Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on May 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Landscape Architectural Construction Inspection

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541320
New
SLED
Existing Athletic Fields and New Multi-Use Athletic Facility
Solicitation # 6636
The City of Tualatin is seeking qualified consultant teams to provide design, permitting, and construction support for athletic field improvements funded by the 2022 Parks & Trails Bond. The project is divided into two phases: Phase 1 focuses on improving existing fields at Tualatin Community Park, Atfalati Park, Ibach Park, and Jurgens Park with additions such as covered dugouts, backstops, and ADA drinking fountains. Phase 2 involves the planning and design of a new 103,000 square foot multi-use athletic facility at Tualatin Elementary School, featuring synthetic turf, field lights, and a restroom building. The anticipated period of performance begins with the Phase 1 agreement in March 2027 and continues through project completion in summer 2029. Proposals must be submitted electronically via BidLocker by 2:00 p.m. local time on December 2, 2026. The selection process is based on a best-value evaluation, prioritizing the consultant's ability to deliver comparable projects, project approach, and community engagement. Required submission materials include a cover letter, an organizational chart, a ten-page narrative response, and resumes for the Project Manager, Public Engagement Lead, and Landscape Architect. The resulting contract will be a Professional Services Agreement with payments issued net thirty days after receipt of itemized monthly invoices, contingent upon the City receiving necessary appropriations. All work must adhere to Oregon Public Contracting Code, ADA accessibility standards, and the City's specific professional standards of care.
City of Tualatin, OR

POSTED

2 days ago

DEADLINE

in 25 days
NAICS: 541320
New
SLED
82627P0002-BEPA: GI-PSE 1-3 Design Services Task Order Contract for Green Infrastructure in NYC Parks & City-owned Street Ends
Solicitation # 82627P0002
The New York City Department of Environmental Protection is seeking up to three consultants to provide design services for Green Infrastructure projects within NYC Parks and City-owned street ends under a rotational task order contract. The primary objective is to implement nature-based solutions, such as bioretention systems, permeable pavement, green roofs, and wetlands, to manage stormwater runoff from impervious surfaces and meet Consent Order requirements for water quality improvement. The scope of work is divided into five phases: project planning, design development (at 30%, 75%, 90%, and 100% completion), construction procurement support, design services during construction, and project close-out. The anticipated contract term is 1,095 days with two one-year renewal options. Proposals are evaluated based on organizational capability (40%), experience (30%), and technical approach (30%), with quantitative preference given to City or State certified M/WBE vendors to meet a 30% participation goal. Financial constraints include a 10% cap on project management costs, a $1,275,000 allowance for other direct costs, and a maximum labor rate of $420 per hour. Compensation for subconsultants is capped at 49% and principals at 35% of the maximum contract amount. All submissions must be processed through the PASSPort portal by November 18, 2026.
Department Of Environmental Protection

POSTED

2 days ago

DEADLINE

in 10 days
NAICS: 541320
New
SLED
PARKS AND RECREATION MASTER PLAN
Solicitation # 26-8690
Collier County Parks and Recreation Division is soliciting professional services under solicitation 26-8690 to develop a comprehensive, data-driven Parks and Recreation Master Plan. The project aims to establish a strategic vision for future facilities, programs, and services by assessing current operations, staffing, financial capacity, and maintenance practices while identifying community needs and market trends. The scope of work is divided into six primary tasks, including market research, open space planning, social service and recreation program assessment, master plan development, implementation strategy, and community outreach. Key deliverables include a phased implementation plan with cost estimates and an evaluation of fee structures and equitable access. At least one staff member directly involved in the project must hold certification from the American Institute of Certified Planners. Proposals must be submitted electronically via the OpenGov portal by November 18, 2026. The selection process involves scoring proposals based on past performance, personnel ability, project approach, workload, location, and minority business certification, followed by oral presentations to develop a shortlist for Board of County Commissioners approval. Mandatory submission requirements include a vendor declaration, conflict of interest certification, immigration certification, and proof of E-Verify enrollment. For projects exceeding 200,000 dollars, the successful contractor must provide performance and payment bonds for 100 percent of the contract amount. Payments will be processed in accordance with the Local Government Prompt Payment Act of Florida.
Parks & Recreation

POSTED

3 days ago

DEADLINE

in 10 days
NAICS: 541320
New
SLED
Campus Consulting Landscape Architecture Services
Solicitation # 20261104027
California Polytechnic State University, San Luis Obispo is soliciting proposals for campus landscape planning and design consulting services under solicitation 20261104027. The selected service provider will be responsible for a variety of design phases, including initial site design, conceptual landscape design, site inventory and analysis, and refined design review. The scope covers diverse project areas such as natural and open spaces, public realm improvements, pedestrian and vehicular corridors, streetscapes, and parking. Key deliverables include the development of project-specific plant lists compliant with the university's approved standards and the provision of construction administration assistance for select projects. The agreement is intended for an initial term of two years, with options to extend for up to three additional years. The award will be based on the highest overall evaluation score, with significant weight placed on the proposed team, firm culture, project definition strategies, and the ability to achieve design excellence within budget and schedule constraints. Proposers must submit their responses in A3 format by December 1, 2026, including an itemized hourly rate schedule. Administrative requirements include invoicing through the CSUBUY platform, registration with the Department of Industrial Relations for prevailing wage compliance, and adherence to California state eligibility and nondiscrimination certifications. The service provider will report to the Executive Facility Officer or a designated campus Project Manager, and final acceptance of work is subject to the approval of the Trustees.
California Polytechnic State University, San Luis Obispo

POSTED

3 days ago

DEADLINE

in 24 days
NAICS: 541320
New
SLED
Land Development Code Update
Solicitation # 26-107
The City of Fort Myers, Florida, issued solicitation RFP 26-107 to engage a qualified multidisciplinary consulting firm for a comprehensive rewrite of its Land Development Code (LDC). The primary objective is to align the LDC with the updated Comprehensive Plan and remove regulatory barriers to infill, adaptive reuse, and redevelopment. The scope of work includes project management, an assessment of existing conditions and code consistency, the development of a new code framework, and extensive stakeholder and public engagement. Key deliverables include an existing conditions report, a code crosswalk, a preliminary rewritten LDC within six months, and final adoption-ready documents and training materials within one year of the project start date. Proposals must be submitted as a single PDF via the OpenGov portal by November 13, 2026. Qualified respondents must demonstrate at least five years of business stability and provide mandatory certifications, including a Human Trafficking Affidavit, Current Capacity Certification, and Non-Collusion Certification. The City will utilize a points-based scoring method to rank short-listed firms, with the highest-ranked respondent entering negotiations for a Professional Services Agreement. While the solicitation originally included special conditions for Minority Business Enterprises and local preferences, these were removed via Addendum 1. Selected consultants must adhere to strict insurance requirements and quality control standards to ensure legal consistency and technical accuracy in all final deliverables.
Community Development

POSTED

4 days ago

DEADLINE

in 5 days
NAICS: 541320
New
SLED
Deane's Children's Park Phase I and II Improvements
Solicitation # 2026-RFQ-044
Solicitation 2026-RFQ-044, issued by the City of Mercer Island Public Works department, seeks professional services for the detailed design, permitting, and construction of Phase I and II improvements at Deane's Children's Park located at 5701 Island Crest Way, Washington. The project focuses on expanding inclusive play and accessibility while preserving the site's natural character. Phase I includes nature-based inclusive play features for ages 5 to 12 and older, swings, fencing, accessible parking, a connection to Island Park Elementary, utility infrastructure, and native vegetation restoration. Phase II involves the redevelopment of the central play area with inclusive features for children ages 2 to 12 and older. The selected consultant must be licensed in Washington State per RCW 39.80.020 and adhere to ADA and playground safety standards. The contract will be governed by the City's standard professional services agreement, requiring the consultant to act as an independent contractor and provide comprehensive indemnification to the City. Payment will be made via City warrant within 45 days of receiving monthly invoices. The evaluation process involves screening Statements of Qualifications, which are due by December 4, 2026, and may include short-listing, interviews, and reference checks. The final selection is at the sole discretion of the City. Awarded firms must maintain cost records for three years following final payment and provide technical construction support, including the review of RFIs and shop drawings.
Public Works

POSTED

4 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for Landscape Architectural Construction Inspection services. The scope of work involves providing specialized inspections for various landscape elements, with a primary focus on verifying the functionality of irrigation systems, ensuring aesthetic compliance, and monitoring native planting through the verification of species and survival rates. This opportunity was posted on May 30, 2024, with a response deadline of July 1, 2024. The contract falls under NAICS code 541320 and is managed through the Caleprocure system.

General Info

Documents

This scope was carved out of 11A3999.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

11A3999 - A&E on-call Construction Management, Engineering, Inspection, Materials Sampling and Testing, and Construction Claims, Scheduling, and CPM for District 3 services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide specialized inspection for landscape elements including native planting, irrigation systems, and aesthetic compliance, verifying species, survival rates, and system functionality.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project scope covers the segment from 0.1 mile north of Route 1 at Leggett to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key work activities include the placement of hot mix asphalt, replacement of signs, and improvements to drainage systems. The estimated cost for the project is 24 million dollars, with a required bid range of 140 to 200 working days. Bids are set to open on December 10, 2026, and job site activities must commence within 55 days of contract approval by the Attorney General. The contract is governed by 2025 Standard Specifications and Standard Plans, with specific modifications detailed in the Special Provisions across multiple divisions, including earthwork, surfacing, structures, and electrical work. Performance is subject to strict environmental and technical constraints, such as limiting work within drainage channels to the period between June 15 and October 15. Compliance requirements include Buy America/Build America standards, prevailing wage rates as determined by the California Department of Industrial Relations, and specific certifications for small businesses and Disabled Veteran Business Enterprises. Additionally, the contractor must designate an on-site safety representative and adhere to rigorous quality assurance standards for concrete and electrical components.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS