Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintain existing planted areas and erosion control.

Closed
04-0J3014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
RFB No. 27-0017 Carver Lake Park - Phase 1
Solicitation # 27-0017
The Columbus Consolidated Government is soliciting bids for the Carver Lake Park Phase 1 project in Columbus, Georgia. The scope of work involves comprehensive site improvements, including demolition, clearing, grubbing, earthwork, and grading. Key deliverables include the construction of access drives, parking areas with permeable pavers, concrete sidewalks, curb and gutter, and a 10-foot-wide multi-use trail. The project also encompasses the development of playground and pavilion areas, improvements to the existing splash pad, fencing, site signage, landscaping, and associated storm drainage and utility improvements. The contract will be awarded to the responsive and responsible bidder submitting the lowest base bid. Qualified bidders must be licensed contractors in the State of Georgia, maintain a permanent place of business, and demonstrate sufficient financial resources and construction experience. The project requires substantial completion within 550 consecutive calendar days, with final payment readiness by 580 days. Successful bidders must provide performance and payment bonds totaling 100 percent of the contract amount. The project mandates strict adherence to various federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and the Anti-Kickback Act, while emphasizing a preference for qualified local labor and businesses.
Columbus Consolidated Government

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Cheshire Park Adaptive Turf Field
Solicitation # 2627-03
The Town of Cheshire is soliciting competitive bids for the Cheshire Park Adaptive Turf Field project (ITB #2627-03) in Connecticut. This project utilizes the AIA Document A101-2017 Standard Agreement and requires a lump sum base bid, with optional alternates for field lighting, a scoreboard, dugout shelters, a batting cage, and a turf groomer. Sealed bids must be submitted in opaque envelopes—including one original, one copy, and one electronic copy on a USB drive—to the Department of Public Works and Engineering by 11:00 AM on December 1, 2026. Bids must be signed by a principal officer or owner and include a bid bond or certified check for 5% of the bid amount for contracts exceeding $50,000. The scope of work involves comprehensive site development, including grading, utilities, and sediment and erosion controls, supported by geotechnical and topsoil analysis. Technical requirements include a 25-year warranty on light levels and strict adherence to IESNA RP-6-22 for illumination measurements. Contractors must comply with prevailing wage laws, the Americans with Disabilities Act, and state set-aside requirements for minority and women-owned businesses. Quality control is rigorous, requiring specific handling and storage of coated reinforcing steel and mandatory field density testing. Project administration is overseen by the Town Engineer and the Director of Public Works, with payments processed using EJCDC Form No. C-620.
DAS Procurement

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
Three Lakes Park Stream Restoration
Solicitation # 26-3028-11EAR
The Three Lakes Park Stream Restoration project, solicitation number 26-3028-11EAR, is an invitation for bids to restore approximately 1,520 linear feet of an unnamed tributary to Upham Brook in Henrico County, Virginia. The project utilizes a Priority 2 restoration approach, which involves constructing a new bankfull channel within a newly excavated lower floodplain bench, designed as a low sinuosity C3/C3b type channel. Key technical requirements include the installation of wood and rock structures for grade control, the planting of native vegetation to stabilize banks, and adherence to the 2024 General VPDES Permit for Discharges of Stormwater from Construction Activities. The contractor must possess a Virginia Contractor’s License Class A and be a registered contractor in the Commonwealth of Virginia. The contract is a unit price agreement with a performance period of 365 calendar days from the written Notice to Proceed. Bids must be submitted via the ProcureWare portal by 3:00 PM on December 16, 2026, and must include a bid bond, cashier's check, or certified check for 5% of the Total Unit Price Base Bid. Award will be granted to the lowest responsive and responsible bidder. Required documentation includes a bid signature sheet, business category classification, and Virginia State Corporation Commission registration. A non-mandatory pre-bid meeting and site visit are scheduled for December 2, 2026, at the Purchasing Division Office.
Henrico County

POSTED

about 10 hours ago

DEADLINE

in about 1 month

General Info

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
04-Son-1-26.7/27.1   ***   SONOMA COUNTY NEAR JENNER FROM 0.3 MILE TO 0.7 MILE NORTH OF MEYERS GRADE ROAD

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Paving, cold plane AC pavement, drainage, and delineation.
Solicitation # 01-0J9304
The California Department of Transportation has issued solicitation 01-0J9304 for a project involving paving, cold plane AC pavement, drainage, and delineation located in Lake County on Route 29 and 53. With an estimated value of 14.4 million dollars, this cost-plus-time contract requires bids to be submitted via the Bid Express website with a security deposit of at least 10 percent of the bid. Contractors must propose a performance period between 100 and 140 working days. The project includes strict environmental and quality mandates, such as the implementation of Best Management Practices to protect water quality and mandatory equipment pressure washing at 140 degrees Fahrenheit and 800 psi to prevent the spread of soil-borne pathogens. Technical requirements include adherence to MASH Test Level 3 for temporary barrier systems and specific ACI Concrete Field-Testing Technician Grade 1 certifications for quality control personnel. The project is subject to the Davis-Bacon Act, Build America Buy America standards, and requires the submission of DVBE quotes. Safety representatives must hold Cal/OSHA or OSHA 510 certifications along with valid first aid and CPR certifications. Payment terms mandate that subcontractors be paid within 7 days of progress payments, while material suppliers must be paid within 30 days. Performance is supported by digital terrain models, alignments, and profiles provided in LandXML and DGN formats.
Highway, Street, and Bridge Construction

POSTED

about 18 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Bridge scour repair.
Solicitation # 04-2J88U4
The California Department of Transportation is soliciting bids for bridge scour repair at the No Name Creek Bridge on a state highway in Napa County near Calistoga. The scope of work involves protecting the existing culvert, repairing scour holes at exposed footings using shotcrete, and excavating the channel streambed to final grade. Key technical requirements include the installation of Partially Grouted Rock Slope Protection (PGPSP) with void filler, repairing exposed rebar soffit spalls via structural concrete bridge repair, and grouting voids behind and under culvert walls. All work must adhere to the 2017 AASHTO LRFD Bridge Design Specifications with California Amendments and the 2025 Standard Plans and Specifications. The project is estimated to take 80 working days, with a strict environmental restriction limiting work within creek channels to the period between June 15 and October 15. Contractors must provide a baseline schedule and weekly reports, and quality control personnel must hold an ACI Concrete Field-Testing Technician, Grade 1 certification. The contract mandates a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Bids must include a security deposit of at least 10 percent of the bid amount. Payment is managed through the Department's prompt payment monitoring system, requiring material suppliers to be paid within 30 days of progress payments.
Highway, Street, and Bridge Construction

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS