Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

JUSTIFICATION AND APPROVAL FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

Active
N4008511C9813Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Naval Facilities Engineering Command Mid-Atlantic is seeking approval to use other than full and open competition to procure a feasibility study from Virginia Natural Gas (VNG), the sole local utility servicing the JEB Little Creek-Fort Story (JEBLCFS) area. This study is a crucial preliminary step in the development of a Utility Energy Service Contract (UESC) aimed at implementing energy efficiency measures across multiple buildings on the installations, including HVAC upgrades, lighting and water retrofits, and renewable energy installations. The study will identify feasible, cost-effective energy conservation measures, providing a detailed roadmap for the project's design and implementation. The initiative supports substantial energy savings and greenhouse gas emission reductions, with estimated annual savings near $595,828 and a simple payback period of approximately 7.75 years, exclusive of maintenance savings. VNG will finance the design and implementation costs, which the Navy will repay over 10 to 15 years after project completion. Due to VNG’s unique position as the sole regulated natural gas utility serving the JEBLCFS installations and its statutory authorization to perform UESC projects, it is the only responsible source capable of performing this feasibility study. Market research and a Notice of Intent soliciting other potential providers resulted in no responses besides VNG, justifying the non-competitive procurement under the relevant federal acquisition regulations. The contract price for the study will be negotiated to ensure fairness and reasonableness, using independent government estimates and historical data as benchmarks. While there are no current plans to competitively procure similar future studies, future UESC projects will be publicly announced to encourage competition where feasible, and VNG will be required to incorporate competitive procedures when selecting subcontractors and suppliers during project execution.

General Info

Navy contracts Virginia Natural Gas for exclusive energy feasibility study to improve JEB Little Creek installations.

NAICS

221210 - Natural Gas Distribution

Place of Performance

VA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
ContactsNo contacts available
OfficeNORFOLK, VA, 23511-0395, USA
Office AddressNORFOLK, VA, 23511-0395, USA
ContactsNo contact information available

Full Description

Show more
1. Contracting Activity. Naval Facilities Engineering Command, Mid- Atlantic, 9742 Maryland Avenue, Norfolk, Virginia 23511-3095 2. Description of the Action Being Approved. Request approval for the use of other than full and open competition to request a feasibility study from Virginia Natural Gas (VNG), in connection with the energy measures described in further detail below. VNG is the local utility company servicing Virginia, and is regulated by the Virginia State Corporation Commission. As discussed in detail below, this feasibility study is necessary to support a Utility Energy Service Contract (UESC) with VNG at JEBLCFS, whereby VNG will provide various incentives to the Government (including financing) in projects that will reduce energy consumption and install various improvements at JEBLCFS. As of the present time, funding has not been secured for the feasibility study, so a specific appropriation is not available for insertion into this document. The timeframe of the study is not finalized at this time. However, typical timeframes for similar feasibility studies are generally in the six-to-nine month range, from the date of the notice to proceed. 3. Description of Supplies/Services. The feasibility study is necessary prior to the design/implementation of a UESC project at JEBLCFS. Specifically, JEBLCFS has requested that NAVFAC Mid-Atlantic assist with a UESC project with VNG. This UESC project, pursuant to 10 U.S.C. 2913(d), will involve the reduction of energy consumption involving HVAC upgrades and retro-commissioning at twenty-nine (29) buildings, lighting retrofits at twenty-seven (27) buildings, water retrofits at twenty-seven (27) buildings, and renewables at twenty-one (21) buildings. The total area for this project is approximately 984 KSF to include 742 KSF at JEB Little Creek and 242 KSF at Fort Story. Eliminating buildings heated by fuel oil and switching to natural gas-fired systems and improvements to the building heating and controls are necessary in order to improve system efficiency and provide a long-term solution to the maintenance and reliability problems currently being experienced by JEBLCFS. As a result of the installation of these measures, the Navy will be moving toward its goals in regard to EISA and Executive Orders requiring reduction of green house gas emissions. Rough estimates show an annual energy savings of 17,461 MBTU or $595,828 and show a simple payback of 7.75 years, not including maintenance savings which will reduce payback time. VNG will advance financing costs for the design/implementation of the project, which will be repaid upon completion and acceptance of the project, over an agree-to period (approximately 10 to 15 years). Prior to the design/implementation of this UESC project, the Navy must procure a feasibility study, which is necessary to determine which ECMs are actually possible, cost effective, and will result in the savings that will ultimately pay for the UESC project. This feasibility study will provide the detailed “road map? for the ECMs and specific actions that will form the design/implementation of this UESC. The feasibility study is necessary prior to proceeding with the design/implementation of the UESC, and the feasibility study is thus a prerequisite for the necessary energy improvements to the above-referenced buildings at JEBLCFS. 4. Statutory Authority Permitting Other Than Full and Open Competition It is requested that other than full and open competition be permitted and implemented pursuant to 10 U.S.C. Section 2304(c)(1), as implemented by FAR 6.302-1, “Only one responsible source and no other supplies or services will satisfy agency requirements.? 5. Rationale Justifying Use of Cited Statutory Authority. VNG is the only regulated, local servicing gas utility company for the geographic area that includes JEBLCFS. Because of VNG’s status as the only regulated, local servicing gas utility for this installation, VNG is the only entity that would be able to actually perform the design and implementation of this UESC project. Specifically, VNG would be authorized under statute as a “utility? to perform the UESC project (see 10 U.S.C 2913(d)(1), authorizing agreements with “utilities?); and VNG would be the only entity practically able to perform the design and implementation of the ECMs discussed above. In this situation, VNG is the only responsible source that can perform the feasibility study necessary prior to the design/implementation of this UESC project. Specifically, because VNG is the current servicing utility and the entity that will actually design/implement the ECMs, VNG is the only entity that will be able to define the precise costs and technical requirements of the project. These precise costs and technical requirements are the essence of the feasibility study being procured by the Government, and due to the circumstances described above, the Government must obtain this information and the feasibility study from VNG. Thus, for the reasons set forth above, VNG is the only responsible source that can perform this particular feasibility study. 6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable. A Notice of Intent (NOI) was published in the Federal Business Opportunities (FEDBIZOPS) (https://www.fbo.gov/), with regard to the UESC project described above at JEBLCFS. The NOI synopsized the Government’s requirement and the intention to award a UESC contract, per 10 U.S.C. 2913(d). The NOI invited interested parties to identify their interest and ability to meet the requirements stated in the NOI, and to submit a corporate capabilities statement for consideration. VNG was the only utility to respond. This paragraph above describes the NOI with respect to the UESC project as a whole, but does not describe efforts with regard to the feasibility study which is the subject of this Justification and Approval (“J&A?). With regard to the feasibility study, under the circumstances described above, VNG is the only entity that can perform this particular study. VNG is the current servicing utility, and VNG is the only entity that will be able to provide the precise costs and technical requirements of the UESC project. Thus, other offerors would not be able to perform the feasibility study which is the subject of this J&A. With regard to market research, market research conducted has shown that VNG is the only regulated, local servicing gas utility company for the geographic area that includes JEBLCFS. In accordance with FAR 6.305, “Availability of the Justification?, this justification will be made available for public inspection. 7. Determination of Fair and Reasonable Cost. The contract price for the feasibility study will be negotiated. The Contracting Officer will determine the price for the feasibility study to be fair and reasonable prior to award of any contract. The Contracting Officer may use various means to ensure a fair and reasonable price, including but not limited to a comparison with an independent government estimate, and /or historical data regarding similar feasibility studies. 8. Actions to Remove Barriers to Future Competition. The contracting activity has no plans at this time to compete future contracts for the supplies/services covered by this document (feasibility studies for JEBLCFS UESC project). If another potential source emerges, the contracting activity will assess whether competition for future requirements for such items is feasible. For future UESC projects in general, a NOI would be generated for such UESC projects. This would allow interested sources to become involved in the UESC project as a whole. With regard to the feasibility study that is the subject of the J&A, the contract will require that VNG establish competitive procedures, acceptable to the Contracting Officer, in selection of subcontractors, suppliers, and third-party financiers.

Similar Contracts

Same NAICS industry code

NAICS: 221210
New
SLED
SUNY Schenectady Natural Gas Supply Services
Solicitation # 2140092
SUNY Schenectady is soliciting quotes through RFQ 2026-07 for the provision of fixed-price natural gas supply services. The college is seeking qualified suppliers and brokers to provide all-inclusive pricing on a per-therm basis for either a three-year or five-year contract term, with a projected start date of February 1, 2027. All accounts are located within NYISO Zone F in the National Grid/NIMO territory. The college prefers a dual billing arrangement where National Grid handles delivery billing and the selected supplier invoices separately for supply charges on Net 30 terms. No separate broker fees are permitted, as all compensation must be embedded in the per-therm rate. This procurement is conducted as a competitive sealed bid for a commodity purchase, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders are not required to submit a technical proposal but must provide a cost bid in a separate sealed envelope along with several mandatory certifications, including conflict of interest disclosures, non-collusive bidding certifications, and evidence of authorization to supply natural gas in New York State. The deadline for bid submissions is November 19, 2026, at 2:00 PM. Successful bidders must maintain industry-standard insurance and ensure all assigned staff execute non-disclosure agreements.
Schenectady County Community College

POSTED

7 days ago

DEADLINE

in 23 days
View Details
NAICS: 221210
Federal
REQUEST FOR QUOTES FOR DELIVERY OF LP GAS ABAORD MCB CAMP LEJEUNE, NC
Solicitation # M6700127Q0003
This requirements contract, solicitation number M6700127Q0003, is for the procurement and delivery of liquefied petroleum gas (LPG) and associated tank monitoring services for the Public Works Division at Marine Corps Base Camp Lejeune, North Carolina. The contractor is responsible for providing all necessary personnel, equipment, and approximately 225 to 250 contractor-owned tanks with capacities ranging from 250 to 30,000 gallons. Deliveries are to be made on an automatic refill basis to various locations aboard the complex. The overall period of performance runs from December 1, 2026, through May 31, 2031, with a firm-fixed price structure and a limitation that no individual task order shall exceed 1,800,000.00 dollars. The award will be based on price and other factors, with technical capability and delivery being more significant than price. Evaluation criteria include a capability statement, a minimum of three relevant past performance references from the last three years, and the ability to meet the specified period of performance. Invoicing must be processed through the Wide Area WorkFlow (WAWF) system, with a requirement to submit invoices within 15 days of service completion for verification. The contract is not set aside for small business concerns and falls under NAICS code 221210. Key regulatory requirements include adherence to Buy American standards, the submission of Safety Data Sheets for hazardous materials, and compliance with DFARS provisions regarding telecommunications equipment and the Maduro regime.
Commanding General

POSTED

11 days ago

DEADLINE

in 19 days
View Details

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION NEWPORT RI, NEWPORT RHODE ISLAND
Solicitation # N4008526R0228
Solicitation N4008526R0228 is a design-build task order issued by Naval Facilities Engineering Command Mid-Atlantic for the major renovation of the King Hall OTC Dorm Building 291 at Naval Station Newport, Rhode Island. The project involves a comprehensive overhaul of approximately 172,000 square feet of unoccupied space, with an estimated value between 100 million and 250 million dollars. The scope of work includes remedying hazardous materials and water infiltration, replacing the full roof, windows, and storefront entrances, repairing exterior masonry, and constructing a new fire lane. Internal upgrades feature the installation of a new passenger elevator, seismic structural improvements, and the reconfiguration of first-floor multi-purpose areas, including the relocation of the SMART clinic. Critical systems upgrades will address outdated mechanical, plumbing, electrical, and life safety systems, specifically incorporating NOTIFIER intelligent addressable fire alarm control panels. The contract is being awarded under the Global Contingency Construction Multiple Award Contract using a best value tradeoff process, evaluating technical solutions and past performance with equal importance, combined as equal to the total lump sum price. The period of performance is 1,278 calendar days from the date of award, with a proposed baseline award date of March 15, 2027. Liquidated damages for delays are set at 17,115.93 dollars per calendar day. Offerors must submit their proposals in PDF format via the Procurement Integrated Enterprise Environment by October 29, 2026. Key requirements include strict adherence to UFC/UFS/FC standards, EPA guidelines for PCB abatement, and specific radon mitigation testing and acceptance criteria.
Commercial and Institutional Building Construction

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation # N4008526R0138
Solicitation N4008526R0138 is a Firm-Fixed Price Design-Bid-Build construction contract issued by NAVFAC Mid-Atlantic for the P-1550 SOF Marine Raider Battalion Company and Team Facilities at Marine Corps Base Camp Lejeune, North Carolina. The project scope involves the construction of approximately 228,200 square feet of facilities, including a 73,400 square foot Battalion Operations, Supply, Communications, and Intel facility; 127,200 square feet of Company HQ and Team Facilities; and 17,600 square feet of Company Storage Buildings. The structures will be single-story steel frame buildings with brick veneer, standing seam metal roofs, and translucent wall panels. The project also includes comprehensive site work, utilities, parking, and roadways, with specialized engineering requirements for pile foundations, surcharged sites, and wetlands mitigation. The performance period is 1,246 calendar days from the date of award. In addition to the base construction, the contract includes two option items for an Audio Visual System and Furniture, Fixtures, and Equipment. Award will be determined using a best-value tradeoff process, evaluating technical factors, past performance, safety rates, and small business utilization alongside price. Contractors must comply with CMMC Level 1 cybersecurity requirements and provide performance and payment bonds. Proposals must be submitted electronically via the PIEE Solicitation Module in PDF format.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Federal
MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
Solicitation # N4008526R0276
The Department of the Navy, through Navfacsyscom Mid-Atlantic, is seeking commercial vendors for the MCI East Barracks industrialized construction projects under Other Transaction Authority 10 USC 2808a. This initiative aims to modernize aging infrastructure by constructing approximately 1,723,259 square feet across 12 buildings using advanced manufacturing and industrialized construction methods. The primary objectives are to reduce overall design and construction costs by at least 20 percent and accelerate delivery timelines by 30 percent or more compared to traditional methods, with a requirement that structures be designed, reviewed, and approved within 9 to 12 months. The procurement process is phased, beginning with a request for white papers due by October 29, 2026. These submissions must detail the vendor's technical approach, organizational capability, and experience with large-scale projects exceeding 50 million dollars, specifically demonstrating the ability to execute work within the Southwestern United States. Short-listed vendors will proceed to a second phase involving full proposals with detailed price and schedule estimates, data rights assertions, and potential interactive pitch sessions. Award decisions will be based on best-value evaluations. Successful vendors must manage the full lifecycle of the project, including design, manufacturing, logistics, construction, and commissioning, while adhering to Department of the Navy industrialized construction design standards and Department of Defense Unified Facility Criteria. While conducted via OTA, the project remains subject to several statutory requirements, including the Buy American Act, Davis-Bacon Act, Miller Act, and Cybersecurity Maturity Model Certification. The vendor maintains strict responsibility for all quality control functions, while the Navy retains responsibility for quality assurance.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 811310
New
Federal
INSPECTION, MAINTENANCE, AND CERTIFICATION OF HORIZONTAL LIFELINES AT NAVAL SUPPORT ACTIVITY (NSA) PORTSMOUTH, PORTSMOUTH, VIRGINIA
Solicitation # N4008527R0022
Naval Facilities Engineering Systems Command Mid-Atlantic is conducting market research via a Sources Sought Notice to identify qualified small businesses capable of providing inspection, maintenance, and certification services for 70 Horizontal Lifelines and 4 Ladder Safety Systems at Naval Support Activity Portsmouth in Virginia. The intended contract will be an Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle for non-recurring services, with an anticipated award date of January 2027. The primary objective is to ensure the continued operation of overhead cranes within the shipyard's Controlled Industrial Area by maintaining fall protection systems in accordance with ANSI Z359.1;2-2007, OSHA 29 CFR 1910.66, and 1926.502. All work must be performed by trained and certified technicians and supervised by a registered Professional Engineer who meets the Qualified Person for Fall Protection criteria defined in the May 2024 DON Fall Protection Guide. This opportunity is restricted to small businesses, including 8(a), HUBZone, SDVOSB, and WOSB firms, under NAICS code 811310. Interested respondents must submit a capabilities statement of no more than ten pages, including a company profile and three to five examples of relevant experience, by November 10, 2026. This notice is for planning purposes only and does not constitute a formal solicitation or request for proposal.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS