Lined Manhole Installation and Site Integration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the installation of precast lined manhole units with full site integration, requiring coordination of excavation activities, backfilling, and compaction to meet engineering and safety standards. Leakage testing is mandatory to ensure structural integrity and prevent environmental contamination, and record drawings must be updated to reflect as-built conditions. All work must be synchronized with scheduled utility shutdowns to minimize disruptions and maintain public safety. The project falls under NAICS code 238990 and is classified as a subcontract opportunity issued by the state of Utah. Responses are due by September 2, 2026, and the solicitation is accessible through the Utah Bonfire Hub platform.

General Info

Install precast lined manhole units with leak testing, backfilling, and as-built records by Sept 2, 2026, in Utah.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of MTOID03-2026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CM/GC Services for the UTA TRUNKLINE A RELOCATION PROJECT and the TRUNKLINE A RESILIENCY PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install precast lined manhole units including excavation coordination, backfilling, compaction, leakage testing, and record drawing updates in coordination with utility shutdowns.

More opportunities from Utah

Same awarding agency

New
SLED
Salt Lake City Airport Surplus Canal Relocation
Solicitation # 542715
The Salt Lake City Airport Surplus Canal Relocation project (Project Number 542715) is a heavy civil construction effort located at the Salt Lake City International Airport, specifically landside south and west of the center runway. The scope of work involves relocating the Surplus and North Point canals to the south of the new parking area, parallel to the existing TRAX line. Key deliverables include earthwork compliant with US Army Corps standards, water management systems, the construction of a storm water pump station and detention basin, and various utility relocations. The project requires the installation of HDPE liners for the North Point Canal and strict adherence to technical standards for galvanized steel conduits and communications infrastructure. The contract will be awarded to the lowest responsive, qualified, and responsible bidder, with evaluations based on bid price, experience, performance capability, and legal compliance with Utah licensing laws and the Salt Lake City Code. Bidders must provide a bid bond of at least 5% of the total bid and certify compliance with work environment standards and health insurance coverage for subcontracts exceeding $1 million. The project is subject to the Davis-Bacon Act and must comply with ADA and Title VI non-discrimination regulations. Administrative requirements include a rigorous payment process where applications for payment must be accompanied by a work narrative and at least twelve glossy color photos. The Owner maintains audit rights over contractor records, with a 10% annual interest rate on overpayments. Quality assurance is managed through a combination of off-site testing, factory acceptance tests, and on-site visual and nondestructive weld inspections. All identification labels and tags must be machine-generated and weather-resistant, with specific color-coding for fiber optic warning tags.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
New
SLED
DFCM Construction - Request for Statement of Qualifications Open-Ended Stage I Prequalification of Contractors for DFCM-Managed and Public School Construction Projects
Solicitation # CS27031
The State of Utah Division of Facilities Construction and Management is conducting an open-ended Stage I prequalification process to establish a registry of new contractors for capital improvement and public school construction projects. This solicitation targets specialized trades including Electrical, Fire Protection Systems, General, Hazmat, HVAC/Mechanical, Paving, Plumbing, Roofing, and Site/Civil. The scope covers projects throughout Utah with construction budgets under 3.5 million dollars for capital improvements and exceeding 500,000 dollars for public school construction. Prequalified status is effective February 1, 2027, and remains valid for 18 months, with renewal requirements permitted starting 60 days before expiration. To achieve prequalification, contractors must submit a Statement of Qualifications (SOQ) via the U3P portal, including a detailed experience and work history, a documented safety policy, and a signed Termination or Debarment Certification Form. Applicants are evaluated on a 100-point scale, requiring a minimum overall score of 80 points, with at least 60 points for qualifications and 20 points for past performance references. Mandatory disqualification criteria include failure to attend the mandatory meeting, failing to average a performance rating of 4 out of 5, or failing to provide the required certifications. Additionally, contractors must comply with Utah professional business licensing laws and may be required to provide performance and payment bonds for 100 percent of the contract sum during subsequent Stage II bidding processes.

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS