Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Low Impact Development (LID) & Stormwater Systems Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Low Impact Development and Stormwater Systems Installation involves the implementation of stormwater management systems for prime contractors on residential projects within the City of San Jose. The scope of work includes the construction of bioretention systems, the installation of groundwater recharge facilities, and the application of stormwater mitigation measures using specialized drainage infrastructure and bioretention media. The contractor is responsible for delivering a fully installed and certified system that adheres to regional water quality standards and FEMA flood hazard zone requirements, specifically for Zones D and X. This project falls under NAICS code 237310 and is focused on ensuring sustainable water management and regulatory compliance for residential developments in the San Jose area.

General Info

Subcontract for installing residential stormwater management and bioretention systems in San Jose.

Place of Performance

San Jose, CA

Set-Aside

NONE

Documents

This scope was carved out of H23-029.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1000 South De Anza Boulevard Residential Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom 1000 South De Anza Boulevard Residential Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jose
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of San Jose
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and implements stormwater management systems for prime contractors on City of San Jose residential projects. Constructs bioretention systems, installs groundwater recharge facilities, and implements stormwater mitigation measures. Utilizes bioretention media and specialized drainage infrastructure. Complies with FEMA flood hazard zone requirements (Zones D and X) and regional water quality standards. Delivers a fully installed and certified stormwater management system.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → City of San Jose

Same awarding agency

NAICS: 541620
New
SLED
PP15-060 Envision San Jose General Plan Supplemental
Solicitation # C26-008
The City of San Jose has issued a Notice of Determination regarding amendments to the San Jose Municipal Code Chapter 13.48 Historic Preservation Ordinance. These amendments update key definitions for historic districts and landmarks and introduce new terms including detrimental, historic integrity, and substantial alteration. A primary objective of these changes is to clarify that Historic Preservation Permits are only required for exterior modifications to properties officially designated by the City Council. Additionally, the amendments establish an override provision allowing the City Council to approve projects that may have detrimental effects on historic resources if those effects are outweighed by economic, legal, social, or technological benefits. This action is supported by an Addendum to the Envision San Jose 2040 General Plan Final Program Environmental Impact Report and the Downtown Strategy 2040 Final Environmental Impact Report. The environmental analysis concluded that the ordinance amendments do not result in new significant environmental impacts beyond those previously identified in the certified reports. The project adheres to the California Environmental Quality Act, the National Historic Preservation Act, the Secretary of the Interior's Standards, the Mills Act, and the California Historical Building Code. While the amendments are procedural, any individual project utilizing the new override provision remains subject to CEQA analysis and the adoption of a Statement of Overriding Considerations.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Glider Residential Project
Solicitation # H23- 028, T23- 022 and ER23- 230
True Life Companies, LLC proposes the Glider Residential Project in San Jose, California, which involves the demolition of an existing school at 511 Cozy Drive to develop 80 residential units on a 9.51-acre site. The development will consist of 64 single-family detached homes and 16 single-family attached homes, with 11 units deed-restricted for lower-income households. The project includes the creation of a 0.68-acre public park featuring shade trees, picnic tables, and benches, along with 2.09 acres of public right-of-way. The City of San Jose serves as the lead agency, and the project has undergone a comprehensive environmental review process under the California Environmental Quality Act, including a Final Environmental Impact Report that identified significant unavoidable impacts regarding greenhouse gas emissions and transportation. The project performance period is scheduled from June 1, 2026, to November 17, 2028, beginning with demolition in June 2026 and concluding with architectural coating in November 2028. Technical assessments have been completed covering air quality, biological resources, cultural resources, geology, hydrology, and noise. A Phase I Environmental Site Assessment was conducted by Cornerstone Earth Group, Inc. to identify recognized environmental conditions. While the City Council approved the project on September 15, 2026, the development must adhere to specific mitigation measures and regulatory standards, including California Code of Regulations Title 22 for hazardous waste labeling and various ASTM standards for environmental site assessments.
Environmental Consulting Services

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 541490
SLED
1000 South De Anza Boulevard Residential Project
Solicitation # H23-029
The 1000 South De Anza Boulevard Residential Project, solicitation H23-029, is a site development permit issued by the City of San Jose for the construction of a seven-story, 77,660 square foot residential building. The project involves the demolition of an existing single-story commercial structure and the removal of 13 trees on a 0.72-gross-acre site. The resulting 97-foot tall building will feature 120 residential units, including 16 below-market-rate affordable living spaces, 5,017 square feet of common open space, and a 148-stall parking area utilizing mechanical lifts along with eight outdoor guest spaces. The project is governed by strict environmental and regulatory mandates, having undergone a Final Environmental Impact Report in compliance with the California Environmental Quality Act. Key requirements include the implementation of Low Impact Development standards for stormwater management, adherence to FEMA flood zone regulations, and compliance with Valley Water ordinances. Special provisions mandate rigorous cultural resource protections, including mandatory sensitivity training for personnel, the presence of qualified archaeological and Native American monitors during earth-moving activities, and the potential development of a Cultural Resources Public Interpretation Plan to acknowledge the site's significance as traditional Ohlone land. Project approval was finalized on December 17, 2025, with a Notice of Determination filed on December 18, 2025.
Other Specialized Design Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1207 North Capitol Avenue Residential Project
Solicitation # 2025090597
The 1207 North Capitol Avenue Residential Project, solicitation number 2025090597, involves the demolition of a 3,680 square foot single-family residence to construct a five-story, 128-unit affordable housing development in San Jose, California. The project features a U-shaped building with a maximum height of 53 feet and two inches, consisting of low-income units and one market-rate manager's unit. Ground floor amenities include two lobbies, a fitness room, yoga studio, game room, community kitchen, offices, bike storage, and a package room. The site will include a courtyard with a 52-space surface parking lot, solar panels on the roof, and a new 24-foot wide right-in, right-out driveway on North Capitol Avenue. The project has undergone extensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration approved by the City of San Jose on December 15, 2025. Key environmental assessments identified lead contamination in shallow soil and potential chlorinated solvent impacts from off-site sources, requiring specific excavation and waste disposal protocols. Mitigation measures include Tier 4 engine requirements for construction emissions, protections for nesting birds, and adherence to Cal/OSHA and NESHAP standards for the removal of asbestos and lead-based paint. Transportation analysis confirms the project meets VMT and TDM screening criteria, though it requires a fair-share contribution toward safety corridor improvements on North Capitol Avenue.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Milligan Parking Lot Project
Solicitation # SP20-019
The Milligan Parking Lot Project, specifically the Madera Residential Project Update 4 under solicitation SP20-019, is a Special Use Permit Amendment approved by the City of San Jose on December 3, 2025. The amendment modifies the project by changing the exterior material from fiber cement board to stucco on levels above the pedestrian level and extending Saturday construction hours from 7:00 a.m. to 7:00 p.m. through August 2027 to reduce the project timeline by up to 90 days. These changes are consistent with the Downtown Strategy 2040 Final Environmental Impact Report and the Envision San Jose 2040 General Plan, with a Notice of Determination confirming that no new significant environmental impacts were identified. The broader development at 255 West Julian Street involves a mixed-use project featuring residential units and retail space. The construction schedule is estimated to span approximately 32 months, starting in early January 2026 and concluding in August 2028, covering phases from demolition and excavation to superstructure and final sitework. Key compliance requirements include adherence to the City's 2030 Greenhouse Gas Reduction Strategy, BAAQMD air quality thresholds, and ADA-compliant curb ramp reconstruction. Additionally, as a Level 2 project, it must submit annual Transportation Demand Management compliance forms and fees to the City Department of Transportation.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS