Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Mass Timber and Pre-fabricated Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with the San Francisco Unified School District involves the supply and installation of modular, pre-fabricated, or mass timber structural elements for various facility projects. The selected contractor will be responsible for fabricating and installing mass timber frames or modular building components specifically for early education spaces, ensuring all materials used are DSA PreCheck approved. The scope of work concludes with the delivery of the completed modular units and the overall structural shell. The project is located in San Francisco, California, and falls under NAICS code 236220. Interested parties must submit their responses by the deadline of October 23, 2026. This contract is designed for specialists capable of delivering high-quality, pre-fabricated structural solutions to prime contractors operating within the district.

General Info

Supply and install DSA approved modular or mass timber structures for SFUSD projects.

Documents

This scope was carved out of SFUSD-FACBOND-JEFFERSON DESIGN BUILD-FY27_026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Jefferson Early Education School - New Building

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs modular, pre-fabricated, or mass timber structural elements for prime contractors on San Francisco Unified School District (SFUSD) facility projects. Fabricates and installs mass timber frames or modular building components for early education spaces using DSA PreCheck approved products. Delivers the completed structural shell and modular units.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
EXT MOH | Laguna Honda Early DB Trades Bid
Solicitation # SFGOV-0000012153
The Laguna Honda Senior Housing project, managed by the Cahill/Guzman Joint Venture for owner Mercy Housing, involves the new construction of a 159-unit senior housing building at 375 Laguna Honda Boulevard in San Francisco. The development will integrate health services, a senior center, home health services, and an early childcare education center into a single building. The project is tentatively scheduled to begin in late 2027 with a duration of 22 months. Requested bid trades include design-build services for ground improvements, exterior building maintenance, fire sprinklers, plumbing, HVAC, electrical, and solar panels, as well as design-assist for elevators. Bids are due by November 3, 2026, at 2:00 p.m. via BuildingConnected, with a required budget breakdown covering the base building scope, the senior center shell and buildout, and the early childhood education center shell. Subcontractors must be prequalified through Compass prior to contract award, as selection will be based on prequalification data, past performance, current backlog, and SBE/LBE participation, with a specific SF CMD SBE goal of 25 percent. Labor requirements mandate the use of union labor for carpenters, laborers, and operating engineers, and all work must adhere to prevailing wage and local hiring requirements. Shell construction for the senior and education centers must meet MOHCD standards.
Mayor's Office of Housing and Community Development

POSTED

about 5 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
SLED
TCSG-441-CM Gwinnett Technical College North Fulton Campus Expansion
Solicitation # TCSG-441-CM
The Georgia State Financing and Investment Commission, acting on behalf of the Technical College System of Georgia, is soliciting Construction Management at Risk services for Project No. TCSG-441, the Second Building Campus Expansion at Gwinnett Technical College's North Fulton Campus in Alpharetta, Georgia. The project has an estimated construction cost of 28.7 million dollars and involves the development of a 45,500 square foot instructional facility for healthcare programs, along with an additional 8,000 to 12,000 square feet for welding and HVAC programs. The estimated construction duration is 15 months, with design services anticipated to begin in November 2026 and construction documents expected by September 2027. Eligible firms must hold a State of Georgia General Contractor's License, be registered with the Georgia Secretary of State, and maintain specific insurance coverages, including 5 million dollars in commercial umbrella liability. Financial and safety requirements include a current ratio of 1.0 or higher and an Experience Modification Rating of 1.2 or less. Award selection is based on the highest total score combining a Qualifications Score and a Fee Proposal Score. Contract administration, including payment applications and change orders, will be managed through the e-Builder project management program, and the project must comply with the Energy Efficiency and Sustainable Construction Act of 2008 and Georgia Peach certification standards.
Georgia State Financing and Investment Commi

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the integration of specialized systems including desiccant dehumidifiers and a dry pipe fire suppression system. All work must comply with UFC 3-600-01, NFPA 13, and JBLM Department of Public Works engineering requirements. The project is estimated between $1 million and $5 million, with a statutory cost limit of $5 million. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must begin within 10 calendar days of the Notice to Proceed, with total completion required within 365 calendar days. The contract requires payment and performance bonds for awards exceeding $150,000 and mandates adherence to prevailing wage rates per General Decision Number WA20260111 for Pierce County. Invoicing is to be processed via Wide Area Workflow.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation governed by Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → San Francisco Unified School District

Same awarding agency

NAICS: 238310
New
SLED
Acoustical Wall Panels Installation At Room 109 & 120, Francis Scott Key Elementary School
Solicitation # 12584
Solicitation 12584, issued by the San Francisco Unified School District, seeks informal bids for the furnishing and installation of acoustical wall panels in Classrooms 109 and 120 at Francis Scott Key Elementary School. The scope of work includes the removal and reinstallation of wall-mounted items and furniture, field verification of dimensions and utilities, and the maintenance of rated wall integrity. All work must comply with federal, state, and local codes, including the 2025 California Building Standards. Construction is scheduled to take place between December 19, 2026, and January 1, 2027. The estimated construction value is 60,000 dollars, with a maximum bid threshold of 75,000 dollars. The contractor is required to use a single manufacturer, specifically Armstrong World Industries, Inc., to ensure fit and function. Materials must meet strict performance standards, including ASTM C 423 for sound absorption and ASTM E 84 for surface burning characteristics, with UL labels required on product cartons. Deliverables include the installed panels, a supply of extra materials (5 percent of full-size units and 2 percent of suspension components), and a 2-year warranty upon final completion. Bidders must submit a completed bid form, a detailed proposal, a non-collusion affidavit, and a site-visit certification by October 16, 2026. Upon award, the contractor must provide performance and payment bonds each equal to 100 percent of the contract price.
Drywall and Insulation Contractors

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
SLED
Jefferson Early Education School - New Building
Solicitation # SFUSD-FACBOND-JEFFERSON DESIGN BUILD-FY27_026
The San Francisco Unified School District is seeking a qualified Design/Build entity for the replacement and expansion of the Jefferson Early Education Center located at 1350 25th Avenue in San Francisco. The project involves the demolition of the existing campus and the construction of a new single-story building ranging from 6,000 to 8,000 gross square feet. This new facility will house four flexible classrooms for pre-kindergarten and transitional kindergarten programs, as well as administrative and support spaces. The District has a strong preference for a modular, pre-approved building solution, specifically mass timber, to meet the project schedule. The estimated hard costs for the project are 13.9 million dollars. This is a two-phase procurement process beginning with a Request for Qualifications to shortlist up to five qualified respondents who will then be eligible to submit proposals during a subsequent Request for Proposals phase. To be eligible, firms or joint ventures must have maintained a primary business location in the nine-county San Francisco Bay Area for at least two years, and key personnel must possess at least three years of comparable experience. The selected contractor must comply with the 2026 Project Labor Agreement, the Student Career Pathways and Workforce Development Policy, and all regulatory requirements from the Division of the State Architect and the Office of Public School Construction. Statements of Qualifications must be hand-delivered by October 23, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details
NAICS: 236220
SLED
Gymnasium Windows Replacement At Gateway KIPP Charter Schools
Solicitation # 12600
The San Francisco Unified School District is soliciting informal bids for project number 12600, which involves the repair of selected gymnasium windows at Gateway KIPP Charter Schools located at 1430 Scott Street, San Francisco, California. The scope of work requires a contractor with a Class B General Building Contractor license to remove broken glass panes and board them up using 1/2 inch exterior plywood. The remediation covers 16 total panes across the North, South, East, Northwest, and Southwest elevations, as well as the Workout Room East elevation. Construction is scheduled to take place between November 23rd and 27th, 2026, and the selected contractor must provide a 2-year warranty upon final completion. The estimated construction value for this work is 30,000 dollars, and as an informal bid, quotes exceeding 75,000 dollars will not be accepted. Interested bidders were required to attend a mandatory pre-bid conference on September 29, 2026. Complete bid proposals, including an informal bid sheet, prime and subcontractor listings, a non-collusion affidavit, and a site-visit certification, must be emailed to Project Manager Jaiyu Hughes by October 7, 2026, at 2:00 p.m. Upon contract award, the contractor is required to provide performance and payment bonds each equivalent to 100 percent of the contract price.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in about 19 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS