North Beach and Area 1 Initial Sand Placement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Orange County Transportation Authority (OCTA) is implementing the North Beach and Area 1 Initial Sand Placement project to protect the railroad embankment along the LOSSAN Rail Corridor in San Clemente, California. Approved on July 1, 2025, the project aims to mitigate coastal erosion and prevent rail service disruptions by placing up to 30,000 cubic yards of sand. This emergency action is authorized under CEQA Statutory Exemptions 15269(b) and (c), which allow for immediate repairs to essential transportation facilities to prevent substantial harm. Sand will be sourced from both inland and offshore sites and delivered via trucks and offshore dredge hoppers. The placement process may be phased over several storm seasons, with the schedule remaining flexible as the design evolves. The project is currently listed as a forecast with Jim Beil, Executive Director of Capital Programs, serving as the lead agency contact. Due to its status as an emergency project, the available documentation focuses on environmental compliance and project scope rather than detailed procurement terms, pricing, or formal contract clauses.

General Info

Emergency sand placement to protect railroad embankment, no formal contracts or pricing, exempt from environmental review.

Agency

California → Orange County Transportation Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Clemente, CA

Set-Aside

NONE

Documents

(1)

North Beach Area 1 Initial Sand Placement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Orange County Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Orange County Transportation Authority
Office AddressN/A
Contacts
Jim BeilExecutive Director, Capital Programs

Full Description

Show more
The railroad embankment in the North Beach area has faced dry beach due to past storms and continuing erosional processes. On July 1, 2025, OCTA approved a project that would place up to 30,000 cubic yards of sand to protect the rail line. The sand placement could be phased over several storm seasons, subject to change as design develops. Sand would come from inland and off shore dredge sites. The sand would be brought in via trucks and by an off shore dredge hopper.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District 1600 is undertaking the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a single 48-inch gravity drainage pipe located southeast of Knights Landing along the Tule Canal at Levee Mile 0.36. The primary objective is to maintain the existing pipe size, function, and alignment to ensure the continued conveyance of water from agricultural lands east of Woodland to the Tule Canal within the Yolo Bypass. Construction is scheduled to begin on August 3, 2026, with a phased timeline including mobilization, site preparation, excavation and demolition, pipe installation, levee restoration, and final demobilization. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that there are no significant unmitigable environmental impacts, provided that specific avoidance and minimization measures are implemented. Key requirements for the contractor include mandatory worker environmental awareness training, the installation of temporary exclusion fencing to protect aquatic habitats, the execution of a Spill Prevention, Containment, and Countermeasure Plan, and adherence to strict in-water work windows. Additionally, the contractor must utilize vibratory pile drivers for cofferdams and maintain daily inspections of silt curtains to control turbidity in compliance with Basin Plan standards and Cal-OSHA safety requirements.
Reclamation District 1600

POSTED

about 16 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS