Villa la Jolla Drainage System Emergency 2025

Forecast
B-24106.02.06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Villa la Jolla Drainage System Emergency 2025 project, identified by solicitation number B-24106.02.06, is an emergency effort by the City of San Diego to repair critical storm water conveyance infrastructure. The project addresses a sinkhole along Villa La Jolla Drive caused by a failed 144-inch diameter corrugated metal pipe (CMP) storm drain. This emergency work is necessary to prevent flooding and protect public health, safety, and private property within the University Community Planning Area of San Diego. The scope of work includes constructing a new cleanout structure and lining approximately 1,000 linear feet of the CMP with reinforced concrete. Additional technical requirements involve inserting a 66-inch steel casing through a collapsed pipe section with a reinforced concrete coating, installing two 24-inch diameter pipes parallel within the existing system to maintain design capacity, and rehabilitating a 36-inch diameter CMP storm drain lateral with a liner. The project also entails backfilling the sinkhole, resurfacing the impacted right-of-way, and restoring all affected areas to their original condition. The project is exempt from the California Environmental Quality Act (CEQA) due to its emergency nature.

General Info

City of San Diego emergency repair of Villa la Jolla storm drain infrastructure.

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

emergency

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Eriberto J. Valdez JrSenior Planner
Carrie PurcellDeputy Director

Full Description

Show more
A visual Inspection of the existing storm water conveyance system revealed a sinkhole undermining the right-of-way Improvements along Villa La Jolla Drive. The sinkhole was ·caused by a failed 144-inch diameter corrugated metal pipe (CMP} storm drain. The project will construct a new cleanout structure along Villa La Jolla, repair approximately 1,000 linear feet of the CMP by lining the pipe with reinforced concrete in both directions from the new cleanout structure, backfill the sinkhole, and resurface the area of the right-of-way Impacted by the sinkhole. Additional repairs Include inserting a 66-lnch steel casing through a collapsed section of pipe, which will be subsequently coated with reinforced concrete. Additionally, two 24-lnch diameter pipes will be Inserted parallel within the existing storm drain pipe to maintain the design capacity of the system, and a segment of 36-lnch diameter CMP storm drain lateral will be rehabilitated with a liner. Failure to repair the storm drain infrastructure Increases the likelihood of flooding and impacts to private property and the right-of-way. The proposed work Is the minimum necessary to ensure adequate operational capacity of the storm drain and public health and safety. Following the completion of work, all surrounding areas Impacted by the emergency will be restored to their impact condition to the extent feasible.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS