and equal employment opportunity.
Engineering Services

POSTED

14 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS