Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Maintenance Wash Racks Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Maintenance Wash Racks Project, managed by Caltrans District 5 in San Luis Obispo and Santa Barbara, involves the construction of four new wash rack stations at maintenance facilities located along Highways 1, 41, and 101 in California. The project aims to replace existing, non-compliant cleaning infrastructure with modern systems that adhere to current standards and regulations. Each new facility will include settling basins for solids removal, oil-water separators for treating washwater, protective covers to reduce environmental exposure, and compliant wastewater disposal systems. This project is currently identified as a forecast with a posted date of August 7, 2025. It is categorized under NAICS code 237310 and has been granted a categorical exemption under CEQA 15301 Class 1 for minor alterations to existing facilities. Performance will take place at specific post miles in Buellton, San Luis Obispo, Shandon, and areas near Salinas, Monterey, and Santa Cruz. While the project is led by Caltrans District 5, specific contractual details such as pricing, delivery schedules, and formal evaluation factors have not yet been established.

General Info

Caltrans to replace four non-compliant wash racks with environmentally compliant systems along Highways 101, 41, and 1.

Agency

California → Caltrans, District 5 - San Luis Obispo/Santa Barbara

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Jonata Park Rd, West Centre Street, Elvee Drive, Capitola Road Extension, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Maintenance Wash Racks Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Office AddressN/A
Contacts
Kylen KennedyEnvironmental Scientist

Full Description

Show more
The project proposes to construct new wash rack stations at each of the maintenance stations which will include settling basins, oil-water separators, protective covers, and wastewater disposal systems. The purpose of the project is to remove the existing wash rack facility, if any, and construct a new wash rack system with cover at four separate maintenance stations. The need of this project is to provide a wash rack facility to clean dirty equipment at each location in conformance with current standards and regulations.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS