Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Mandela Station Mixed-Use Development at Bay Area Rapid Transit District (BART) West Oakland Station Remedial Action Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Oakland

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Oakland, CA, 94607

Set-Aside

NONE

Documents

(2)

Notice of Determination for Mandela Station Mixed-Use Development RAP

PDFnotice-of-determination

Addendum to Final EIR for Mandela Station Mixed-Use Development

PDFenvironmental-impact-report-addendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oakland
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Oakland
Office AddressN/A
Contacts
Sarah LareseProject Manager
Art MayProject Development Partner

Full Description

Show more
The Department of Toxic Substances Control (DTSC) approved the Remedial Action Plan (RAP) for the Mandela Station Mixed-Use Development located on a portion of the West Oakland BART Station at 1451 7th Street in Oakland, California (Site). Soil at the Site was found to be impacted by metals (lead, arsenic, and mercury), polycyclic aromatic hydrocarbons (PAHs), and polychlorinated biphenyls (PCBs). To address impacted soil at the Site, the following remedial actions will be implemented: 1. Soil within the development areas where metals and chemicals are identified will be excavated and removed for construction of new buildings. Approximately 18,200 cubic yards of soil will be excavated from the Project Site to accommodate building foundations for the T-1, T-3 and T-4 development projects and the T-2 Plaza. Of this excavated soil, approximately 8,550 cubic yards of contaminated soil (or about 47%) will be transported to an appropriate offsite waste disposal facility, and the remaining 9,650 cubic yards of clean soil will be used to backfill the foundation excavations. 2. The remaining soils will be capped by future structures and hardscape features following redevelopment (i.e., an “engineered cap”). 3. If remaining soil within the development area contains metals or chemicals above cleanup goals, the engineered cap will be monitored regularly and maintained to protect the integrity of the remedy following protocols established in a future operation, maintenance, and monitoring plan. 4. A Land Use Covenant will be recorded which will restrict certain activities at the Site. 5. Annual inspections will be required based on the Land Use Covenant to ensure that all Site restrictions are followed. The City of Oakland, as Lead Agency, prepared the West Oakland Specific Plan Environmental Impact Report (EIR) and certified the Final EIR in 2014 (State Clearinghouse Number 2012102047). As Responsible Agency under the California Environmental Quality Act (CEQA), DTSC conducted an independent analysis of potential environmental impacts associated with the remediation activities identified in the RAP. DTSC prepared an Addendum to the Final EIR for the West Oakland Specific Plan incorporating the environmental evaluation of the proposed RAP remediation to the City’s Project.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Asbestos Abatement Services
Solicitation # 2031ZA26N00066
The Bureau of Engraving and Printing is conducting market research via a Sources Sought notice to identify qualified small business contractors for asbestos-containing material removal services at the Eastern Currency Facility in Washington, D.C. The government intends to establish a three-year Firm-Fixed-Price Blanket Purchase Agreement starting November 22, 2026, with individual task orders issued based on the contractor's established pricing schedule. The scope of work involves abatement services within the Main and Annex Buildings, requiring strict adherence to federal and local regulations, including NESHAPS, OSHA, and District of Columbia Municipal Regulations. Key operational requirements include the use of 6-mil polyethylene bagging for waste, double-bagging of glove bags and wrapped materials, and maintaining waste in a wet state. Contractors must provide a project-specific abatement plan and cost estimate within five days of inspection and ensure all debris is removed from the premises within seven days. Final acceptance is contingent upon clearance sampling conducted by an independent industrial hygienist. Due to the secure nature of the facility, personnel must obtain access to the Controlled Industrial Area, maintain strict confidentiality, and adhere to rigorous security protocols, including the prohibition of weapons on site. Interested respondents must submit a capability statement and specific socioeconomic information by September 25, 2026, to assist the government in determining the final acquisition strategy.
Office Of The Chief Procurement Officer

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS