This Solicitation opportunity from Department Of Defense was posted on March 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JUNCTION BOX

Closed
N0010425QZC36Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332710
New
Federal
59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QYAFE
Solicitation NO0014-26-Q-YAFE, issued by NAVSUP Weapon Systems Support, seeks quotations for the teardown, evaluation, repair, and potential modification of electrical chassis (NSN 7HH 5975-01-689-3871). The objective is to restore Government Furnished Property to an operable condition, defined as functioning and performing as a new unit. The requested Repair Turn Around Time (RTAT) is 39 days, and the government reserves the right to exercise an option for increased quantity up to 100 percent of the initial requirement within 365 days of award. The closing date for submissions is October 23, 2026, at 4:30 PM local time. Offerors must provide an estimated repair price for the full effort and include the cost of new items for evaluation purposes. Following the receipt of carcasses, vendors have 90 days to complete a teardown and evaluation before submitting a firm-fixed-price quote. If the offeror is not the Original Equipment Manufacturer, they must provide the OEM's name, CAGE code, and a signed letter of authorization. Technical requirements include strict adherence to MIL-STD-130 for marking, MIL-STD-2073-1 for packaging, and a total prohibition of metallic mercury. Award evaluations will consider price, capacity constraints, and risk assessments via the Supplier Performance Risk System. All payments will be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support Mech

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the refurbishment and repair of a critical junction box used in vital shipboard systems, emphasizing strict quality and safety standards due to the high-risk nature of the component. The work includes detailed inspection, evaluation, and refurbishment to meet specified military and industry standards, with a focus on maintaining traceability, compliance with applicable drawings and specifications, and ensuring the integrity of all threaded and pressure-tested parts. The contract mandates a firm fixed price for the complete repair process, including teardown, evaluation, and restoring the item to a "like new" condition, with provisions for submitting beyond repair or economic repair prices. The contract also specifies comprehensive quality assurance requirements, including adherence to ISO-9001 or equivalent standards, detailed inspection and testing procedures, documentation, and certification processes. It highlights the importance of proper packaging, preservation, and marking, especially for Special Emphasis (Critical Safety) items, and outlines procedures for handling government-furnished materials, deviations, waivers, and engineering changes. The scope underscores the critical safety implications, requiring rigorous control, documentation, and approval processes to prevent failures that could jeopardize personnel safety or ship integrity. The solicitation is managed by the Naval Surface Warfare Systems Support in Mechanicsburg, PA, with detailed submission and inspection protocols to ensure compliance and quality throughout the repair process.

General Info

Repair and refurbishment of critical Navy Junction Box with strict military quality and documentation requirements.

NAICS

332710 - Machine Shops

Place of Performance

PA

Set-Aside

NONE

Documents

13

Amendment 0001 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0007 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0008 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0009 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0010 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0011 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

Amendment 0012 to Solicitation NO0104-25-Q-ZC36

PDF, High priority: read this firstamendment
High

RFQ NO0014-25-QZC36 - Junction Box Repair

PDF, High priority: read this firstrfq
High

Solicitation NO0104-25-Q-ZC36 Amendment 0003

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

29 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 19, 2025 to Jun 2, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 2, 2025 to Jun 20, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 20, 2025 to Aug 8, 2025. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 8, 2025 to Sep 10, 2025.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 10, 2025 to Oct 7, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 7, 2025 to Jan 30, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 30, 2026 to Feb 6, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 6, 2026 to Feb 20, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 20, 2026 to Mar 27, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N742.11| WWJ|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|See schedule|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332710|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| POC code updated. All else unchanged. \ 1. The purpose of this amendment is to dissolve the small business set-aside. 2. All else remains unchanged. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt Final delivery of material (235 days) 4. Drawings associated with this solicitation will be made available on the new beta.SAM website, but will be restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 5. Quote to be a firm fixed price for the full repair of the item. This includes the teardown, evaluation, inspection and full repair of the item to "like new" or "A" condition. See statement of work in solicitation. 6. A beyond repair (BR)/ beyond economic repair (BER) price shall also beprovided in addition to the repair price at time submission of quote. 7. Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. 8. This contract utilizes Commercial Asset Visibility (CAV). See clause NAVSUPWSSFA24 for further details. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;JUNCTION BOX; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-3 |96169| C|SP |D|0001 | C|00000|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this Contract, including all testing and military specification requirements. 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;General Dynamics Electric Boat Division Specification S-5343934-3, Part NumberS-5343934-3/1-101, CSD303, and CSD393; , except as amplified or modified herein. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD303 and CSD393; in ECDS at https://register.nslc.navy.mil/ 3.3 ;MIL-DTL-24231 and all applicable specification sheets must supersede MIL-C-24231 as referenced in General Dynamics Electric Boat Division Specification S-5343934-3.; 3.4 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.4.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.4.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.4.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.5 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.9.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.9.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.9.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.9.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.11 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.11.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.11.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.11.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.11.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.11.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.12 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.12.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.12.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.13 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.14 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.14.1 Visual examination upon receipt to detect damage during transit. 3.14.2 Inspection for completeness and proper type. 3.14.3 Verification of material quality received. 3.14.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.14.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.14.6 Identification and protection from improper use or disposition. 3.14.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.14.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.14.9 Material returned to the contractor must be handled as GFM. 3.15 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.15.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.16 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.16.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.16.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.17 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.17.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.17.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.17.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.18 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.19 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.19.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.19.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.19.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.19.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.19.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.19.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.19.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.20 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.21 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.21.1 Direct reading of O-ring surface diameters with specified standard. 3.22 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date of the person performing the test and must be maintained by the contractor in accordance with contract requirements. 5. Identification for each cable or lot of cables tested together and identified with component serial number to the objective quality evidence (test records held at manufactures facility). This is necessary to correlate the testing records to the cables tested. 6. Dielectric Strength Testing: Manufacturer is required to record the required and actual voltage, frequency, and duration. 7. Hydrostatic Testing: Manufacturer is required to identify the hydrostatic test duration and number of cycles (e.g. Cycle 1 - 3 X 100 +/-5 psig for 5 minutes) required and those actually accomplished during testing. Manufacturer is to record the results of Continuity Testing ,in addition to Insulation Resistance Testing, before and after Hydrostatic Testing. Low Voltage Insulation Resistance testing may be utilized when damage to the equipment is highly probable. 8. Manufacturer is required to document the required test value or parameter and test tolerance with which the testing is specified to be performed. This information comes from the Government Furnished Information (e.g. the specification or governing requirement document). When documenting the observed test pressure for cable lots, minimum and maximum pressure observed must be reported. 1. Manufacturer must indicate the required duration for testing as outlined by GFI and actual test duration witnessed at that time. 2. Manufacturer documentation must specify the required test medium as outlined by GFI as well as the actual test medium used for testing. 3. Manufacturer must include all reporting of allowable leakage specified within GFI in addition to actual leakage experienced during testing (when specified and allowed). 3.23 The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.23.1 All records generated by the manufacturer, which are used as the basis for completing the C of C, are required to be retained at the manufacturers facility for a minimum of seven years, or as noted by the requirements of the contractually invoked documents. 3.23.2 Manufacture's objective quality evidence documentation and reference data applicable to this contract are not required to be shipped as a deliverable, however these articles must be made available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;- 10/20/2016 - Updated ECDS URL - Sep 30 2008 - Thread Inspection Requirements were clarified - Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS - Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE - Dec 17 2011 - Moved Quality Assurance Text location for Readability - Jan 19 2011 - Added notification of DCMA upon contract award - Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section - Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; P/N: S-5343934-3/1 Assembly 101 DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: contact@example.gov No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt.

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 335313
New
Federal
KITE TERMINAL CONSO
Solicitation # N0010426QND93
Solicitation N0010426QND93 is a fixed-price request for quotations issued by the Navsup Weapon Systems Support for the teardown, evaluation, repair, and modification of 15 KITE TERMINAL CONSO units (NSN 5930-01-604-0750). The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. The response deadline has been extended to November 05, 2026. This requirement is processed under Emergency Acquisition Flexibilities and is certified for national defense under the Defense Priorities and Allocations System. The contractor must provide an estimated repair price and is required to submit a firm-fixed-price quote within 90 days of receiving the carcasses. A requested repair turn around time of 81.212 days is established, with price reductions applied for failure to meet this timeline. Technical requirements include strict adherence to original manufacturer specifications, MIL-STD-130 for physical identification, and MIL-STD-2073 for packaging. Additionally, the material must be mercury-free as it is intended for use on submarines and surface ships. Offerors who are not the original equipment manufacturer must provide a signed letter of authorization on the manufacturer's letterhead. Administrative requirements include the use of Wide Area Workflow for payments and mandatory reporting via the Commercial Asset Visibility Repairables Portal. The contract includes a one-year warranty from the date of delivery and requires the maintenance of inspection records for 365 days post-delivery. Delivery is set for 260 days after award, with destination points at DLA Distribution centers in Norfolk, Virginia, and San Diego, California.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 9 days
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QYAJB
Solicitation N0010426QYAJB is a fixed-price request for quotations issued by the Navsup Weapon Systems Support Mech for the teardown, evaluation, repair, and modification of a circuit card assembly, NSN 5998-01-577-3864. The contractor is required to perform all work in accordance with original manufacturer specifications and drawings, adhering to strict quality standards including ANSI/ESD S20.20 for electrostatic discharge control and a total prohibition of metallic mercury to prevent contamination on submarines and surface ships. Delivery is required within 111 days on a FOB Destination basis, with all items physically identified and packaged according to MIL-STD-129, MIL-STD-130, and MIL-STD-2073. Due to the nature of the equipment, the contractor must possess a government security clearance and authorized access to Secret level classified documents as detailed in DD Form 254. Award evaluations will be based on Supplier Performance Risk System assessments regarding item, price, and supplier risk. The contractor must maintain inspection records for 365 days following final delivery and utilize the Wide Area Workflow system for electronic invoicing. Additional compliance is required for cybersecurity maturity model certification and the detection and avoidance of counterfeit electronic parts.
Bare Printed Circuit Board Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 3 months
View Details
NAICS: 333998
New
Federal
51--GUN,SEALANT,20 OUNC
Solicitation # N0010426QAD20
Solicitation N00104-26-Q-AD20 is a total small business set-aside request for quotation issued by NAVSUP Weapon Systems Support Mechanicsburg for the manufacture of 10 units of a 20-ounce sealant gun, part number 6237090-001, cage 53711. This fixed-price procurement requires the contractor to provide all parts listed on the applicable technical drawings, which take precedence over the contract text in the event of a conflict. The delivery timeline is 90 days with shipping terms set as FOB Destination. Award will be granted to the responsible offeror submitting the lowest priced, technically acceptable offer, with a 10 percent price evaluation preference applied to HUBZone small business concerns. The contract mandates strict adherence to quality and safety standards, including required government source inspection per FAR 52.246-2 and marking in accordance with MIL-STD-130. Packaging must comply with MIL-STD-2073 and MIL-STD-129, with specific requirements for domestic and overseas shipping levels. Contractors must submit Safety Data Sheets and GHS compliant labels for any hazardous materials prior to award. Administrative requirements include the use of Wide Area Workflow for invoicing and payment, and compliance with CMMC unique identifier reporting for information systems. The closing date for the receipt of offers has been extended to November 6, 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 10 days
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB
Solicitation # N0010426QYAF8
Solicitation N0010426QYAF8, issued by the Department of the Navy's NAVSUP Weapon Systems Support Mech, is a request for quotations for the manufacture and delivery of a Circuit Card Assembly (NSN 5998-01-616-3772). The procurement requires strict adherence to Technical Data Package version 002 and mandates that the supplier maintain a quality system compliant with ISO 9001 or MIL-I-45208. Key technical requirements include compliance with ANSI/ESD S20.20 for electrostatic discharge control and a strict mercury-free mandate for use on submarines and surface ships. The contract includes an option for additional quantities up to 100 percent for 365 days after receipt of the order. The government will evaluate offers based on the Supplier Performance Risk System, focusing on item, price, and supplier risk, while prioritizing U.S.-made or qualifying country end products. Award consideration is limited to original equipment manufacturers or authorized distributors who can provide a signed letter of authorization. Deliverables must be marked per MIL-STD-129 and packaged according to MIL-STD-2073-1, with specific packing levels based on the destination. Inspection and acceptance will occur at the origin, and all payment requests must be processed electronically through the Wide Area Workflow system. Following two amendments, the final response deadline for offers is October 28, 2026.
Bare Printed Circuit Board Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 3 months
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0010426QND51
This solicitation, issued by NAVSUP Weapon Systems Support Mechanicsburg, seeks a contractor for the teardown, evaluation, repair, and modification of an electrical control panel (NSN 6110-01-554-5008). The requirement is pursued under Emergency Acquisition Flexibilities and is certified for national defense as a DO rated order. The contractor must provide an estimated repair price and a firm-fixed price quote within 90 days of receiving the carcass. A requested repair turn around time of 870 days is established, with specific price reductions applicable if this timeline is not met. The award will be made to a single offeror based on a best-value determination where past performance is considered more important than price. Key technical requirements include adherence to MIL-STD-130 for physical identification and MIL-STD-2073 for packaging. The material must be mercury-free, as it is intended for use on submarines or surface ships. The contract includes an option for the government to increase the quantity within 365 days of the award via modification. While originally a small business set-aside, the solicitation has been updated to unreviewed-unrestricted, and the deadline for receipt of offers has been extended to October 2, 2026. Payment and receiving reports must be processed electronically through the Wide Area Workflow system.
Motor and Generator Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS