Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Levee Rehab

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fish and Wildlife Service, under the Department of the Interior, is forecasting a project to rehabilitate the RRL Lower Lake Levee Phased 25/26 (c). This effort is categorized under NAICS code 237990 and is scheduled for performance in Lima. The procurement process is managed by Dara Rodriguez, with Josh Gordon serving as the Small Business Specialist. Further details regarding this forecast can be accessed through the Acquisition Gateway.

General Info

Fish and Wildlife Service rehabilitating RRL Lower Lake Levee Phased 25/26 in Lima.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Lima, MT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior → Fish and Wildlife Service
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Rehabilitate RRL Lower Lake Levee Phased 25/26 (c)

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Solicitation # OSU-260081
The OSU-260081 Fuel Tank Dispensing Infrastructure Replacement is a re-bid general contract for The Ohio State University with an estimated value of 1,627,730 dollars. The project scope involves the removal and replacement of three underground storage tanks, specifically one diesel and two unleaded gasoline tanks, along with the associated dispensing piping, islands, and infrastructure. Additional work includes replacing underground diesel exhaust fluid piping, performing upgrades to the diesel canopy, fully replacing the unleaded canopy and its foundation, and installing new fuel management card readers at three facilities. Construction is anticipated to begin in August 2027, and the contractor is required to provide at least two training sessions for facility personnel on system operation and maintenance. Bids must be submitted electronically via BidExpress by October 15, 2026, at 2:00 p.m. EST. Evaluation for award is based on the bidder's financial condition, past performance, facilities, and management capability in plumbing, fire protection, HVAC, and electrical work. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage rates, and the use of an Ohio State Fire Marshal certified installer for tank installation. The contract also mandates adherence to the 2024 Ohio Building Code, 40 CFR 280, and ADA requirements. Payment for approved requests is issued within 30 days of acceptance, and bidders must provide a bid guaranty and subsequent performance and payment bonds.
The Ohio State University

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237990
New
SLED
26RFCSP85 Brushy Creek Trail Retaining Wall
Solicitation # 26RFCSP85
Williamson County is soliciting competitive sealed proposals for the Brushy Creek Trail Retaining Wall project (26RFCSP85) to stabilize a 170-foot retaining wall and address erosion and drainage issues near UBCWCID Dam No. 7 in Cedar Park, Texas. The scope of work includes compaction grouting, special excavation, embankment with density control, and the installation of Type C wire fencing. Additionally, the project requires comprehensive erosion control measures, including the placement of dry common stone riprap, Type 2 filter fabric, hydro mulch seeding, and the planting of vegetation. The project has a construction budget of 200,000.00 dollars and a completion timeline of 90 days. Proposals will be evaluated on a 100-point scale, with the highest weight placed on the pricing proposal (37 points), followed by demonstrated experience with similar projects, government performance history, and the qualifications of the assigned Site Superintendent and Project Manager. Awardees must comply with Texas Prevailing Wage Law and provide mandatory certifications, including anti-boycott statements regarding Israel, energy companies, and firearm entities. The contractor is required to maintain comprehensive insurance coverages, including Workers Compensation, General Liability, and Builder's Risk, and must provide both payment and performance bonds before commencing work. All submissions must be made via the County's purchasing portal or delivered in a sealed envelope to the Purchasing Department in Georgetown, Texas.
Wilco

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Water Well Replacement ProjectThe Vandenberg Village Community Services District is undertaking the Water Well Replacement Project in Lompoc, California, to replace three aging potable water wells (Wells 1B, 3A, and 3B) that have reached the end of their functional lifespan. The project involves constructing three new wells with an expected yield of 800 to 1,350 gallons per minute, including the installation of electrical service, metering, monitoring, and security infrastructure. These new wells will be connected to the existing water distribution system via new lateral connections and replacement pipelines at Well Site 1. The work is located within a 0.76-acre site in the Burton Mesa Ecological Reserve, with temporary construction staging near Exit 702/704 of State Route 1. Construction is anticipated to span approximately 30 months, with a general timeline from July 2027 through December 2029, though specific site preparation and grading are scheduled as early as July 2026. The project must adhere to the California Green Building Standards Code (CALGreen) and various California waste management acts (AB 939, AB 341, and AB 1826), as well as the Construction General Permit for water quality. Environmental compliance is a primary focus, with a Mitigated Negative Declaration adopted under CEQA guidelines to address impacts on biological resources, air quality, and greenhouse gas emissions. Key mitigation measures are specifically required to protect special-status plants and wildlife within the ecological reserve.
Vandenberg Village Community Services District

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS