This Solicitation opportunity from Utah was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lindon City - Well House #5
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Lindon City is soliciting proposals for the construction of a new drinking water well pump house designated as Well House #5 under solicitation number PW2026-02. The project requires the buildout of a masonry structure with an asphalt shingle roof, housing a 2,500 gpm vertical turbine pump driven by a 400 HP motor, along with associated piping, valves, a flow meter, a gas chlorination system, pump-to-waste and discharge lines, HVAC, electrical systems, control panels, and comprehensive sitework including grading, concrete pavement, site restoration, and fencing. All components must be installed, tested, and commissioned to ensure full operational readiness. A mandatory site visit is scheduled for Tuesday, June 30, 2026, at 2:30 p.m. at the Lindon City Public Works location, and failure to attend may disqualify a bid. proposals must be submitted by the deadline of Tuesday, July 21, 2026, at 8:30 p.m. The contract will be awarded to the most qualified vendor based on a comprehensive evaluation of cost, work approach, schedule adherence, relevant experience, and professional references. The project is being managed by Lindon City’s Procurement Unit, with Trent Andrus serving as the primary point of contact, reachable at tandrus@lindon.gov. The solicitation was posted on June 23, 2026, and is hosted on the Utah BonfireHub portal. No set-aside or NAICS code has been designated, and the place of performance is within the state of Utah. Bidders are expected to demonstrate technical competency and reliability in delivering municipal water infrastructure projects of similar scale and complexity.
General Info
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: construction of a new drinking water well pump house. The well house shall consist of but not limited to a masonry structure with an asphalt shingle roof, 2,500 gpm vertical turbine well pump with 400 HP motor, piping, valves, flow meter, gas chlorination system, pump-to waste and discharge piping, HVAC systems, electrical systems, control panels, sitework with grading, concrete pavement, site restoration, fencing, testing and commissioning. Mandatory Site Visit: Tuesday, June 30, 2026, 2:30 p.m., Lindon City Public Works.
It is anticipated that this IFB will result in a single contract award to the best proposal from a qualified vendor based on selection criteria (cost, approach to work, schedule, experience, references).
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
