Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on April 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Keeter Training Center Waterproofing

Closed
274-ES-FO-FY26-KeeterTrainingCenterWaterproofingState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 8 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract for the Keeter Training Center Waterproofing involves excavation and removal of soil adjacent to the building's elevation to facilitate waterproofing of the below-grade structure, followed by backfilling with new soil. During this process, the contractor must carefully consider existing landscaping and utilities. An inspection of the building’s drainage system is required to identify any damage or malfunction to roof leaders or foundation drains, which the contractor is responsible for repairing or replacing as necessary. The project also includes providing temporary shoring to the ramped walkway bordering the excavation area to ensure stability during the waterproofing work. Issued by the City of Raleigh, North Carolina, this solicitation was posted on April 21, 2026, with a response deadline of May 21, 2026. The contract is managed under the SLED organization type and requires coordination with the designated point of contact, Patrick Barbour. The work location is in North Carolina, and the contractor will adhere to all specifications to protect existing site elements while ensuring the structural integrity and waterproofing of the below-grade building areas.

General Info

Excavate, waterproof, backfill below-grade structure; inspect drains, repair damage, provide temporary shoring.

Place of Performance

NC, USA

Set-Aside

NONE

Documents

1

274-ES-FO-FY26- Keeter Training Center Waterproofing

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Raleigh
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Patrick Barbour

Full Description

Show more
Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation.

More opportunities from North Carolina → City of Raleigh

Same awarding agency

New
SLED
John Chavis Memorial Park – Phase 2 Aquatic Center
Solicitation # 274-FY2027-CM-P06
Solicitation 274-FY2027-CM-P06, issued by the City of Raleigh, North Carolina, Engineering Services Department, seeks bids for the construction of a new two-story aquatic center as part of Phase 2 of the John Chavis Memorial Park Master Plan. The project involves approximately five acres of site development, including a steel-framed, fully sprinklered facility with 25,000 square feet of mixed-use interior space for administration, storage, and assembly. Key aquatic features include a 3,160 square foot competition pool, a 1,400 square foot therapy pool, and a 10,300 square foot outdoor area featuring a 4,600 square foot activity pool with a lazy river, vortex, and a two-story waterslide. Additional site work includes the reconfiguration of parking, repairs to a stone bridge, connections to the South Park Heritage Trail, and the development of Heritage Plaza with a historically inspired public art installation. The award will be granted to the lowest responsible and responsive bidder, with evaluations based on quality, performance, and the proposed schedule. Bidders must be prequalified and licensed under North Carolina General Statute, Chapter 87. Submissions require a bid security of five percent of the bid amount and must be delivered in sealed envelopes by November 10, 2026, at 2:00 PM. The project is managed through a joint venture between Barnhill Building Group and Holt Brothers Construction. Complete scope of work encompasses all civil, structural, architectural, mechanical, electrical, plumbing, fire protection, and site utility systems.

POSTED

about 19 hours ago

DEADLINE

in 13 days
View Details
New
SLED
Meymandi Concert Hall Stage Lighting Fixtures
Solicitation # 274-2027-04-AH
The City of Raleigh is soliciting bids under solicitation number 274-2027-04-AH for the procurement of new, unused stage lighting fixtures and related equipment for the Meymandi Concert Hall. The scope of work includes the supply of 136 replacement reflectors, three four-port DMX gateways, eight lighting control sensor relays, 140 six-foot ethernet cables, and 200 ten-foot 12 AWG power distribution cables. All equipment must be compatible with the City's existing ETC Source Four fixtures and theatrical lighting control systems. Bids are due by November 18, 2026, and the award will be granted to the lowest responsive and responsible bidder, with the City reserving the right to award to one or multiple suppliers. Contractors must provide delivery within three weeks of receiving a purchase order, with all items shipped FOB destination in protective packaging. Compliance with safety regulations including OSHA, EPA, NFPA, and UL is required, and bidders must maintain workers compensation insurance of at least 1,000,000 dollars. Key submission requirements include the completion of non-discrimination assurances, the provision of at least three professional references, and the submission of manufacturer product literature. Additionally, bidders must certify compliance with the Iran Divestment Act and confirm they are not engaged in boycotts against Israel. Payment terms are set at net 30 days following the later of invoice receipt or acceptance of goods.

POSTED

about 19 hours ago

DEADLINE

in 21 days
View Details
New
SLED
Homelessness Prevention, Diversion, and Rapid Exit Program
Solicitation # 274-HCD-FY27-5R
The City of Raleigh is soliciting proposals for the Homelessness Prevention, Diversion, and Rapid Exit Program under solicitation number 274-HCD-FY27-5R. The program aims to prevent households at imminent risk from becoming homeless, divert those seeking entry into the response system to alternative housing, and rapidly exit individuals currently in emergency shelters. Selected agencies must provide financial assistance for rental, security deposits, and utilities, with prevention assistance capped at 7,500 dollars per household. Key operational requirements include full utilization of the HMIS system for data entry, the ability to deliver assistance funds within one business day, and adherence to 24 CFR Part 576.2 homeless definitions. Proposals will be evaluated based on weighted criteria and merit, with the City negotiating with the most qualified firm. Applicants must submit a proposal cost form, a proposer questionnaire, and reference forms by the November 17, 2026, deadline. The contract requires strict compliance with North Carolina laws, including the Iran and Israel Divestment Act certifications and specific insurance coverages, such as a 1 million dollar per occurrence commercial general liability limit. Administrative requirements include electronic invoicing with NET 30 payment terms and the provision of Spanish translation for digital tools to meet limited English proficiency standards. All intellectual property and data created during the contract remain the sole property of the City of Raleigh.

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS