Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on September 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Justification and approval to use other than full and open competition to award a contract to The University of Sheffield

Awarded
FR24RDI20000000070Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541715
New
Federal
ACC-DTA Commercial Solutions Opening (CSO)
Solicitation # W912CH-26-S-0001
The Army Contracting Command – Detroit Arsenal (ACC-DTA) Commercial Solutions Opening (CSO), solicitation W912CH-26-S-0001, serves as a rapid-acquisition gateway to transition cutting-edge commercial technologies into active defense programs. This vehicle supports a diverse customer base, including the Intelligence and Security Command (INSCOM) and six Portfolio Acquisition Executives, focusing on the development, integration, and sustainment of ground vehicle systems to enhance Army modernization and readiness. The CSO utilizes a streamlined, merit-based, multi-phased evaluation process consisting of solution briefs, presentations, and commercial solution proposals. Awards may be issued through 2028 as FAR Part 12 contracts or non-FAR agreements, such as Other Transaction Authority (OTA) and Cooperative Agreements. The solicitation is organized around various Areas of Interest (AoI) that address critical military needs. Key initiatives include the FALCONS prototype effort for long-range reconnaissance sensors with funding ceilings between 24 million and 30 million dollars, the TIGER Readiness and Hackathon programs for Abrams Main Battle Tank engine supply chain resilience, and requirements for Counter-Unmanned Aircraft Systems (C-UAS) detection, Mobile Camouflage Systems, and Light Tactical Trailer Heavy Chassis. Technical evaluations focus on mission viability and prototype execution, while price proposals are assessed for affordability. To be eligible for award, companies must be registered in the System for Award Management (SAM) with a Unique Entity ID and comply with the Buy American Act and Specialty Metals clauses.
W6QK Acc- Dta

POSTED

about 10 hours ago

DEADLINE

in about 2 years
NAICS: 541715
New
Federal
BAA DEVCOM AC Emerging Technologies
Solicitation # W15QKN-26-S-1AZR
The U.S. Army Combat Capabilities Development Command Armaments Center is soliciting research proposals and white papers for new and innovative technologies related to emerging weapons, munitions systems, and soldier lethality. Issued under FAR 6.102(d)(2), this Broad Agency Announcement is a continuously open solicitation effective from March 5, 2026, through March 4, 2031. The program seeks to advance the state of the art through collaborations with industry and academia, with a particular interest in scientific study and experimentation that fills technology needs across the product life cycle, including improvements in armament packaging, ammunition logistics, and micro-system architecture. The submission process is a two-stage effort beginning with a white paper, which is limited to six pages plus a cover page and biographical sketches. Offerors whose white papers are favorably evaluated may be invited to submit a full research proposal. The government prefers proposals covering a three-year period of performance with incremental funding. Awards are based on a competitive selection process evaluating overall scientific and technical merit, potential contributions to the Army mission, offeror capabilities, personnel qualifications, past performance, and proposed price. All submissions must be unclassified and adhere to strict formatting guidelines, including 12-point Times New Roman font for narrative text.
W6QK Acc-Ri-Picatinny

POSTED

about 10 hours ago

DEADLINE

in over 4 years
NAICS: 541715
New
Federal
Common Autonomous Multi-Domain Launcher (CAML)-Lite Prototype Effort
Solicitation # W50RAJ27CAML_LITE
The Common Autonomous Multi-Domain Launcher (CAML)-Lite Prototype Effort is a competitive procurement conducted under 10 U.S.C. section 4022 for the development of a mobile, optionally manned, autonomous launcher designed to increase survivability and reduce manned support for cross-domain fires. Managed by the Department of Defense, this effort utilizes Other Transaction Agreements (OTAs) and follows a two-phase structure. Phase 1 focuses on a government-sponsored prototype demonstration at Talisman Sabre 2027 in August 2027, with options for the government to acquire additional prototype units, new equipment training, and contractor logistics support. Phase 2 involves maturing selected solutions into a production-representative configuration integrated into a common CAML architecture. The procurement process begins with a Request for Solutions Brief to identify meritorious respondents, who will then be invited to submit a Request for Prototype Proposal. Key technical requirements include the use of a Modular Open Systems Approach (MOSA) to ensure interchangeable modules and common interfaces. Performers are required to assume full responsibility for international logistics and compliance for the Phase 1 demonstration and must adhere to minimum Right to Repair requirements as a condition of award. Selection for Phase 1 is based on the feasibility of the maturation path and the technical soundness of the approach, while subsequent option exercises will prioritize speed of delivery, technical performance, property rights, and the right to repair. Phase 1 OTA awards are expected by December 18, 2026, with a firm-fixed-price payment structure split between award and demonstration completion.
W6DV Peo M & S Redstone

POSTED

1 day ago

DEADLINE

in about 23 hours
NAICS: 541715
New
Federal
Fast Assessment of Solutions, Therapeutics, Pharmaceuticals, and SupplieS (FASTPASS) Innovative Solutions Opening
Solicitation # ARPA-H-SOL-26-160
The Fast Assessment of Solutions, Therapeutics, Pharmaceuticals, and Supplies (FASTPASS) program, under solicitation ARPA-H-SOL-26-160, is an initiative by the Advanced Research Projects Agency for Health (ARPA-H) to develop a near real-time, non-destructive, AI-enabled screening system. The goal is to identify contamination, adulteration, and quality defects in pharmaceutical products through their packaging at ports of entry and other supply-chain nodes using multi-modal sensing and data fusion. This 54-month program is structured into three 18-month phases, culminating in a fieldable platform with validated training materials and integrated documentation capabilities. This procurement is conducted as a multiple-award Other Transaction (OT) Agreement rather than a standard federal contract, meaning it is governed by specific OT articles instead of the Federal Acquisition Regulation. Awards are based on the most advantageous proposals, with primary evaluation factors including innovation, soundness, execution planning, risk management, and team expertise. Payments are fixed and triggered by the successful completion of milestones, managed through the Payment Management System. Proposers must be registered in SAM.gov and provide detailed technical and cost proposals, including a milestone payment schedule and research security disclosures. Amendment 01 specifically updated the cost proposal narrative model and workbook to correct typographical errors and rename appendices.
Advanced Research Projects Agency For Health (arpa-H)

POSTED

1 day ago

DEADLINE

in 19 days

General Info

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance

DC, GBR

Set-Aside

NONE

Documents

1

FRA Justification for Other Than Full and Open Competition - University of Sheffield

PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

special-notice

Justification (J&A)

Justification & Approval published

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 693JJ6 Federal Railroad Administration
Contacts2 people available
OfficeWASHINGTON, DC, 20590, USA
Office AddressWASHINGTON, DC, 20590, USA

Full Description

Show more
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (JOFOC) For Requirements > $10,000 1. Identification of the agency and the contracting activity Federal Railroad Administration Headquarters, Office of Acquisition Management, 1200 New Jersey Avenue, S.E., Washington, DC 20590. 2. Nature and/or description of the action being approved Justification and approval to use other than full and open competition to award a contract to The University of Sheffield to continue the research efforts on modelling the effects of friction modifiers on wheel-rail creep forces, as well as the model enhancement and implementation. 3. Description of the supplies or services required to meet the agency's needs(including the estimated value) Research services required that meet agency needs include: Computer model that sufficiently accounts for the traction-creepage characteristic of the wheel-rail interface and correctly calculates the contact forces, so that vehicle dynamics, wear and RCF predictions are accurate to a satisfactory extent. Additionally, the computer model will be capable to predict friction based on vehicle load, speed, and load cycles while taking intoaccount the contact patch heat effect at high creep levels. The model will be deployable for end users to investigate complex scenarios pertaining to the interaction between friction modifier properties/amounts and vehicle dynamics in a vehicle-track interaction (VTI) simulation environment. The FRA Office Research, Data, and Innovation wishes to build upon the previous research efforts conducted by the University of Sheffield aimed at improving the safety and effectiveness of the railroad operarions in North America by enhancing the vehicle-track interaction modeling techniques, and modeling prediction accuracy. 4. Statutory authority permitting other than full and open competition The statutory authority for this non-competitive action is derived from 41 U.S.C. - 3304(a)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1, - Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. 5. Demonstration that the proposed contractor's unique capabilities or the nature of the acquisition requires use of the authority cited In the previous phase of the project, and under FRA funding, the University of Sheffield research team developed a wheel-rail creep force model that accounts for the effects of third-body layers resulting from the application of a range of top-of-rail (TOR) materials (such as TOR friction modifiers, TOR lubricants, etc.) over a range of creepages. Testing efforts using a twin-disc simulation of the wheel/rail interface (a scaled wheel rig and a full-scale rig) concluded that: ? Water-based, drying, TOR FMs gave intermediate levels of friction; whereas TOR lubricants (Oils and greases) gave much lower friction levels. ? TOR lubricants had a lower consumption rate than TOR FMs, but had a prolonged period of low friction. ? The TOR Hybrid (mix of water and oil based product) gave mixed behavior ? Pick-up and carry-on was only investigated for two TOR FMs. The behavior was largely dictated by the viscosity/tackiness of the product. Through the assessment tests, the collected data and the model development, the research team of the University of Sheffield had considerably gained knowledge and understanding pertaining to the following: ? Conducted TOR tests can be used in the future to assess new product performance and benchmark them against the products trialed in this project. ? The data from the tests was used to inform the development of models for TOR product pick-up and consumption. ? Model User Inetrface (UI) allows intuitive use of the TOR product model and provides access to the main model variables. ? The model code could be integrated into other models such as multi-body dynamics simulations to facilitate and improve assessment of TOR products on vehicle dynamic performance. Based on the experience acquired during the previous phase of the project, the research team of the University of Sheffield possess the necessary unique qualifications and specialized equipmentto continue the research efforts proposed in Phase 2 that aim to improve and implement the previously developed model.The testing facilities used during the tests, the scaled wheel rig (SWR), the full-scale rig (FSR) and the SUROS twin-disc rig are unique to the University of Sheffield and are the only source to perform the required tests and conduct the model validation effort. Although selecting another research institution to build similar testing facilities and continue the work in Phase 2 could be feasible, it would require an substantial investment of additional time and duplication of previous funding to bring the new research team up to speed in order to satisfactorily complete the Phase 2 tasks of the project. Additionally, testing of such a model would have to be accomplished at the University of Sheffield. Based on the above, there is only one responsible source capable of providing the required services. 6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under 5.202 applies. The Contracting Specialist posted a Sources Sought notice on SAM.gov 21 February 2024 and 6 March 2024 to identify potential sources interested in performing the requirement. Only one response was received from the University of Sheffield. 7. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.The FRA will ensure that all costs associated with the proposed contract are fair and reasonable. Cost and pricing data for similar research services are available and will support the FRA's analysis of the Offeror's price proposal and substantiate the determination. 8. Description of the market research conducted and the results or a statement of the reason market research was not conducted FRA Subject Matter Experts reviewed internal and external databases to identify vendors with comparable expertise and equipment to the University of Sheffield research team. A Sources Sought notice was posted on SAM.gov 21 February 2024 and 6 March 2024 to identify potential interested vendors. After posting of the Sources Sought only one interested vendor was identified, the incumbent contractor at the University of Sheffield. At this time it does not appear there is another entity with the unique capabilities held by the Universityof Sheffield. 9. Other facts supporting the use of other than full and open competition Based on both the results of the Sources Sought posted on SAM.gov and the specialized testing facilities, knowledge and experience that the University of Sheffield personnel acquired during the previous phase of the project, full and open competition is not appropriate for this requirement.. 10. Listing of the sources, if any, that expressed, in writing, an interest in the acquisition. One response was received to the Sources Sought Notice posted on SAM.gov from the Universityof Sheffield. No other vendors responded to the notice. 11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. In the event future research efforts are required, the agency will continue to conduct market research and explore vendor capabilities to promote competition whenever possible. 12. Certification/Approval Signatures I certify that the information provided in this justification is accurate and complete to the best of my knowledge and belief. ________________________________________________ _________________ Abe Meddah, General Engineer/COR Date Based upon the preceding information, I hereby recommend approval of this Justification for Other than Full and Open Competition to award a contract to the University of Sheffield aimed at improving the safety and effectiveness of the railroad operarions in North America by enhancing the vehicle-track interaction modeling techniques, and modeling prediction accuracy. I certify that the information provided in this justification is accurate and complete to the best of my knowledge and belief.

More opportunities from Department Of Transportation → 693JJ6 Federal Railroad Administration

Same awarding agency

NAICS: 541611
Federal
Project Management and Integration SupportThe contract for Project Management and Integration Support requires comprehensive oversight of subcontractor activities including coordination, schedule adherence, and integration of deliverables to ensure alignment with program objectives. The contractor is responsible for maintaining accurate tracking of milestones and timelines while providing regular, detailed reporting to the Contracting Officer’s Representative to support informed decision-making and compliance. This role demands strong organizational and communication skills to manage multiple stakeholders and ensure seamless flow of information and outputs across the project lifecycle. The work is positioned under NAICS code 541611 and is associated with the Federal Railroad Administration, a component of the Department of Transportation, with the primary place of performance located in Simi Valley, California, ZIP code 93065. The contract type is classified as a subcontract and was posted on June 29, 2026. There is no specified set-aside status, and no point of contact is listed in the public data. The contract’s operational scope is focused on integration and project management functions critical to the success of federal railroad initiatives, with all activities centered around ensuring timely, high-quality delivery under the oversight of the COR.
Administrative Management and General Management Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 334511
Federal
Handheld RUS Sensor Design and PrototypingThe contract focuses on the design and engineering of a handheld ultrasonic sensor utilizing Resonant Ultrasound Spectroscopy to identify microfractures in railcar wheelset bearings, aiming to enhance safety and predictive maintenance in railroad operations. The project will involve developing a portable, field-deployable device capable of nondestructive detection of early-stage damage in critical bearing components, leveraging the precision of RUS to detect subtle changes in material resonance patterns indicative of microcracks. The work is to be performed in Simi Valley, California, with a NAICS code of 334511 indicating classification under navigational, measuring, electromedical, and control instruments manufacturing. This subcontract is tied to the Department of Transportation’s Federal Railroad Administration and is intended to advance inspection technologies for rail infrastructure. The project emphasizes innovation in sensor miniaturization, signal processing, and real-time data interpretation to enable on-site maintenance personnel to detect bearing degradation before failure occurs. While specific performance metrics or deliverables are not listed, the emphasis on prototyping suggests a focus on moving from conceptual design to a functional, ruggedized device suitable for industrial use. The effort supports broader goals of improving rail safety through advanced, noninvasive diagnostics.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS