Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

John Day Dam Powerhouse HVAC Upgrade Industry Day

Closed
W9127N25R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 2 days
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 8 hours ago

DEADLINE

in about 21 hours
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 17 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Rufus, OR, 97050, USA

Set-Aside

NONE

Documents

9

JDP HVAC Upgrades - Architectural Drawings

PDF, High priority: read this first6 pages · specifications
High

JDP HVAC Upgrades - Electrical Drawings

PDF, High priority: read this firstspecifications
High

JDP HVAC Upgrades - HVAC Fire Detection Schematic (FA601)

PDF, High priority: read this first4 pages · specifications
High

JDP HVAC Upgrades - Mechanical and Controls Drawings

PDF, High priority: read this first10 pages · specifications
High

JDP HVAC Upgrades - Mechanical and Piping Drawings

PDF, High priority: read this first8 pages · specifications
High

JDP HVAC Upgrades - Mechanical Drawings (90% Submittal)

PDF, High priority: read this first25 pages · specifications
High

John Day Powerhouse HVAC Repairs - General Drawings

PDF, High priority: read this firstspecifications
High

John Day Powerhouse I HVAC Upgrades - Project Manual (90% Review)

PDF, High priority: read this first1022 pages · specifications
High

John Day Dam Powerhouse HVAC Upgrade Site Visit Attendee Roster (W9127N250001)

PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

event

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Notice updated

The notice title changed. The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Andrea Smothers

Full Description

Show more
***31-OCT-2024*** Adding Industry Day Attendee Roster An Industry Day will be held for the subject project at John Day Dam at 10:00 A.M. on 23-OCT-2024. This Industry Dayt is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. Reponses to this Industry Day announcement will be used by the Government to make business decisions and to inform the potential future solicitations and help industry to get a better understanding of the project Scope of Work (SOW). The North American Industrial Classification Code (NAICS) for this requirement is: 238220 - Plumbing, Heating, and Air-Conditioning Contractors The related size standard is: $19,000,000. Formal Industry Day Response Due - 16-OCT-2024 at 10:00 am PST. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for 10:00 AM PDT on 23 OCT 2024. (c) Participants will meet a John Day Dam located at: John Day Dam Exit 109 from I-84 John Day Dam Rd Rufus, OR 97050 Requirements: There will be only one site visit offered. Offerors planning to attend must register for this site visit by sending an email to the following individuals: Andrew Sprys (Andrew.J.Sprys@usace.army.mil) Andrea Smothers (Andrea.K.Smothers@usace.army.mil) Hard hats and steel-toed boots are required. Please observe all posted speed limits while at the project. In order to attend the site visit each individual participant's registration must be received by: In order to attend the site visit each individual participant's registration must be received by: ASAP. Site visit attendees must provide the following information: Solicitation Number W9127N25R0001 Project Title: John Day Dam Powerhouse HVAC Replacement Name(s) of individual(s) attending site visit: Name of Company: Phone Number: Email Address: Are all individuals U.S. Citizens? **Non-U.S. citizens may attend this site visit if they have a valid Foreign Visitor Authorization (FVA). Personally Identifiable Information will be very closely held in accordance with Army policy. Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project. Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, - Personal Protective and Safety Equipment. It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. (End of provision) Project Background. The John Day Powerhouse is internally conditioned and ventilated via a mixture of HVAC systems. Most of the existing systems are remnants of the Powerhouse's original construction (over 50 years ago) except for miscellaneous modifications and repairs performed over the years (Gate Repair Pit modifications, liquid chiller replacements, etc.). The current overall state of the existing HVAC systems is considered poor. Numerous key components have either completely failed (liquid chiller, electrostatic filtration units, pneumatic controls) or are on the verge of failing (pumps, control valves, isolation valves). The failure of the pneumatic controls is one of the more significant issues plaguing the facility. O&M personnel are having to manually control the Powerhouse's main ventilation system (modulate outside air intakes, manually switchover modes of operation (heating or cooling), etc.). This loss of automation is producing poor system performance and in turn is requiring increased O&M support. To add to these issues, few systems comply with current codes and standards including the life safety and fire protection type. Missing smoke detection, unprotected floor penetrations, missing refrigerant monitoring systems, lack of automatic HVAC shutdown capabilities during a smoke/fire event and improper Battery Storage exhaust are just a few examples. Additionally, space usage and occupancy have both changed over the years and each have had negative impacts on the HVAC systems (original ventilation pathways cutoff, increased cooling demands on the systems, etc.). Project Scope. The following information represents the project objectives: This project firstly entails complete replacement of the primary and installation of secondary chillers on two chilled water loops that cool the majority of the powerhouse galleries. The scrapping of the old system and the installation of new chiller skid packages (four skids amounting to nearly 600 tons refrigeration), electrical feeds, chilled water pumps, piping, installation and air handler units is scoped, with re-use of certain elements of these systems based on provided designs in combination with replacement. These systems must be tied into a new automated HVAC control system. While the existing systems are water cooled, only half of the new systems will be water-cooled, so roof-mounted air-cooled condensers in a new location and new installation with all necessary building penetrations, pass-thrus and piping are part of the scope for this work. Secondly, additional work comprises the modification of the HVAC system into a comprehensive smoke removal system for the powerhouse, including intake and outtake ducting and systematic fire protection measures at all penetrations. This work must include integration of the HVAC controls with the building fire protection system. The HVAC controls must be a comprehensive integrated digital control system replacing all existing pneumatic control systems. Free cooling with passive outside air during cold nights common to the region of Rufus, Oregon and for outside air for smoke ventilation entail the scope including modifications to existing intakes and louvers and building penetrations. Thirdly, small scale HVAC units such as mini-splits will be provided for local cooling and heating requirements in specific spaces. These units will require their own electrical supplies, pipe runs, insulation and penetrations. These units must also report data to the central HVAC control system. Comprehensive smoke control must be provided as part of the work. The proposed system must be constructed in an active, operational powerhouse with 6000A, 13.8kV busbars and other heavy electrical equipment, including at levels below headwater where nuisance water intrusion risks are present. Pumps in certain areas must remain operational during the planned work, resulting in noise hazards. The existing fire suppression system must remain active during the planned work. Work includes installation work for ductwork and work to protect floor penetrations in relatively close proximity to electrical busbars so that delineation and safety control of work sites is a priority. Newly installed systems must future-proof the installation against future refrigerant phase-outs. Work involves extensive structural penetrations and structural modifications necessary to support these penetrations, both permanent penetrations for ductwork and plenums and temporary removal of wall sections to remove old equipment and install new equipment. Finally, temporary cooling must be provided to the powerhouse during the full scope of the work, at approximately 50% of the rated tonnage capacity of the chilled water system. This will entail portable skid mounted chillers located externally to the powerhouse with temporary pass-thrus for their electrical supply from the powerhouse, and for making connections for chilled water piping to the existing internal powerhouse pipes, with cut-overs as the work progresses. Anticipated Construction Schedule: CENWP intends to advertise (02/2025) and award (05/2025) Construction Contract with estimated construction completion by the end of calendar year (TBD). Estimated Construction Cost (ECC): The current ECC is between $25,000,000 and $100,000,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude. Number and Type of Contracts: NWP contemplates awarding a Firm Fixed Price Construction Contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels. Anticipated Source Selection Process: The expected method to determine the best value to the government is Best Value Trade Off. Project Specific Constraints and Challenges: This project requires at least 50% of the cooling systems to remain operational at any time using temporary chillers which must be sourced and connected to the existing chilled water system by the contractor. This project requires working in an active powerhouse including installation of ductwork in galleries supporting high voltage busbars and electrical transmission. Power production will not cease during the HVAC work. This project requires working around critical industrial control systems and fire suppression systems without fully inactivating those systems. The project will include a fixed cost line item for asbestos remediation and lead testing, as it is expected that asbestos will be found during surveying before work commences. The project requires installation of a range of HVAC systems depending on the specific space; it is possible that the skillsets between some of the installations (single room minisplits and 200-TR chilled water systems) are sufficiently different that they will need completely different sets of specialists. Significant structural penetrations of massive concrete walls in the powerhouse must be conducted as part of the ducting work, and on a temporary basis for the removal and installation of certain chiller packages and fan assemblies. The HVAC system will also serve smoke removal ventilation functions and must be linked to the fire alarm and suppression control system, which meets strict DOD security requirements. Questions for Industry: Is there anything in our SOW that would discourage you from bidding? Is there anything in our SOW that would cause enhanced pricing uncertainty? Are there any market conditions or industry practices that you feel the government needs to be aware of? Submission Instructions. Formal responses to this Industry Day notice must be submitted electronically (via email) with SUBJECT: Sources Sought - W9127N25R0001. Please email to Andrea Smothers, Contracting Officer, at Andrea.K.Smothers@usace.army.mil and Andrew Sprys Contract Specialist, at Andrew.J.Sprys@usace.army.mil before 10:00 am Pacific Standard time on 16-OCT-2024. Interested parties responses to this Industry Day notice shall be limited to six (6) pages and shall include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. A description of work performed under similar project constraints and challenges listed under paragraph 3. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1), (List the critical elements required) project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: List of critical elements required for project submission from Industry for review of technical capabilities: Critical Element One: Experience with industrial scale Chilled Water system retrofits. Critical Element Two: Experience with structural modifications to massive concrete buildings Critical Element Three: Experience conducting major reconstruction and retrofit to facilities remaining occupied and in-production while the retrofit is ongoing. Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date Customer satisfaction The Government may verify information in CPARS or PPIRS. Firm's Joint Venture information if applicable - existing and potential. Firm's Bonding Capability in the form of a letter from Surety. Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates) Responses to the government's questions in paragraph 5 and any other information the contractor feels the government needs to be aware of. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Industry Day notice or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project in Cascade Locks, Oregon, is a total small business set-aside procurement issued by the USACE Portland District. The project involves replacing a seismically deficient 248-foot swing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, shoulders, and a sidewalk. The scope includes partial demolition of the existing structure, construction of a concrete stub abutment anchored into rock and a south abutment supported by drilled shafts, and the development of approach roadways. Due to the requirement for continuous vehicular access, the work will likely be performed in phases and must adhere to strict environmental and seasonal restrictions, including specific in-water work windows for 2029 and 2030. The contract is a firm-fixed price agreement with a performance period of 1,295 calendar days from the notice to proceed. Key technical requirements include lead and asbestos removal, barge crane lifting near high-voltage power lines, and compliance with CMMC Level 1 cybersecurity standards. Specialized qualifications are required for ground anchors, jet grouting, and professional archaeological monitoring. The project is subject to rigorous quality control and inspection processes, including a three-stage sequence of punch-out, pre-final, and final acceptance inspections. Bidders must provide a bid guarantee and 100 percent performance and payment bonds. The final solicitation closing date was extended to October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 484220
Federal
Pre-Solicitation Notice - Bonneville Dam Equipment Transport Blanket Purchase Agreement (BPA)
Solicitation # W9127N27A0001
The U.S. Army Corps of Engineers, Northwestern Division, Portland District intends to establish a Blanket Purchase Agreement (BPA) for commercial equipment transport services at the Bonneville Lock and Dam. This 100% small business set-aside, categorized under NAICS 484220, involves the on-call transport of light to heavy-haul equipment, ranging from 1.5 to 60 tons, between facilities on the Oregon and Washington shores via public highways. The agreement will span a five-year ordering period with an estimated annual volume of 60,000 dollars and a total potential value of up to 300,000 dollars. Selected BPA holders will be required to provide DOT-compliant vehicles and manage all route planning, including obtaining necessary permits from local, state, and federal authorities. Performance standards include a standard response time of 48 hours and a best-effort emergency response within 12 hours. For call orders under 2,500 dollars, selection will be based primarily on cost and availability with payment via credit card; orders exceeding 2,500 dollars will be competed among BPA holders and paid via electronic invoice. Contractors must maintain current insurance, adhere to FMCSA securement regulations, and submit a Quality Control Plan for government approval prior to the post-award conference.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

14 days ago

DEADLINE

in about 21 hours
View Details
NAICS: 238220
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

19 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS