Knolls Zone Water Facilities Project
Forecast
2025101279State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
Crown Hill Drive between Lyon Place and its southern terminus, Simi Valley, CA, 93063Set-Aside
NONE
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → Ventura County Waterworks District 8
Contacts2 people available
OfficeN/A
Interested Companies (1)
Rincon ConsultantsVentura, California
Full Description
Show more
The project consists of construction and operation of a new aboveground water storage tank (the Crown Hill Tank) and associated piping and electrical infrastructure. The purpose of the project is to improve water storage capacity and to provide proper water pressure to some higher elevation lots on the Knolls Pressure Zone. The Crown Hill Tank would be a welded steel aboveground tank approximately 74 feet in diameter and 35 feet in height, with a storage capacity of one million gallons. In addition to the tank, the project would also include installation of a 10-inch pipeline and appurtenances to connect the Crown Hill Tank to the existing Alta Vista Tanks No. 1 and 2, construction of an access roadway and retaining walls, and landscaping in the areas surrounding the project components.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
