Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Harbor View Project Final EIR

Forecast
2018012016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Harbor View Property Removal Action Workplan is an environmental remediation and commercial development project covering approximately 27 acres across eight contiguous properties in Redwood City, California. The primary objective is to address asbestos-impacted soils through a strategy of on-site consolidation and capping. The project involves relocating asbestos-containing materials preferentially under planned hardscape areas and sealing them with a demarcation layer and a minimum 2-foot thick clean import fill cap. Approximately 171,700 cubic yards of clean fill will be imported to raise the site grade and create these caps, with a strict requirement that no impacted soils be disposed of off-site. To ensure safety and regulatory compliance, the project mandates the implementation of a Dust Control Plan, an Asbestos Dust Mitigation Plan, and an Asbestos Air Monitoring Plan featuring real-time monitoring. Additionally, all future buildings must be equipped with a Methane Mitigation System to meet San Mateo County Environmental Health Services requirements. Following construction and system testing, the project requires the execution of an Operations and Maintenance Plan, an Operations and Maintenance Agreement, and a Land Use Covenant. The project is overseen by the Department of Toxic Substances Control and complies with the California Environmental Quality Act, as documented in the Final Environmental Impact Report.

General Info

Asbestos remediation and capping for 27 acres of commercial development in Redwood City.

Place of Performance

Blomquist Street and Stein Am Rhein Court, Redwood City, CA, 94063

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The Harbor View Property Removal Action Workplan (RAW) is associated with a commercial development project located on approximately 27 acres over eight contiguous properties located at 320, 330, 340, 350, and 410 Blomquist Street, 19 Seaport Boulevard, and 15 and 30 Stein Am Rhein Court in the City of Redwood City (Site). The Site is located within a commercial/industrial area and is currently primarily vacant, with some historical structures and storage of materials or use as parking. Project activities will address the presence of asbestos impacted soils in connection with planned development at the Site, resulting in the consolidation and capping of asbestos containing materials (ACM) under a minimum of a 2-foot thick clean import fill cap. Limited soil excavation will be performed to relocate soils for consolidation of ACM preferentially under planned hardscape locations and soil would be imported to create a clean fill cap and to raise the existing Site grade. No excavated soils would be taken off-site for disposal, and any impacted soils discovered within the adjacent public right of ways during utility construction would be brought on-Site for consolidation and capping. A demarcation layer would be placed on top of all the consolidation areas that may potentially contain ACM before the clean fill cap is placed. Approximately 171,700 cubic yards of clean fill material would be imported for use in raising the Site grade and creating a 2-foot thick, clean fill cap within landscaping areas. The project includes measures to minimize the creation and dispersion of dust during soil handling and earthwork activities at the Site. A Dust Control Plan/Asbestos Dust Mitigation Plan/Asbestos Air Monitoring Plan, including real-time air monitoring, will be implemented upon the start of earthwork activities. In order to comply with the San Mateo County Environmental Health Services requirements, all future buildings at the sites will be constructed with a Methane Mitigation System (MMS). Once all development work is completed and the MMS is installed and tested, an Operations and Maintenance Plan, Operations and Maintenance and Agreement, and Land Use Covenant will be executed.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
International
Infrastructure - Invitation to Bid - Various Site Duct Cleaning
Solicitation # RFQ-AID-JP-2026-0014
BGIS Global Integrated Solutions Canada LP, on behalf of Alberta Infrastructure, is soliciting bids for HVAC system cleaning, dust collector removal, and lead-contaminated dust remediation at various sites in Alberta, including the Westlock Provincial Building. The scope of work involves cleaning supply, return, and exhaust air ductwork, make-up air systems, and air handling units using source removal methods that comply with NADCA requirements. Key deliverables include NADCA cleaning verification, air monitoring reports, lead wipe sampling, and a final Occupational Hygienist Clearance Letter. Additionally, the contractor must apply Fiberlock IAQ 8500 Sealant to cleaned components, excluding warehouse facilities. The contract will be awarded to the lowest compliant bidder based on a two-step evaluation of submission completeness and the total fixed fee. Performance is subject to strict scheduling constraints, requiring work to be performed on consecutive days outside of regular business hours (0800 to 1600) with prior approval. For quotations exceeding 100,000 CAD, bidders must provide an electronic bid bond of 10 percent and confirmation of performance and labour and material bonds of 50 percent each. All personnel must undergo criminal record checks and security screening at the bidder's expense. Submissions must be emailed to [email hidden] and include a signed Price Submission Form, a surety letter, and the required electronic bid bond.
Infrastructure

POSTED

about 12 hours ago

DEADLINE

in 13 days
View Details
NAICS: 562910
New
SLED
Asbestos Abatement w/ Hazardous Materials Job Order Contracts (JOC 2720 and 2721) - Class C21/C22 License
Solicitation # 2027-RFP-00204
The County of San Mateo Department of Public Works is soliciting proposals for two Asbestos Abatement and Hazardous Materials Job Order Contracts, JOC 2720 and 2721. These contracts are designed for the repair and refurbishment of County-owned facilities and require contractors to hold an active Class C21 or C22 license in the State of California. Each contract has a one-year term with a maximum value of 3,000,000 dollars and an initial bonding amount of 1,000,000 dollars for payment and performance bonds. Work is executed through individual Job Orders using a Construction Task Catalog provided by The Gordian Group, which establishes preset unit pricing for labor and materials. Award selection is based on the lowest Evaluation Criteria Figure, which is a weighted sum of Adjustment Factors. Bidders must submit their proposals by December 10, 2026, including a 25,000 dollar bid bond and comprehensive EEO certifications. Contractors must comply with several regulatory mandates, including the San Mateo County Project Labor Agreement, prevailing wage rates, and ordinances regarding equal benefits and paid jury service. Additionally, the contract requires strict adherence to construction and demolition debris recycling mandates and the maintenance of comprehensive general liability, workers compensation, and motor vehicle insurance.
Public Works - Capital Projects

POSTED

about 16 hours ago

DEADLINE

in 23 days
View Details
NAICS: 562910
New
Federal
F108--620-26-206 Asbestos Abatement
Solicitation # 36C24227R0010
Solicitation 36C24227R0010 is a firm-fixed-price contract for traditional asbestos abatement services at the Montrose VA Medical Center in New York. This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $100,000 and $250,000. The scope of work involves the removal, cleanup, and disposal of asbestos-containing materials (ACM) within a regulated area, specifically targeting approximately 2,300 square feet of floor and mastic, including carpet and levelers, and 100 linear feet of radiator panel insulation and heat shields. All work must adhere to strict OSHA, EPA, DOT, and New York State regulations, as well as VA safety and infection-control requirements. The government will award the contract based on a comparative evaluation of technical capability, past performance, and price. Technical evaluations focus on the offeror's approach to containment and disposal, personnel licensing in New York State, and a record of at least two similar projects completed within the last five years. Key administrative requirements include compliance with the Davis-Bacon Act for prevailing wages, the Buy American Act, and strict limitations on subcontracting. Performance involves rigorous pre-abatement planning, active monitoring to ensure fiber counts do not exceed safety thresholds, and final certification of decontamination. Proposals must be submitted electronically, including signed certificates of compliance and an itemized cost breakdown.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 23 hours ago

DEADLINE

in 10 days
View Details
NAICS: 562910
New
Federal
F108--Contaminated Soil Disposal
Solicitation # 36C26227Q0110
The Department of Veterans Affairs, Network Contracting Office 22, is soliciting quotes for the removal and disposal of approximately 80 cubic yards (estimated 150 tons) of contaminated soil at the VA West Los Angeles Medical Center. The soil consists of a sandy construction base with gravel contaminated with asphalt benzene derivatives. This is a Firm Fixed Price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a 30-day period of performance. The scope of work includes mobilization, the use of 10 cubic yard drag on boxes due to narrow road access, transportation by qualified drivers, and proper manifesting of the soil as non-hazardous material for delivery to a waste acceptance facility. Award will be based on the lowest priced quote, provided the offeror meets strict special standards of responsibility. These requirements include at least two years of experience in contaminated soil disposal, a California Professional Engineer License issued by the California Contractors State License Board, and a 30-hour OSHA safety card issued by the State of California. Additionally, the soil excavator operator must hold a C-12 Contractor License, OSHA 10- or 30-hour training, and a hazardous waste operations 8-hour refresher certificate. Site access is restricted to Monday through Friday, 8 AM to 3 PM, and contractors must coordinate daily with the VA safety representative. Following Amendment 0001, the deadline for receipt of offers is extended to November 30, 2026, at 10 AM PST.
262-NETWORK Contract Office 22 (36C262)

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 562910
New
Federal
J091--Aboveground Fuel Tank Inspection Services - Kansas City VAMC
Solicitation # 36C25527Q0047
The Department of Veterans Affairs, Network Contracting Office 15, is soliciting quotes for a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide annual inspection, maintenance, repair, certification, and fuel oil filtering services for sixteen aboveground storage tanks (ASTs) with capacities of 55 gallons or greater at the Kansas City VA Medical Center. This total SDVOSB set-aside procurement, under NAICS code 562910, supports the facility's Spill Prevention, Control and Countermeasure (SPCC) Plan Program. The period of performance runs from January 19, 2027, to January 18, 2032, with annual inspections required every February. Key deliverables include API 653-compliant certifications, interior and exterior tank inspections, hydrostatic or non-destructive integrity testing, and fuel polishing and recirculation. The contractor is responsible for all labor, materials, and equipment, including the capture, containment, transport, and disposal of all fuel, water, and filter waste using EPA-approved manifests. All work must adhere to API, ASTM, EPA, NFPA 110 Chapter 8, and OSHA 29 CFR 1910 standards. Personnel performing formal inspections must be certified by the Steel Tank Institute to SP001 or be API 653 certified with an STI SP001 adjunct certification. Award will be based on an equal evaluation of price, technical capability, and past performance. Required insurance includes general liability, pollution liability, and workers' compensation, with the Department of Veterans Affairs named as an additional insured.
255-NETWORK Contract Office 15 (36C255)

POSTED

about 23 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Redwood City

Same awarding agency

NAICS: 237110
SLED
Recycled Water Master Plan Phase 2 ProjectThe Recycled Water Master Plan Phase 2 Project is a planning initiative by the City of Redwood City to expand and improve its existing recycled water system. The project focuses on extending the service area to include the East Market Assessment Service Area, which will bring that region under the Recycled Water Use Ordinance. Key infrastructure goals include expanding the pipeline system in the Central and East areas to serve high-demand customers, creating system loops to prevent water stagnation and ensure redundancy, and developing conceptual designs for new recycled water storage tanks, a chlorine booster system, and a potable water storage tank for emergency supply. The project is subject to extensive environmental review under the California Environmental Quality Act, including assessments of air quality, biological resources, cultural resources, and noise impacts. Implementation involves a phased approach with construction starting in March 2026, with buildout horizons extending to 2039 or 2045. Specific compliance requirements include adhering to Bay Area Air District fugitive dust thresholds, maintaining ADA standards for Caltrans facilities, and following strict protocols for the protection of tribal cultural resources and human remains. Technical specifications include the addition of over 30,000 linear feet of pipelines and the potential installation of either a single 2 million gallon buried concrete tank or two 1 million gallon above-ground steel tanks.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
City of Redwood City Focused General Plan UpdateThe City of Redwood City has enacted comprehensive amendments to its Zoning Code and Municipal Code to implement the 2023–2031 Housing Element, streamline development review processes, and improve code clarity and consistency with the General Plan and state law. These changes were adopted through ordinances that waived second readings and repealed prior resolutions related to CEQA guidelines, ensuring alignment with regional housing mandates and environmental compliance requirements under the California Environmental Quality Act. Concurrently, the City Council approved revisions to its Engineering Standards, formalizing technical requirements for construction and infrastructure projects within municipal boundaries. The project, referenced as the Focused General Plan Update, centers on regulatory modernization rather than traditional procurement, with all actions led by the City as the responsible public agency. Environmental compliance was achieved through the preparation and certification of an Environmental Impact Report and the filing of a Notice of Exemption, both documented under State Clearinghouse number 2022100449, with findings and mitigation measures adopted as conditions of approval. All activities and deliverables are confined to Redwood City, with final documentation filed at City Hall and the San Mateo County Clerk’s Office. No federal contract mechanisms apply to this action; there are no contract line items, pricing structures, award evaluation criteria, or federal acquisition regulation clauses. Financial transactions referenced relate solely to administrative filing fees paid to the County Clerk for environmental documentation, not vendor payments or service contracts. The City’s Principal Planner serves as the primary point of contact for project coordination and CEQA compliance, with no designated contracting officer, technical representative, or procurement officer assigned. Proposal submission guidelines are limited to public access channels, including the City’s website and physical drop-off locations, with no formal solicitation, bidding, or offeror certification requirements. Performance is measured by adoption of ordinances and resolutions, public availability of EIR and NOE documents, and adherence to CEQA statutory obligations, rather than by service delivery timelines or commercial milestones. The process reflects a municipal planning and policy update effort governed by state environmental and land use law, not federal procurement rules, and is intended to facilitate housing production and regulatory efficiency through legislative and administrative action.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS