Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Villa la Jolla Drainage System Emergency 2025 project, identified by solicitation number B-24106.02.06, is an emergency effort by the City of San Diego to repair critical storm water conveyance infrastructure. The project addresses a sinkhole along Villa La Jolla Drive caused by a failed 144-inch diameter corrugated metal pipe (CMP) storm drain. This emergency work is necessary to prevent flooding and protect public health, safety, and private property within the University Community Planning Area of San Diego. The scope of work includes constructing a new cleanout structure and lining approximately 1,000 linear feet of the CMP with reinforced concrete. Additional technical requirements involve inserting a 66-inch steel casing through a collapsed pipe section with a reinforced concrete coating, installing two 24-inch diameter pipes parallel within the existing system to maintain design capacity, and rehabilitating a 36-inch diameter CMP storm drain lateral with a liner. The project also entails backfilling the sinkhole, resurfacing the impacted right-of-way, and restoring all affected areas to their original condition. The project is exempt from the California Environmental Quality Act (CEQA) due to its emergency nature.

General Info

City of San Diego emergency repair of Villa la Jolla storm drain infrastructure.

Agency

California → City of San Diego

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

NOE re Villa La Jolla Drainage System Emergency 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Eriberto J. Valdez JrSenior Planner
Carrie PurcellDeputy Director

Full Description

Show more
A visual Inspection of the existing storm water conveyance system revealed a sinkhole undermining the right-of-way Improvements along Villa La Jolla Drive. The sinkhole was ·caused by a failed 144-inch diameter corrugated metal pipe (CMP} storm drain. The project will construct a new cleanout structure along Villa La Jolla, repair approximately 1,000 linear feet of the CMP by lining the pipe with reinforced concrete in both directions from the new cleanout structure, backfill the sinkhole, and resurface the area of the right-of-way Impacted by the sinkhole. Additional repairs Include inserting a 66-lnch steel casing through a collapsed section of pipe, which will be subsequently coated with reinforced concrete. Additionally, two 24-lnch diameter pipes will be Inserted parallel within the existing storm drain pipe to maintain the design capacity of the system, and a segment of 36-lnch diameter CMP storm drain lateral will be rehabilitated with a liner. Failure to repair the storm drain infrastructure Increases the likelihood of flooding and impacts to private property and the right-of-way. The proposed work Is the minimum necessary to ensure adequate operational capacity of the storm drain and public health and safety. Following the completion of work, all surrounding areas Impacted by the emergency will be restored to their impact condition to the extent feasible.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS