Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Lake Wohlford Dam Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Escondido is undertaking the Lake Wohlford Dam Replacement Project in San Diego County, California, involving the construction of a new dam immediately downstream of the existing structure and the partial deconstruction of the old dam by removing hydraulic fill material. A new cast-in-place reinforced concrete outlet tower will be built on the upstream face of the dam, extending to an elevation of 1,490 feet above mean sea level and connected to an emergency release valve and appurtenances located on the south side of a newly constructed stilling basin and spillway. This project is authorized under California Fish and Game Code section 1602 through a Lake and Streambed Alteration Agreement issued by the California Department of Fish and Wildlife, with approval granted on July 25, 2025, and the project is subject to environmental compliance under the California Environmental Quality Act and related mitigation measures outlined in the Final Environmental Impact Report and Notice of Determination. The project site is located on Escondido Creek with specific geographic coordinates and parcel identification, and all work must adhere to regulatory conditions set by CDFW for environmental protection and streambed alteration. The California Department of Fish and Wildlife serves as the lead regulatory authority responsible for inspection, acceptance, and enforcement of project compliance, while the City of Escondido acts as the project applicant and performing entity. Key contacts include Andrew Aitken and Glen Lubcke from CDFW’s South Coast Region and Mike Strong from the City of Escondido, who serve as primary points of coordination. While the project has received regulatory approval and environmental clearance, no federal contract clauses, pricing data, financial estimates, contractual delivery schedules, or procurement-specific details such as evaluation factors, special requirements, or offeror certifications are included in the documentation. The project information is presented as a forecast with no solicitation number or formal contractual pricing structure, indicating that the current phase focuses on regulatory authorization rather than competitive bidding or financial contracting. No packaging, invoicing, accounting codes, payment terms, or delivery instructions are specified, and the scope remains narrowly defined by environmental compliance and infrastructure replacement objectives.

General Info

City of Escondido to replace Lake Wohlford Dam, build outlet tower, and comply with CDFW environmental regulations.

Agency

California → City of Escondido

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SDO-25082-R5 Lake Wohlford Dam Replacement Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Escondido
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Escondido
Office AddressN/A
Contacts
Andrew AitkenEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SDO-25082-R5), pursuant to Fish and Game Code section 1602, to the project Applicant, City of Escondido. The project entails constructing a replacement dam immediately downstream (west) of the existing dam and partially deconstructing the existing dam by removing hydraulic fill material. A new outlet tower would be constructed on the upstream side of the dam, built as a cast-in-place, reinforced concrete structure anchored to the dam’s face and extending to the dam crest at elevation of 1,490 feet above mean sea level (AMSL). The outlet tower would be connected to the proposed dam’s downstream emergency release valve and appurtenances located on the south side of the new stilling basin and spillway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details