James Cancer Center - Community Facilities
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Ohio State University is seeking qualifications for architectural and engineering services for the James Cancer Center Community Facilities project, identified as project number OSU-265987. The scope involves creating a standardized design model for future cancer-focused community facilities, including full design for the first two sites. Key responsibilities include site feasibility evaluation, program verification, and the adaptation of a conceptual exterior facade to align with the main campus aesthetic. The project requires specialized expertise in cancer center design, including infusion suites, pharmacy design meeting USP requirements, and linear accelerator vaults. The project must be executed within a collaborative BIM-enabled environment adhering to the university's BIM Project Delivery Standards, with specific requirements for model authoring, clash prevention, and asset tagging. While the initial contract covers schematic design and design development, it may be amended to include construction documents, bidding, and post-construction services. The selected firm must comply with University Sustainability Standards, the EDGE program, and specific medical center policies regarding health and safety. During construction, the firm is required to provide at least 80 hours of on-site administration per week.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Ohio State University requests qualifications for architectural/engineering (AE) services with all required consultants necessary to complete the James Cancer Center – Community Facilities project. This project will advance the planning and design for James Cancer Center facilities, creating a standardized model for future cancer-focused community facilities including full design for the construction of the first two sites. This will include site feasibility evaluation, program verification and optimal design approach to ensure future adaptability and scalability. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.1.2. Model Authoring – Design Intent BIMs (Required for the architectural team, preferred for the engineering team) 2.3.2. Existing Conditions Documentation/Modeling 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis X 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs X 2.4.2. Model Authoring – Shop/Fabrication BIMs 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) Design BIM Use Case Required Additional Notes 2.4.5. Model-based Estimating (Quantification/Cost Estimating) 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The Ohio State University Wexner Medical Center (WMC) has prepared a preliminary program for cancer-focused community care buildings which the selected A/E will be required to validate. The validated program will form the basis for the preparation of the preliminary construction estimates for the buildings. WMC has also prepared a conceptual exterior façade design for the buildings which the selected A/E will be expected to critique, modify, and otherwise adapt, provided the recommended exterior façade reflects design elements consistent with the James Cancer Hospital at WMC’s main campus. The project has been approved for design services only. The initial contract sum will be for the Registered Design Professionals (A/E) to provide schematic design and design development drawings. The university may amend the A/E contract upon approval to complete the design development drawings, construction documents, bidding, construction contract administration, and post-construction services. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A – A/E Terms and Conditions Article 7.2.6. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 80 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the University’s Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The A/E will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The A/E is responsible for all costs incurred related to compliance with these policies. Please list all major scope services needed to complete the selection process for successful project delivery. The specific scope of services must state particular building types, functional design or specialized professional services required to evaluate the level of experience of each applicant firm (e.g., parking garage, kitchen design, correctional facility, medical facility). The scope of services should also define the types of basic and additional professional design and administration services necessary for the project (e.g. University Sustainability Standards, as applicable, previous experience with local jurisdiction or similar sites, previous experience working with the State of Ohio, Building Information Modeling (“BIM”) experience and training, specific BIM and Owner-defined requirements, level of development to be achieved within BIM models, BIM deliverables, and Owner’s intended use of BIM models after construction). This information will be used by each applicant to populate the Relevant Project Experience Matrix in Section F of Form F110-330. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Cancer Center Exterior Design 2. Design of Interior Elements (e.g. infusion suites, procedure rooms, registration, patient rooms, etc.) 3. Pharmacy Design Including USP Requirements 4. Linear Accelerator Vaults 5. Sustainable Design Experience 6. Projects delivered in a collaborative BIM-enabled environment For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must be designed by the Lead Firm.
Similar Contracts
Same NAICS industry code
More opportunities from The Ohio State University
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
